Appendix: Simplified Instructions for Operating the HP 5890 GC/FID and Air Sampling Systems

Similar documents
Air Quality 2b - PFGC/FID Analysis of Benzene and Toluene in Automobile Emissions

5890II GC Standard Operating Procedure 9/2/2005

Chromat Calibration Updated October 27th, 2017

Cover Page for Lab Report Group Portion. Head Losses in Pipes

Varian 3300 Gas Chromatograph Abbreviated Operating Instructions

Calibration of a GC955

Air Ball! Evaluation copy

NITROGEN INFLATION SYSTEM NG-4, NG-6, NG-12, NG-18

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

AKTA pure 25 New Owner s Intro

Using the Akta Prime plus October 22, 2012

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Equipment Operating Procedure Glove Box

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

FROG-4000 TM Chemical Analysis System

System Overview. TCD Detector temperature setpoint Regulator

Air Ball! LabQuest Vernier Gas Pressure Sensor Vernier Motion Detector basketball stopper with needle, stopper stem and tubing attached meter stick

Ammonia Treatment Instructions Page 1 of 5

Determination of Zn using Atomic Absorption with Multiple Standard Additions

FROG-4000 TM Chemical Analysis System

Automated Determination of Dissolved Gases in Water Anne Jurek. Abstract: Discussion:

Glove Box Installation Manual

SRI Model H2-40 Hydrogen Generator Operation and Maintenance Nov 2006

Manual for continuous distillation

Experiment GC : Analysis of BTEX by GC-FID

1. Study the performance of a binary distillation column operated in batch mode.

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

Quantitative Analysis of Hydrocarbons by Gas Chromatography

Warnings: Notes: Revised: October 5, 2015

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility.

Cover Page for Lab Report Group Portion. Pump Performance

FROG-5000TM Chemical Analysis System User s Manual

256 Pneumatic Pressure Indicator

Douglas Call 4/11/2008 1/5. Ammonia Treatment

Boyle s Law: Pressure-Volume Relationship in Gases

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

Rejuvenation Instructions

How Do I Install My Garden Master Bucket Garden?

ARC Unofficial Manual to the Solvent Dispensing System. Designed by J. C. Meyer

DETERMINATION OF TETRAHYDROTHIOPHENE IN AMBIENT AIR BY GAS CHROMATOGRAPHY WITH A PFPD DETECTOR COUPLED TO A PRECONCENTRATION TECHNOLOGY

General Specifications: Forensic. Petrochemical Environmental. Lab Quality Analyses in the Field, It Goes with you Anywhere!

SOP: Buck Scientific BLC-20P HPLC Operation

ASTM 3612/TOGA/Dissolved Gas GC Revised October 2013

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

I have to say that I had no idea about compressors. That means it s easy for everybody.

EXPERIMENT XI. Careful!! Improper handling of the vacuum line may result in the release of SO 2 which is an irritating and suffocating gas.

WIDDER TOOLS. HPICAL Calibration Station 1 (203)

Multiple Gas#5 GC configuration Jan 2016

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

User s Booklet for the Wyatt minidawn Light Scattering Instrumentation

Parallel Reactor Standard Operating Procedure THIS SOP IS NOT MEANT TO REPLACE HANDS-ON TRAINING FROM QUALIFIED PERSONNEL!

with O 2 Controller Instruction Manual

Emulsiflex C3 Homogenizer Protocol

This GC has two columns (I think new columns can be ordered from Restek)

Installation of Your SprayMaster System

Using the UltraRAE. Firmware 2.35

DURRIDGE STAINLESS STEEL SOIL GAS PROBE

Ghost Peaks: How to Fix a Haunting Problem. Jacob A. Rebholz Teledyne Tekmar VOC Product Line Manager

Cover Page for Lab Report Group Portion. Flow Visualization in a Water Channel

Experiment 11: The Ideal Gas Law

Automated Determination of Dissolved Gases in Water Anne Jurek

Troubleshooting. Select the Table of Contents here Rheodyne All rights reserved

Experiment 18 Properties of Gases

Build Your Own Flamethrower Step-by-step Manual

Endo-Flush Order # ZUTR30004 OPERATION MANUAL. Zutron Medical, LLC W 98 th St #40-27 Lenexa, KS Phone Fax

Instruction Manual Dräger MSI P7 and MSI P7 plus

Declining Weight Blending System Quick Start Manual E Main St Marshall, IL Phone: Fax: Website:

Lab 1: Pressure and surface tension. Bubblers, gravity and the mighty paper clip.

LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY)

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

Automated Determination of Dissolved Gases in Water By Headspace Calibration of Mixed Gases Anne Jurek

HPICAL Operation & Data Logging Procedures. Click spacebar to advance through slides 1

SOP for use of the SX19 Stopped-Flow Instrument

AUTOMATIC TIRE INFLATOR # MW-60, MW-60-4WAY & MW-64HP

RK-IR Sample Draw Aspirator Adapter Operator s Manual

TQC Bresle Chloride test 2008

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

6890 GC Not Ready Messages (A16010)

Baby Booster Manual. KISS Rebreather, LLC. MSL Jetsam/ Baby Booster Manual R.2

PRE CUT CAR WINDOW TINTING INSTALLATION GUIDE

ELE INTERNATIONAL COMPRESSION TESTER Standard Operating Procedure

Mass Spec will not Autotune

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

Operation of the Perkin Elmer TGA-GC/MS

S/Y MORSKI ZEKAN TECHNICAL INFORMATION

490 Micro GC Site Preparation Checklist

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

USER MANUAL OPERATION AND THE USE OF A CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM

no peaks missing peaks too small peaks increasing retention decreasing retention

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Read this first. Zetasizer nano series Self installation and Quick start guide MRK825-02

AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by:

Medical Instruments in the Developing World

CSA Sample Draw Aspirator Adapter Operator s Manual

then the work done is, if the force and the displacement are in opposite directions, then the work done is.

Transcription:

Appendix: Simplified Instructions for Operating the HP 5890 GC/FID and Air Sampling Systems The bucket brigade air sampler. For the square Tedlar bags with the push/pull valves: Put the valve of a tedlar bag through the hole in the lid of the bucket. The big part of the valve should fit snugly in the hole. Be careful to only handle the hard plastic part of the valve, since it s really easy to break the valve loose from the bag, ruining it. {They cost $50 each.} For the rectangular Tedlar bags with the twist valves: Put the tedlar bag in the bucket and attach the tubing to the valve stem and open the valve. Be careful to only handle the hard plastic part of the valve, since it s really easy to break the valve loose from the bag, ruining it. {They cost $50 each.} Put the lid on the bucket, being careful not to smash the tedlar bag in the lid. You will need to pound a bit on the lid to get it well seated all the way around. Connect the flexible tubing from the hand-held vacuum to the copper tube at the bottom of the bucket. When you re ready to grab a sample, open the valve on the tedlar bag (if it is the push/pull design) by pushing it in about a cm. {It should go in very easily, be careful not to push the valve back through the lid of the bucket. (You might want to try this before you put the lid on the bucket to see how it works.)} Turn on the hand-held vacuum. {The vacuum pulls air out of the bucket making the Tedlar bag inflate (similar to the way your lungs work) without letting the air come in contact with anything but the valve and the bag, both of which are made of clean, non-reactive Teflon.} Either wait for a suitable amount of time (after the first bag, you ll have a feeling for this) and then switch off the vacuum, or listen for the bag to stop crinkling which it does while it s filling. {Be careful about running the vacuum too long, we re not sure how long the batteries will last - but you need the bags to be full.}

Close the push/pull valve on the sampling bag by pulling out on it. Take the lid off the bucket, close the valve if you are using the twist type valve and remove the Tedlar bag from the bucket, again being careful to hold onto the hard part of the valve. If the bag didn t fill completely, you can put the lid back on and try some more vacuum. Otherwise, retain the bag for analysis and get the next one ready for sampling. Rinsing the bags After all samples have been tested Pull all of the air out of the bag using the house vacuum (yellow tap) and then fill the bag with the house air (orange tap) and re-empty the bag with the vacuum. Do the fill and empty cycle at least twice. {It is highly recommended that you do this before collecting any samples to ensure that the bags have been cleaned since the group before you might not have done this. Also, you can do more cycles if you are concerned that there may be carryover between air samples. Leave the bags empty with the valves closed for the next lab.} The water displacement method for measuring the volume of air in the bags (low tech, but reasonably accurate) Put the valve through the hole in the square piece of plexiglass with the valve facing up. Put the lid (with bag attached) on top of the volume sampling apparatus, with the bag pointed down (towards the water). Turn on the water and let run until the Plexiglas cylinder is full. (Make sure that the lid and bag are pushing firmly against the water in order to ensure that you are only measuring the bag s volume and not any extra air in the container. Remove the lid and bag from the volume sampler and measure the depth of the airspace above the water. Now calculate the volume of the bag. The GC/FID system including computer data system and printer

{Running this experiment is kind of involved, so if there s anything that isn t completely clear to you, please ask the TA. They ll light the FID for you and hang around the first couple of times you do an injection, just to make sure everything goes ok.} Lighting the FID (the TA may have done this already, if you aren t sure, ask) Make sure that the nitrogen gas is on and flowing (outlet pressure should be around 25 PSI and black outlet valve should be open.) Make sure that the computer and monitor are on if the screen is blank or shows a screensaver, just wiggle the mouse. If the computer is off, switch it and the monitor on; when it boots up, it will give an error message that you get around by pressing F1. It should start up the rest of the way by itself. The screen in the upper left hand of the display shows a set of lines, one black and the other green and a few controls: attenuation, time, and zero (button). Make sure that the attenuation is set at 0 (zero) and press the zero button. The black line should move on top of the green line. On the front panel of the GC, press the Detector A button the display should say Det A 200 200, meaning that the detector is set for 200 and that it s at 200 degrees C. Open the main tank valve and the black outlet valve on the hydrogen and compressed air cylinders. If you haven t worked with compressed gases before, have the TA help you, since this can be dangerous if done wrong. The outlet pressures for hydrogen should be 15 psig and for air should be 40 psig. Turn the black knob in the upper left hand panel of the GC (labeled air) all the way counter-clockwise (open) and then do the same with the hydrogen, which is right below the air, and finally open the open the aux gas (nitrogen) valve. (These are all on/off type valves, so you don t have to worry about setting them.) Let the gases run for a minute or so, and open the cover on the right side of the top of the GC. The little metal chimney is the FID. Press the light FID button - usually the gas will suck down in and you ll hear a gentle pop when the gas lights. You should also see a big jump in the signal (black line) trace on the computer monitor, about 10 seconds after you light the FID. What we re looking

for here is a big peak followed by a signal that is bigger than the zero level, which then usually drifts down slowly with time. If you don t see this, the signal will probably spike up and drop right back down to zero. Then you have to wait a few seconds and try again. Sometimes it works on the first try, but there have been times when I ve had to try up to twenty times. (If the FID ignition button isn t working, then you can also light the FID by using the fireplace lighter) Hopefully you won t need to fuss with this too much to get things going. Once it is on, we leave it on for the whole day. It needs to stabilize for around ten minutes before you run the first chromatogram of the day. If it blows out at some point during the experiment, you can just relight it again while the chromatogram is running (if you figure out that it has gone out.) Since the toluene comes out late in the chromatogram, you can usually get this done in time to avoid losing that run. At the end of the day, turn off the three valves on the GC (hydrogen then air then aux gas) and the tank and outlet valves on the hydrogen and compressed air bottles. DO NOT turn off the nitrogen cylinder as this will destroy the GC column {~500 dollars to replace. We usually leave the GC and computer running all the time during the week.} Running a Chromatogram (there are more detailed instructions in the experimental webnotes for this lab) Put the bag on the inlet tubing, open the valve on the bag, make sure the injection valve is in the LOAD position, and turn on (or leave on) the air pump. If you are doing a cryogenic preconcentration run, put the cup of cryogen around the metal sampling loop for a predetermined length of time (usually 5 minutes.) Without cryogenic preconcentration - When you are ready to inject a sample onto the GC, move the metal hook in lower left front panel of the GC from LOAD (horizontal) to INJECT (vertical - clockwise 90 degrees, from stop to stop - you ll

feel what I mean) and then quickly reach up and push the START button on the GC. With cryogenic preconcentration Remove the cup of cryogen, switch the valve from LOAD to INJECT, put the cup of water on the metal loop, and then push the START button on the GC. The GC sends the start signal to the computer which will initiate the temperature program. The display on the upper right of the computer should change color from Green to Blue and the status should change from Ready to Running. The running signal display in the upper left corner on the monitor should show a red vertical line, indicating the start of the chromatogram. You can watch peaks come out of the GC on this display, and you can adjust the attenuation control to keep things on screen (this doesn t change anything about the actual signal collection.) About 1.7 minutes into the chromatogram, you ll see a small peak which is the air that you injected coming out through the detector. After about 1 minute, switch the sampling valve on the GC back to LOAD (from INJECT.) {This isn t really time critical, but it s necessary to do it before you start the next sample. And if you leave the pump on all the time, the loop will be cleaned while it s in the LOAD position. Finally you sometimes see a little air peak from leakage that occurs when the valve is switched from one position to the other, and its helpful if that peak is always in the same place.} When the chromatogram is finished (18.75 minutes) the status display will turn to Red (and say Not Ready ) while the oven cools back down to 125 and stabilizes. {You will also see the chromatogram flash up on the screen and then disappear. To go back and look at the chromatogram, you can choose (on the computer) DataAnalysis MainScreen and to get back to the normal display Files Return to Top.}

After about 5 minutes the display will turn Green and say Ready again to indicate that you can initiate another run. {If you re doing a preconcentration run, the trapping step takes over 5 minutes, so you don t have to wait to start that part.} VERY IMPORTANT the thing that we can print out, that contains all the data you really need, is the Report Screen that is in a window on top of the normal display (and usually pushed way down to the bottom of the screen.) You have to print this BEFORE the next chromatogram finishes, or it will be overwritten by the next set of data. The report should print automatically, but if you need to print a report, select (on the Report menu) Tabulate Print. Usually you ll want to note (circle, underline, etc.) which of the peaks in the chromatogram is the toluene and xylene sometimes the chromatogram display (DataAnalysis MainScreen) can help you figure out which is which. It can be hard to figure out later. For TA s: Preparation of m-xylene standard Clean and half-fill a tedlar bag with house air. Add 2.5 μl neat m-xylene through the septum port. Fill the bag the rest of the way (be careful to not overfill and pop the bag) with house air and mix thoroughly. Measure the bag volume and provide it to the students so they can calculate the stock m-xylene concentration. Revised 2012-1-13 DBA