Cross Street Corridor Non-Motorized Enhancement Project Project Description

Similar documents
Chapter 2: Standards for Access, Non-Motorized, and Transit

Tonight is for you. Learn everything you can. Share all your ideas.

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Living Streets Policy

Broad Street Bicycle Boulevard Design Guidelines

Executive Summary Route 30 Corridor Master Plan

MARTIN LUTHER KING JR. WAY

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Circulation Improvement Strategy. Chapter 5: Improvement Strategy. Cross Street Neighborhood Improvement Plan

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

5 Circulation & Parking

Raymond Avenue: Rightsizing Improved Safety and Pedestrian Experience

Non-Motorized Transportation 7-1

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Chapter 3: Multi-Modal Circulation and Streetscapes

Bicycle Facilities Planning

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

East Burke Transportation, Safety and Capacity Improvements

Streetscape: Core Shopping District

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5 CIRCULATION AND STREET DESIGN

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Complete Streets. Designing Streets for Everyone. Sarnia

STREETSCAPE CONCEPT PLAN

Mainstreet Master Plan Land Use

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

St. Francis Drive through the City of Santa Fe Corridor Study

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

City of Charlottesville Bicycle and Pedestrian Master Plan Update

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Pennsylvania Avenue (CR 484) Design Alternatives Study

Austell Road Access Management Plan Public Meeting February 17, 2009

MASTER BICYCLE AND PEDESTRIAN PLAN

Lincoln Highway Streetscape Plan Concept Plan

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

MIXED USE AND STREETSCAPE INTEGRATION Avondale Will Basil Juliana Zannotto

NEWMARKET UPHAM S CORNER

This page intentionally left blank.

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

TRANSPORTATION COMMISSION Agenda Staff Report

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

EXECUTIVE SUMMARY. Vision

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

The Wiggle Route in Context

Chapter 5 Future Transportation

9/21/2016 VIA . RE: The Knot (DR16-270)

Perryville TOD and Greenway Plan

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

CONNECTING PEOPLE TO PLACES

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CITY OF ELKO BICYCLE AND PATHWAY PLAN

5. Automobile Circulation, Wayfinding and Signage

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

Prince George s County plans, policies, and projects

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

PRESS RELEASE San Joaquin Council of Governments

Report. Typical Sections. City of Middleton, WI

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

C C C

Why invest in the 1 Street S.W. Corridor?

Plainfield Gateway. Plainfield Context

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

WELCOME. City of Eden Prairie West 70 th Street

CURBSIDE ACTIVITY DESIGN

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

Appendix A: Crosswalk Policy

complete streets design and construction standards public primer City of Edmonton

Observations and Ideas: Toomer s Corner Streetscape Improvements

Safe Routes to School Action Plan Aberdeen, Idaho

City of Birmingham Draft Multi-modal Transportation Plan

S T A T I O N A R E A P L A N

Active Transportation Facility Glossary

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

6.4 RECOMMENDED IMPROVEMENTS

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Introduction. North 12 th Complete Street Project Overview

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Transcription:

Cross Street Corridor Non-Motorized Enhancement Project Project Description A cooperative study of the Cross Street neighborhood was completed in May 2002 by the City of Ypsilanti, the Depot Town Downtown Development Authority (DTDDA), Eastern Michigan University (EMU), and the Washtenaw Area Transportation Study (WATS). The study identified many potential improvements, including the addition of parking and a bike lane on West Cross Street, completed in 2005, as well as those improvements proposed here in this non-motorized enhancement project. The proposed improvements will continue to strengthen the links between the City of Ypsilanti, Depot Town, and EMU through non-motorized streetscape improvements along Cross Street. The Cross Street Corridor Non-Motorized Enhancement Project is twofold, with improvements planned for both West and East Cross streets. West Cross runs adjacent to EMU and heads west toward Ann Arbor; on the other side of the Huron River, East Cross is in the midst of Depot Town and heads east toward the townships. A bike trail incorporating Cross Street is also planned for the future. Tied into Washtenaw County's Border-to- Border Trail (i.e., a contiguous, 35-mile-long non-motorized path along the Huron River), this bike trail will connect the existing bike lane on West Cross to the existing one on Huron River Drive. The Michigan Department of Transportation (MDOT) and the City of Ypsilanti are proposing improvements adjacent to EMU, moving east along West Cross Street (BR-12) toward the Depot Town area. More specifically, the improvements will progress east from Normal Street to Huron River Drive, with the majority of the proposed work to be completed east from Normal to Adams Street. Proposed work will consist of 11 bump-outs on the south side of the roadway from Normal to Adams, stamped bituminous crosswalks, tree installation (nonparticipating), and the improvement of street lighting throughout the project limits. These proposed improvements will help promote safer movement of pedestrians crossing the street as well as ingress/egress from parked vehicles. In particular, the improvements to street lighting will benefit all users of the corridor and will ensure a safer and more visible right of way. In Depot Town, the proposed East Cross Street improvements include key components of the Depot Town and West Cross Comprehensive Streetscape Improvement Plan adopted by the DTDDA in August 2004. These key components include the addition of streetscape design improvements to the eastern gateway entrance to Depot Town, at the intersection of East Cross and River Street, along with streetscape improvements on East Cross between Rice and River streets. Other proposed improvements are sidewalk areas and pedestrian crossings with delineated crosswalks; decorative-stamped pigmented concrete; and better lighting for pedestrian safety and convenience. Curb bump-outs with pass-through rain gardens will be installed to aid pedestrian safety, slow automotive traffic, and filter storm water run-off as it drains downhill to the Huron River. The existing clock tower median is also proposed to be extended eastward with a rain garden to assist with traffic-calming and storm water treatment. Trees needing to be removed in the current streetscape will be relocated within the district as feasible. A pedestrian crossing gate will also be installed at the sidewalk railroad crossing for improved pedestrian safety. Via Washtenaw County's Border-to-Border Trail, the proposed bike trail will connect the north and south side of the EMU campus to the cities of Ann Arbor and Ypsilanti. Presently the Border-to-Border Trail runs east from Gallup Park in Ann Arbor, to Huron River Drive across from the campus of Washtenaw Community College, and then through the campus of St. Joseph Mercy Hospital, before passing alongside EMU's football stadium and rejoining with Huron River Drive. The proposed trail will connect the existing path on Cross Street to the one on Huron River Driver, thereby sealing a gap in the Border-to-Border Trail, which runs from one end of Washtenaw County to the other, alongside the Huron River. While locally strengthening the link from EMU (i.e., West Cross) to Depot Town (East Cross), these improvements to Cross Street also serve the greater community, including City of Ypsilanti residents, St. Joseph Mercy Hospital, Washtenaw Community College, and also aspects of the City of Ann Arbor. Plus, in addition to these improvements, a future commuter rail system from Ann Arbor to Detroit is currently proposed to tie directly to Depot Town. This rail system will further improve connectivity of the community to the regions of Washtenaw County and greater Southeast Michigan.

The Cross Street Corridor Non-Motorized Enhancement Project was developed as the result of extensive partnerships between the City of Ypsilanti, the DTDDA, EMU, and the WATS with participation from the public. The Depot Town Merchant Organization, through its major fundraising event, the Michigan ElvisFest, is also participating by providing financial support for the Depot Town portion of the project.

Cross Street Corridor Non-Motorized Enhancement Project Relationship to Category Goals The Cross Street Corridor Non-Motorized Enhancement Project will encompass functional, aesthetic, and safety goals. The twofold project, with improvements planned for both West and East Cross streets, will enhance the communities of Eastern Michigan University (EMU), Depot Town, and the surrounding City of Ypsilanti, and it will also positively affect the City of Ann Arbor, Washtenaw County, and even greater Southeast Michigan. In terms of functional goals, the proposed improvements will encourage increased pedestrian traffic along West and East Cross streets. The campus of EMU will be affected by the increased pedestrian traffic along West Cross; similarly, the shops, restaurants, and recreation areas of Depot Town will be positively affected. In particular, simplified improvements to traffic flow in the Depot Town parking area will have a functional result, as will the reduction and quality improvements to storm watershed because of rain gardens. Aesthetic goals to be met include significant landscaping improvements, which will likewise contribute toward a pedestrian-friendly environment. Crosswalk bump-outs and decorative lighting will enhance West Cross, for example, while the East Cross area of Depot Town will be enhanced by new landscaping, decorative lighting, a pedestrian seat-wall and benches, and the removal of the visual clutter of vending machines. Also critical to the project are safety goals. Cross Street will benefit from new pedestrian-scale lighting, in addition to new crosswalk bump-outs, which will calm traffic and provide physically defined pedestrian-crossing locations. A pedestrian safety gate is proposed at the railroad crossing on East Cross in Depot Town. A reconfiguration of the public parking area of Depot Town to accommodate one-way traffic flow is also proposed, to minimize conflicts between vehicles and pedestrians. In addition, barrier-free accessible accommodations have been incorporated into the designs, including proper crosswalks, sidewalk slopes, and parking lot access. The Cross Street Corridor Non-Motorized Enhancement Project overall proposes to enrich the pedestrian experience along Cross Street, from EMU to Depot Town, by creating a safe, non-motorized, appealing environment. These many proposed improvements will connect pedestrian foot traffic between EMU and prime business districts on West and East Cross; and the proposed bike trail will extend access of the Cross Street area to the greater community. Depot Town is a particularly vital business district, serving the City of Ypsilanti, EMU, and the surrounding townships via Cross Street, which is itself a destination. Pedestrian-friendly improvements to Cross Street therefore would benefit university students and staff; residents of the City of Ypsilanti; and also businesses and their patrons. A greater sense of cooperation within the community will be fostered in turn. Plus, the proposed bike trail will connect the north and south side of the EMU campus to the cities of Ann Arbor and Ypsilanti via Washtenaw County's Border-to-Border Trail. In doing so, it will connect the existing path on Cross Street to the one on Huron River Driver, thereby sealing a gap in the Border-to-Border Trail.