SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SH&EWMS No.: F-C-QLD-14 Revision Date: July 2018 Revision Due: July 2019

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw

SH&EWMS No.: FC-QLD-017 Revision Date: July 2017 Revision Due: July 2018

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

WORK METHOD STATEMENT STRUCTURAL STEEL

How severely could the risk hurt someone? Low/Insignificant First aid

WORK METHOD STATEMENT TERMITE PROTECTION

SAFE WORK METHOD STATEMENT Part B

WORK METHOD STATEMENT CARPET LAYING

How severely could the risk hurt someone?

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

SAFE WORK METHOD STATEMENT SWMS No Version

The Sample Company Pty Ltd

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

Safe Work Method Statement

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

How severely could the risk hurt someone? Low/Insignificant First aid

Safe Work Method Statement

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

SAFE WORK METHOD STATEMENT

Safe Work Method Statement

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

WORK METHOD STATEMENT ELECTRICAL

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

SAFE WORK METHOD STATEMENT Part 1

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

Accident/Incident Reporting and Investigation Procedures

SAFE WORK METHOD STATEMENT CARPENTER

Temporary load-bearing support for structural alterations or repairs

SAFE WORK METHOD STATEMENT

Safe Work Method Statement (SWMS)

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details.

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

How severely could the risk hurt someone? Low/Insignificant First aid

Contractor OHS Induction. AOHS-05-GUI September 2016

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

SAFE WORK METHOD STATEMENT

SWMS No 009 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 4

Safe Work Method Statement

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

Accident /Incident/Injury Report & Investigation Form

WORK METHOD STATEMENT RENDERING

SWMS No 001 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 5

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

Procedure: Work health and safety hazard management

HAZARD MANAGEMENT PROCEDURE

Safe work method statements

Work Activity (e.g. Road Work): Work Location:.

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

University of Vermont Department of Physical Plant Personal Protective Equipment Program

Work Health and Safety Risk Management Procedures

Appendix 4C - Sample SWMS Trenching

Telco Antennas SWMS Working At Height Above 2m

SAFE WORK METHOD STATEMENT (SWMS)

To comply with the OHS Act, the responsible manager must carry out and document the following:

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

Hazard Management Making your workplace safer

Hazard & Risk Management

SAFE WORK METHOD STATEMENT

SAFETY MANAGEMENT SYSTEM

Health & Safety Policy & Plan. Rightway Roofing.

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

B S Glass Ltd Safety procedures- outsourced Workplaces

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

SWMS documented by: Feb Bo Ceprnja Date Feb Feb Feb 2018

METHODOLOGY RISK TABLES TABLE 1 - QUALITATIVE MEASURES OF CONSEQUENCE OR IMPACT TABLE 2 - QUALITATIVE MEASURES OF LIKELIHOOD

HS329 Risk Management Procedure

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

University College Dublin Machinery/Equipment Risk Assessment Template

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

1. Silica Identifying and managing crystalline silica dust exposure

WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST

Site-Specific Safety Plan

PART 4: IMPLEMENTATION & OP

SAFE WORK METHOD STATEMENT

CONTRACTOR SAFETY INDUCTION HANDBOOK

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

SAFE WORK METHOD STATEMENT (SWMS) GENERAL GARDENING with Blowers, Hedge Trimmers, Whipper Snippers, Pruners, Spray Units

Conducting An Effective. Welcome!

SAFE WORK METHOD STATEMENTS

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

SAFETY MANAGEMENT SYSTEM

Safe Work Method Statement Required for all High Risk Activities identified for the Project

Safe Work Method Statement Tasks

SAFETY MANAGEMENT SYSTEM

1. SHEWMS DETAILS. Project No. Valid From

Pre-control risk estimate. Likelihood Risk

SAFETY MANAGEMENT SYSTEM

WHS F029 Job Safety Analysis (JSA) and volume less than 10m2

PLANT RISK ASSESSMENT REPORT

SOP. Working in Confined Spaces

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

Safe Work Method Statement (SWMS) Worksheet

Transcription:

OHS-FRM-103 Rev11 (07/18) SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG ABN 45 081 359 613 Phone: 07 3889 8827 Mobile: 0411 756 719 Page 1 SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019 Work Activity: Electric Jack Hammer Drill Brief Description of Work Activity: Electric Jack Hammer Drill as directed Personnel responsible for monitoring this activity: Rob East Ph: (07) 3265 6537 Codes of Practice/Standards Consulted: Work Health and Safety Act 2011, Work Health and Safety Reg 2011, How to Manage Work Health and Safety s Code of Practice 2011, Hazardous Manual Tasks Code of Practice 2011, Managing Noise and Preventing Hearing Loss at Work Code of Practice 2011, Plant Code of Practice 2005, Hazardous Chemicals Code of Practice 2003, Managing the of Falls at Workplaces Code of Practice 2011,Managing the Work Environment and Facilities Code of Practice 2011, Code of Practice stated in Control Measures. Equipment, refer to the operator manual. Plant, PPE and Equipment required for this activity: Electric Hammer Drill. Safety glasses, Hard hat, Hi Vis, steel capped boots, Long sleeves, hearing protection, dust masks. Details of Maintenance Checks Required for this activity: Plant risk assessment, daily pre start checklist, daily servicing by operator, scheduled servicing by mechanic. Electrical tool tested and tagged. Project / Site: Materials Used: High Construction Work: MSDS Required: If poisoning occurs contact POISONS INFORMATION CENTRE on 13 11 26 Personnel Qualifications Required for this activity: General safety induction, competency based assessment. Review and corrective actions: To be reviewed daily by personnel responsible for monitoring this activity, to be reviewed weekly with formal audit. Hazard report to be completed to address corrective action required. Minor: Complete incident form. Major: Complete incident form with an investigation. Specific training required for this activity: Site specific Induction, SH&EWMS moving plant, SH&EWMS Hazardous Substances. 010 Electrical Hammer Drill Version 11 Created July 2018 Review Date: July 2019 Page 1 of 9

PART 1: Fast Cut Pty Ltd - Job Safety & Environmental Analysis/Safe Work Method Statement Analysis by: Fast Cut Pty Ltd ABN: 45 081 359 613 Issue No. Eleven Copy No. 11 Revision due date : July 2019 Document No. JSA-Fast Cut 010 Doc. Controller Approved: Draft 11 TASK: Using an Electric Hammer Drill JSA-Fast Cut 10 Description of High Construction Work (if applicable): Description of any Relevant Interfaces with Other Trades & Other Activities: PART 2: JSEA/SWMS PROCEDURES 1. The JSEA/SWMS must be specific to the site environment and the particular work-crew, equipment and materials. It must identify plant and equipment to be used, hazardous materials, qualifications/licences of personnel, permits and authorisations required. 2. The JSEA/SWMS must comply with the Principal Contractors Safe Work Instructions, General Safety Instructions Booklet and environmental control plans. It must also comply with and specify relevant codes of Practice, legislation and contract requirements. 3. The workers and supervisors involved in carrying out the work activity must be consulted in identifying the safety and environmental hazards and determining the work methods. 4. Any significant changes to the work process or sequence or to the type of plant or materials used is to trigger a review of this JSEA/SWMS. The need to review/amend the JSEA/SWMS is to be assessed in the event of a LTI/MTI, Near Miss, Environmental Breach, or notice served by a regulatory authority. 5. Changes are not to be made to the Work Methods, Plant or Materials prescribed in this JSEA/SWMS without first consulting with the work team. Changes are to be documented, reviewed and approved. All workers are to be inducted into the changes and a record maintained. PART 3: CHECKLIST & SIGN OFF CHECKLIST - In preparing and reviewing this JSEA/SWMS, the following considerations have been taken into account: Manufacturers/Suppliers Recommendations Previous (similar work) injuries/incidents Experience/competency/licensing of workers/operators/supervisors Hazardous material safeguards Engineering/Client approvals Safety Alerts Site Safety Plan Environmental Management Plan Workcover Codes/Guides Plant/Equipment Suitability Revision 8 Date:10/07/2015 Prepared: Tayla Roberts Reviewed: Rob East Approved: 10/07/2015 Sign: Description of Changes: Reviewed and signed off Revision 9 Date:05/07/2016 Prepared: Tayla Roberts Reviewed: Rob East Approved: 05/07/2016 Description of Changes: Reviewed and signed off 010 Electrical Hammer Drill Version 11 Created July 2018 Review Date: July 2019 Page 2 of 9 Sign:

Revision 10 Revision 11 Date:05/07/2017 Prepared: Tayla Roberts Reviewed: Rob East Approved: 05/07/2017 Sign: Description of Changes: Reviewed and signed off Date:02/07/2018 Prepared: Tayla Roberts Reviewed: Rob East Approved: 02/07/2018 Sign: Description of Changes: Reviewed and signed off PART 4: SAFETY AND ENVIRONMENTAL ANALYSIS & DETERMINATION OF WORK METHODS Project / Site: Principal Contractors Safe Work Method Instructions to be complied with: ALL Requirements of Principal Contractors Safety Instructions Booklet to be complied with: ALL Codes/Standards to be complied with: How to Manage Work Health and Safety s Code of Practice 2011, Managing Noise and Preventing Hearing Loss at Work Code of Practice 2011, Plant Code of Practice 2005, Hazardous Manual Tasks Code of Practice 2011, Hazardous Chemicals Code of Practice 2003 Legislation to be complied with: WH&S Act 2011 WH&S Reg 2011 Permits/Licences/Approvals required: Competent plant operator, Truck driver, Hot work Permit (if required) Summary of Assessed Hazards Working at Height Yes Exposure to hazardous material Yes Human factors Yes Hot work Yes Confined space entry No Release of stored energy Yes Excavation & collapse No Heat stress Yes Manual handling Yes Slip, trips and falls Yes Underground services Yes Working with plant Yes Use of tools Yes Environmental considerations Yes 010 Electrical Hammer Drill Version 11 Created July 2018 Review Date: July 2019 Page 3 of 9

Task Description Hazards Likelihood x Step 1 Pre Start Checks Step 2 Drilling Control Measures Responsible Person Likelihood x Daily Plan Pre start check. Tool Box Meeting Operator Supervisor Vehicle on Site All vehicles to be tested and approved Supervisor for use on site. Fitness for Work Attend Work in a fit state Free from Operator influence of illicit drugs In right frame of mind Report all prescription medication to supervisor. Electrical shock P x S 2 Check for a current test tag Operator U x MI 3 Test earth leakage device Drill and leads are in good working order and well maintained as per manufacturer Cuts, abrasions P x S 2 Correct PPE long sleeves, trousers, safety glasses, hearing protection, gloves & dust mask cap lamp / mono goggles if required, Operator U x MI 3 Flying / Falling Object L x MA 1 Barricade work area. Ensure drill bits are secured. Chuck key has been removed prior to starting Electrical shock P x S 2 Check for a current test tag Test earth leakage device Drill and leads are in good working order and well maintained as per manufacturer Excess Noise Hearing Loss AC x MA 1 Wear approved hearing protection Require others to wear ear muffs or vacate area New Operator R x MI 3 Operator U x MI 3 Operator U x MI 3 010 Electrical Hammer Drill Version 11 Created July 2018 Review Date: July 2019 Page 4 of 9

Task Description Hazards Likelihood x Step 2 Cont d Dust Particles/Slurry splashing eyes Dust/mist breathing Control Measures L x MA 1 All personnel in area to wear safety glasses and dust masks, Mono goggles / face shields if required. Excess dust will be vacuumed with a vacuum continuously during operation. Sprinkling of water to keep dust down. Sweep up dust as soon as practical and dispose of in waste bin. Plenty of water or coolant is used and that the coolant/water is suppressing dust at the point of generation (airborne dust is a health hazard) Excess dust will be vacuumed with a vacuum continuously during operation. Sprinkling of water to keep dust down. Environmental risk Slurry L x MA 1 Dam storm water and pick up with wetvac or CCS EPU Excess dust will be vacuumed with a vacuum during jack hammering Responsible Person Likelihood x New Operator U x MI 3 Operator U x MI 3 Step 2 Drilling Walls Skin Irritation P x S 2 Use correct PPE, long sleeves, trousers, rubber gloves Cutting of services L x CA 1 Make sure client has located all services, especially electricity and has signed work form for service locations before cutting. Fumes P x MA 2 Use Generator in well ventilated area or use mains power. Supply extra ventilation (extractor fans/blower fans). Run extra power leads to remove generator from area, max 25m. Contact office if any doubt about ventilation. Fall injury L x MA 1 Make sure scaffold erected by qualified competent person Received training in working at heights if over 2m Rescue procedure required if over 2m Operator R x MI 3 Operator Operator U x MO 3 R x MI 3 Supervisor U x MI 3 010 Electrical Hammer Drill Version 11 Created July 2018 Review Date: July 2019 Page 5 of 9

Task Description Hazards Likelihood x Step 2 Drilling Walls cont Step 2 Drilling Floors Step 3 Load / unload stores/ equipment Control Measures Falling object injury L x MA 1 Barricades & warning signs to be in position prior to cutting. Personnel not to walk / work under cutting area, wear hard hut if working near. All staff to keep a look out Falling Object L x MA 1 Barricades & warning signs to be in position prior to cutting. Personnel not to walk / work under cutting area, wear hard hut if working near. All staff to keep a look out. May require a spotter Manual handling P x S 2 Ensure loads are lifted / carried using the appropriate methods Responsible Person All Staff All Staff Likelihood x New R x MI 3 R x MI 3 Supervisor/ All U x MI 3 Cuts P x S 2 Correct PPE to be worn All U x MI 3 Step 4 Housekeeping Step 5 Site Specific Hazards & Controls (To be filled out on site) Slips, trips P x S 2 Clean site area as required Supervisor R x MI 3 Equipment damage L x S 2 Ensure equipment is correctly secured prior to leaving Driver R X MI 3 The qualitative risk analysis matrix has been taken from AS/NZS 4360:1999 Management Standard. This matrix is used to arrive at the Level of score throughout the risk analysis and is presented here for reference. PART 5: SUPERVISORS SIGN-OFF I understand and will comply with the requirements of this JSEA/SWMS. I will monitor the implementation of this JSEA/SWMS, and take action in the event of any noncompliance. I will consult with the work crew and amend this JSEA/SWMS as necessary in the event of any changes to the work method, equipment, sequence, materials or the like and in the event of any safety or environmental breaches, incidents or near misses. Supervisor 1: Name: Rob East Signature: Date: 02.07.2018 Supervisor 2 As applicable Name: Signature: Date: 010 Electrical Hammer Drill Version 11 Created July 2018 Review Date: July 2019 Page 6 of 9

PART 6: JSEA/SWMS RECORD OF CONSULTATION AND INDUCTION INTO WORK METHODS I, the worker have been consulted, acknowledge and understand the requirements of this JSEA/SWMS. NOTE: DO NOT SIGN THIS RECORD IF YOU DO NOT UNDERSTAND THE SAFE WORK METHODS PRESCRIBED ASK THE SUPERVISOR TO EXPLAIN Ref # Last Name First Name Job Description (Trade Classification) 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 Employed By JSEA/ SWMS Rev# Signature Date of Induction Induction Verified by: 010 Electrical Hammer Drill Version 11 Created July 2018 Review Date: July 2019 Page 7 of 9

INSTRUCTIONS - RISK ASSESSMENT BY HAZARD SWMS PREPARATION Select appropriate person(s) to develop the SWMS. Person preparing SWMS is to complete all pages. Column A Identify Activity Steps (consult all parties involved). Column B Identify hazards associated with each Activity Step. Column C Use Assessment Table to determine consequences and likelihood of occurrence. Insert the Alpha abbreviation into SWMS under Column C Sub-columns L & C. Column D - Use Matrix to determine Class of. Insert the numeric rating under R. Column E - Determine appropriate control measures to eliminate the risk or reduce it to as low as practicable. Column F - Allocate responsibility for implementing required control under Who By. Column G - Reassess the risk of each control and insert the Alpha and Numeric rating chart following the controls Column H - Use Matrix to determine Class of. Insert the numeric rating under R. Assess items in the Part B Evaluation/Review Checklist to ensure relevant to the SWMS and amend if necessary. Train all persons involved in activities covered by SWMS using specific training meeting or toolbox talk and have them sign the last page of SWMS to confirm training complete. Submit SWMS to relevant Site Management Team member. Relevant Site Management Team members evaluate SWMS using Part B - Evaluation/Review Checklist. Nominated person completes SWMS Evaluation/Review Checklist and amended SWMS when necessary and forwards a copy to Project Safety Supervisor. Communicate all SWMS amendments via toolbox talks to all persons involved in SWMS activities. Monitoring as per WH&S Reg 168. NB. Use the following tables to determine the risk class for each activity step. RISK CLASS OR RATING (R) High 1 Medium 2 Low 3 RISK ASSESSMENT TABLE Likelihood (L) (C) Almost Certain Expected To Occur In Most Catastrophic Permanent Disability/Death (AC) Circumstances (CA) Likely Major Extensive Injuries/ Serious LTI (L) Probably Occur In Most Circumstances (MA) Possible Significant Disabling/Short-Term LTI (P) Probably Occur At Some Time (S) Unlikely Moderate Medical Treatment (U) Could Occur At Some Time (MO) Rare May Occur In Exceptional Minor First Aid Treatment (R) Circumstances (MI) Multiply by Likelihood to determine Rating. RISK MATRIX (C) Catastrophic Major Significant Moderate Minor Likelihood (L) (CA) (MA) (S) (MO) (MI) Almost certain (AC) 1 1 1 2 2 Likely (L) 1 1 2 2 2 Possible (P) 1 2 2 2 3 Unlikely (U) 2 2 2 3 3 Rare (R) 2 3 3 3 3 Hierarchy of Control Elimination. Modify the process method or material to eliminate the hazard completely Substitution. Redesign/Engineering Isolate Administration PPE. Replace the material, substance or process with a less hazardous one Controls Redesign or modify the plant or process to reduce or eliminate the risk Separate the hazard from the person by safeguarding or by space or time. Adjust the exposure time or conditions or process by training, procedure, signs etc Use appropriately designed and properly fitted equipment where other controls are not practicable or are accepted 010 Electrical Hammer Drill Version 11 Created July 2018 Review Date: July 2019 Page 8 of 9

PART 7: JSEA/SWMS REVIEW REPORT JSEA/SWMS CHECKLIST ITEM CHECKLIST CRITERIA COMPLIES Yes or No 01 Does the JSEA/SWMS set out step-by-step all of the activities? Y/N 02 Does the JSEA/SWMS describe how each activity will be carried out? Y/N 03 Does the JSEA/SWMS consider the environment within which the activities are to be undertaken including interfaces with other trades? Y/N 04 Does the JSEA/SWMS identify safety, health and environmental hazards that will/may arise at each stage of the work? Y/N 05 Does the JSEA/SWMS clearly document control measures to be put in place for each hazard that is identified? Y/N 06 Does the JSEA/SWMS describe all plant and equipment that will be used? Y/N 07 Does the JSEA/SWMS identify relevant Standards and Codes of Practice that must be complied with? Y/N 08 Does the JSEA/SWMS identify any pre-start and in process certifications/authorisations/permits? Y/N 09 Does the JSEA/SWMS specify licensing and qualifications required for personnel (including specific qualifications for specific roles/tasks)? Y/N 10 Does the JSEA/SWMS specify training and/or trialling required to enable the work to be done safely? Y/N Employee Undertaking work: Signature: Date: Reviewed By: Rob East Signature: Date: 2 nd July 2018 Signed by the Management Representative of Fast Cut Qld Pty Ltd PRINCIPAL CONTRACTORS COMMENTS: JSEA/SWMS has been reviewed with no comments JSEA/SWMS has been reviewed with issues raised with Fast Cut Qld: Summary of details of issues/comments/rectifications required: Reviewed by Principal Contractor: Signature: Date: 010 Electrical Hammer Drill Version 11 Created July 2018 Review Date: July 2019 Page 9 of 9