EXCITING WORLD OF STEEL STRUCTURES

Similar documents
SPECIAL LAUNCHING METHODS

KCRC Ma On Shan Line. Railway Development in Hong Kong. Tai Wai Station and Maintenance Centre

Viaduct and bridge construction methods adopted at MTR SIL(E) Contract 903. MTR SIL(E) 903 Viaduct Construction Team

CAISSON SHAFT SYSTEM

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Perched Box Caisson Overview. January 2014

Stability of Pipeline and details of Anchor blocks

The most versatile Fall Protection EVER

A Slipway Structure for River Ship Repair

GANTRY CRANES CAPACITIES: SPANS: TRACKS: OPTIONS: Up to 5 tons Up to 30' Steel Fixed or Adjustable

Single slide rail system Linear shoring

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships

Reverse Circulation Drilling Rig

Bridge Failures in Alberta

Components of a Barrage

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

Port Sections Guide Section 01

DESIGN OF AXIALLY LOADED STEPPED FOOTING DATA :- SBC of soil =200 KN /m 2 Concrete Mix =M20 Steel Grade = Fe 415 Clear cover of bottom slab =50 mm

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

Ph:

TECHNICAL MEMORANDUM 002 EMORANNO. 001

Lecture 10 : Sewer Appurtenances

PILING RIGS DRILLING RIGS

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Anchor Posts. *Patent Nos: Europe USA 12/372,965 2 ANCHOR SYSTEMS ANCHOR POSTS

FALL PROTECTION LADDERS ACCESSWAYS

Western Canadian Spill Services Ltd. Field Testing Exercise Report

Fall Protection Resource Guide P AGE 1

FP McCann Tunnels and Shafts 1

Applications of trigonometry

(a) Calculate the speed of the sphere as it passes through the lowest point of its path.

FALL ARREST TETHER TRACK RIGID RAIL ANCHOR SYSTEMS DESIGN:

Application Showcase LIFE MATTERS TM

Irrigation &Hydraulics Department lb / ft to kg/lit.

RESOLUTION A.1045(27) RECOMMENDATION ON PILOT TRANSFER ARRANGEMENTS

(12) United States Patent

TOWN of CHEEKTOWAGA Permit Application for Swimming Pools, Hot Tubs, or Personal Spas

Risk Control at United Fire Group

The Challenge of Wave Scouring Design for the Confederation Bridge

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

Edit this text for your title

List of Figures. List of Tables

CE 535, Spring 2002 Preliminary Design Example 1 / 6

An Ocean of Possibility

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION

International Journal of Advanced Engineering Technology E-ISSN

TRACK RECORD SEP. 2018

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN

Fehmarnbelt Fixed Link. Geotechnical Large Scale Testing

TCML operate and control the 146 Km Railway line from Lake Magadi to Konza.

Right Sizing VE Studies CSVA Conference. Markham, ON October 27, BRIAN RUCK, P. Eng., C.V.S. AECOM Canada

Baseball Stadium Renovations at US Cellular Field

User Instructions. Installing Fall Protection Void Formers. Please read carefully before fixing anchorage components into formwork

CLIENT NAME: LOCATION: CALM BUOY INSPECTION:

SINGLE DOWNTUBE RIGID FRAMES /1-1/2 MEGA-TUBE

Trench Cable Rollers - Straight Pulling Application

valves and actuators SUBSEA ACTUATION

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

SPECIALISED SERVICES. Kris Vlaeminck, Jan De Nul Group, Luxembourg, explains the use of dredging vessels on the Macedon Project in Australia.

Anchorages. Beam Anchors 136 Horizontal Safety Lines 137 Anchorage Lines 138 Rope Grabs 139 Hard Point Anchors 140 Attachment Slings 141

BoatWasher Swede, , MS Float

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN

PUNE TECHTROL PVT LTD. Instruction and Maintenance Manual for Float and Tape Gauge FTG

Fall Protection- Part 1

FLY ASH GENERATION AND UTILIZATION DURING

APPENDIX C DIVING. Section I. General

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Fall Protection Checklist. Guardrail System

Fall Protection Guidelines. Individual Unit Function: Safety Procedure No.: SOP-0111 Page: 1 of 13. Preparer: Owner: Approver: Safety Safety Safety

Ennore Coal Port Project: Port Basin and Entrance Channel

Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Geo-Vibro Corer

Learn more at

Journal of Civil & Environmental

REVOLUTIONIZING HULL CLEANING... The robot for fast in-water hull cleaning

THE USE OF SPIN FIN PILES IN MASSACHUSETTS

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M

REGULATIONS & COMPLIANCE. Riggers Safety LLC. 267 Winfield Cr. Corona, CA

1. In most economical rectangular section of a channel, depth is kept equal to

C Crane. Installation & Operation Manual. SWL 120kg. The Hansa CRANE ID#: Davit ISO/DIS June 2000 Sling AS Sept 2000

GATE INSTALLATION INSTRUCTIONS

IMO INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION LADDERS. Proposal for an amendment to SOLAS and associated guidelines

ALL TERRAIN CRANE AR-1200M-1

1. Air is blown through a pipe AB at a rate of 15 litre per minute. The cross-sectional area of broad

TRAVSMART permanent single-cable horizontal lifeline system

Title- Fall Protection Effective Date: 03 Jan 14 Revision-0

force tension suspension bridge anchorage cables compression caissons Towers deck

Break in the Bahamas. Cutters Head to the Caribbean to Wire Saw Sunken Pier. A 25-foot by 25-foot steel pier section had sunk into the water.

CHAPTER 5 CULVERT DESIGN

Overall Height with Banners m. Rigging 30 to m to 9.94 m. Covered Wings Rigging Height 40' m

Rates and Charges Operative from 1st January 2019

Application of Forces Acting on Jetty Structure

Inflatable Pontoons Listing ID:

PORT TALBOT BULK TERMINAL MOORING OPERATIONS MANUAL


Innovation and Safety Efficient Solution

Transcription:

ENABLING STRUCTURES INNOVATIVE SOLUTIONS FOR COMPLEX CONSTRUCTION PROBLEMS BY ER. A.B. KARNIK CONSULTING ENGINEER EXCITING WORLD OF STEEL STRUCTURES 1

PART 1- INTRODUCTION PART 2 - CASE STUDIES FOR ENABLING STRUCTURES PART 3 - SPECIAL STRUCTURES DO NOT FORGET NEWTON!!!! PART 1 WHAT IS ENABLING STRUCTURE? HOW TO ARRIVE AT DESIGN LOADS? INFORMATION FROM CLIENT THRO SEARCHING QUESTIONS. SEGREGATION OF INFORMATION. IF INFORMATION NOT AVAILABLE HOW TO APPROXIMATE? 2

DETERMINATION OF FACTOR OF SAFETY. SERVICEABILITY REQUIREMENT MORE PREDOMINANT. F.S. JUST SUFFICIENT TO CATER FOR STRENGTH. D.L AND L.L NEED NOT BE AS PER IS CODES. STRUCTURAL SCHEME SAFETY. ECONOMY WRT MATERIAL CONSUMPTION. EASE OF EXECUTION OF GIVEN SCHEME. ECONOMY WRT TIME FOR ERECTION AND ACTUAL OPERATION. 3

TYPES OF STRUCTURES MARINE AND RIVER CONSTRUCTION SUB STRUCTURE SUPER STRUCTURE UNDER GROUND UNDER WATER PORTS JETTIES BRIDGES CASE STUDY 1 50 MET LONG FLOATING WALKWAY BRIDGE 4

SALIENT POINTS 1. ACCESS TO WORK SITE. 2. DEPTH OF WATER MORE THAN 5.0 MET. 3. PRINCIPLES OF HYDRAULICS AND STABILITY. 5

6

CASE STUDY 2 JACKUP PLATFORM NO ACCESS AVILABLE. WHAT IS THE SOLUTION? MOORING DOLPHINS FOR WESTERN INDIA SHIPYARD, GOA 7

JACK-UP PLATFORM DESIGNED FOR 3 NUMBERS. 1200 MM DIA. PILE. PROVIDED WITH OVER HEAD FACILITY TO INSTALL PILING PULLIES IN THE REQUIRED LOCATION 8

JACK UP PLATFORM FOR SOIL EXPLORATION AT JOGESHWAR DEAHEJ FOR IPCL PILING FOR JETTIES PILING WORK-- ONSHORE OFFSHORE PILES -- PRECAST INSITU CHALLENGES IN OFF SHORE PILING. RANGE OF PILE DIAMETER. SPEED OF CONSTRUCTION. QUALITY OF CONSTRUCTION. 9

CASE STUDY 3 MARINE JETTY AT DAHEJ FOR BIRLA COPPER, GUJARAT 10

THE JETTY... 1152 M LONG IN APPROACH, 208 M LONG ON BERTHING FACE. JETTY CONSTRUCTION FROM LAND- END ON METHOD PILING 6 PILES IN 5 DAYS FRONT CANTILEVER 24 M SUPPORTED SPAN 24 M 30 M REAR CANTILEVER 11

WATER CURRENTS OF 3 TO 4 M/ SEC 12

15 T CAPACITY UNDER SLUNG CRANE FOR MATERIAL HANDLING 13

14

ROLLING BRACING IN PLAN MARINE JETTY AT DAHEJ FOR GUJARAT CHEMICAL PORT, GUJARAT 15

THE JETTY... THE JETTY IS MORE THAN 1000 M LONG PILING... PILING GANTRY CONSTUCTED PILES UPTO ABOUT 1000M IN LENGTH IN 10 MONTHS WITH FOUR PILES FROM FRONT CANTILEVER OF 24M & TWO PILES FROM SIDE CANTILEVER OF 8M. THIS GANTRY ALSO HAD 30M REAR CANTILEVER FOR 20T CAPACITY UNDER SLUNG CRANE. 16

PILING... TAILOR MADE ERECTION GANTRY WAS ALSO DESIGNED FOR HANDLING OF PRECAST CONCRETE UNITS. REST OF THE GANTRY WAS DONE UP WITH STEEL PILES HAVING VERTICAL & RAKER PILES IN COMBINATION. 17

NOTE- THE BRACKET ON SIDE FOR ROLLING THE GANTRY 18

PRECAST CONCRETE ERECTION GANTRY MARINE JETTY FOR THERMAL POWERSTATION AT TUTICORIN,TAMILNADU 19

THE JETTY... THE JETTY WAS ABOUT 1000 M LONG WITH TWIN PILE BENTS SPACED AT 20 M C/C. THE GANTRY... THE GANTRY HAD 20 M LEFT CANTILEVER, 10 M SUPPORTED SPAN AND 30 M RIGHT CANTILEVER. 50 M LONG FLOATING BRIDGE WAS ALSO DESIGNED FOR BREAK WATER TO JETTY SITE APPROACH. 20

21

BRACING THE PILES 22

PILING GANTRY FOR JETTY AT AGATTI LAKSHADWEEP JETTY HEAD AT AN ANGLE OF 104 DEGREES 23

24

ASH DISPOSAL PIPE LINE BRIDGE FOR THERMAL POWERSTATION AT DAHANU, MAHARASHTRA JACK-UP PLATFORM DESIGNED FOR 3 NOs.600 MM DIA. PILE. MOVING RIG ON PLARFORM & SUSPENDED PILING PULLEY ADJUSTABLE IN REQUIRED LOCATION PILE GROUPS SPACED AT 30M C/C TO SUPPORT STEEL GIRDERS 25

JACK UP PLATFORM FOR ASH DISPOSAL PIPE LINE BRIDGE PILING FOR THERMAL POWER STATION, DAHANU 26

CASE STUDY 4 SUPER STRUCTURE BRIDGE ON MAHANANDA RIVER AT DALKHOLA WEST BENGAL 27

THE BRIDGE... P.S.C. BOX GIRDER BRIDGE 12 SPANS OF 52.80 M, SUPPORTED ON WELLS-PIERS. 1200 T BOX GIRDER TRAVELLING STAGING TEMPORARY 3 PILE GROUPS ON EACH SIDE TO BREAK THE SPAN TO 13.2M FOR SUSPENSION OF SHUTTERING ABOVE DECK SLAB TIME CYCLE OF 100 DAYS REDUCED TO 60 DAYS 28

29

30

NOTE THE SUSPENDERS FOR CAPACITY 60 T 31

BRIDGE ON SOMESHWAR CREEK AT RATNAGIRI MAHARASHTRA 32

THE BRIDGE IS 58 M LONG HAVING ONE SPAN OF 40 M BETWEEN ABUTMENT & CENTRAL WELL PIER. REST OF THE LENGTH CANTILEVERED. CENTERING BOX GIRDER TO SUPPORT P.S.C. BOX GIRDER WEIGHING ABOUT 500 T. CENTERING BOX OF 39 M LENGTH WAS LAUNCHED FROM ABUTMENT OVER TEMPORARY PAIR OF COLUMNS AT 13 M C/C SPACING. CENTER BOX WAS LOWERED TO REQUIRED LEVEL 33

1/3RD LENGTH OF CANTILEVER 34

PART 3 SPECIAL STRUCTURES LIMESTONE STOCK PILE SHED FOR CLINKER PLANT AT JAFARABAD FOR NARMADA CEMENT COMPANY LTD. 35

COVERING THE LIME STOCK WAS NECESSARY WHILE THE PLANT WAS IN OPERATION THE SHED WAS TO BE ERECTED IN PARTS OF 53 M WIDTH X 20 M LENGTH, 30 M AWAY AND ROLLING IN POSITION. TOTAL LENGTH 200 M TWO PORTALS 10M APART & TRIANGULAR PURLINS IN ROOF ALONG WITH SIDE CLADING CANTILEVERING 5M, CONNECTED IN TANDEN & ROLLED ON RAILS WITH TROLLEYS ATTACHED TO THEIR SHOE. 36

37

38

39

SPECIAL DETAIL FOR HINGE BRIDGE ON RAILWAY LINE NEAR ITARASI MADHYA PRADESH. 40

THE BRIDGE HAS 45 DEGREES SKEW SPAN OF 40M 6 PSC GIRDERS WEIGHING 140T EACH CONSTRUCTED ON ELEVATED STAGING WINCHED & SIDE SHIFTED TO REQUIRED POSITION IN-SITU DECK SLAB WITH SUSPENDED SHUTTERING WEB SHUTTER OF 6M HANDLED WITH OVERHEAD MONORAI HINGED AT BOTTOM EDGE OF STAGING FACILITATED THE ROTATION FROM VERTICAL TO HORIZONTAL POSITION. IT ACTED AS A WORKING PLATFORM ALSO. 41

42

TWO FOLD USE OF SHUTTERING ON HINGE ACTS AS WORKING PLATFORM FOR REINF ASSEMBLEY MOORING DOLPHIN FOR OIL JETTY AT MANGALORE 43

MAXIMUM HORIZONTALPULL 230T. FREE WATER DEPTH 18M ALLOWABLE DEFLECTION 6MM ALTERNATIVE I - VERTICAL PILES WOULD HAVE RESULTED IN LARGE DEFLECTIONS; 1200 MM DIA. PILES IN LARGE No. COSTLY ALTERNATIVE II RAKER PILES CONNECTED ALONG OUTER EDGE OF 8X8M PILE CAP UNACCEPTABLE DEFLECTIONS & SEVERE BM & AXIAL FORCE ALTERNATIVE III 4 INDIVIDUAL PILE GROUPS OF 3-800 DIA AT 1:4 RAKE. PILE CENTER LINE MEETING IN PILE CAP & TRIPOD FORMATION AT EACH CORNER. THIS RESULTED IN REDUCED DEFLECTION & BM. 44

ALTENATIVE I ALTENATIVE III MORE EFFICIENT ALTENATIVE II 45

CENTERING FOR 125T FENDER BLOCK FOR CONTAINER BERTH AT ADANI PORT 46

HORIZONTAL BEAM SPANING 13M COSTLY INVERTED TRIANGLE IN STEEL USED TO TRANSFER THE FORCE. UTILISING FULL CAPACITY IN TENSION. CRADDLE FOR 125 T FENDER BLOCK 47

CRANE FOR ERECTION OF LARGE SPAN SHED OVER WATER ERECTION CRANE DESIGNED TO ERECT THE LARGE SPAN SHED IN A RECORD TIME SHED 41M WIDE, 130M LONG & 30M HIGH 48

CRANE DESIGNED TO ERECT SHED OVER WATER CRANE OUT/OUT 48 M x 34 M HIGH x 24 M BASE WIDTH 49

50

FLOATING PONTOON FOR BAND- DRAIN WORK FOR SOIL CONSOLIDATION AT DEEP WATER PORT AT KAKINADA PONTOON WHY BAND- DRAINS ARE REQUIRED? TAILOR-MADE UNIQUE PONTOON WAS DESIGNED ACHIEVED A WORLD RECORD OF 2200 BAND- DRAINS IN A DAY FOR VERY SOFT CLAY CONSOLIDATION FOR BREAK WATER 51

TYPICAL SECTION KEY PLAN SHOWING CONCRETE TRACK 52

53

REMOVABLE STEEL COFFERDAM FOR INTAKE CHANNEL 7M WIDE X 12M HIGH 54

55

SPEEDY CONSTRUCTION OF 12M HIGH RCC WALL WITH BUTTRESSES 56

57

58

17 M HIGH RCC WALL ON HILL SLOPE FOR BUNGALOW 59

60

61

T H A N K Y O U 62