TRANSPORTATION IMPROVEMENT STRATEGY

Similar documents
North Shore Transportation Improvement Strategy

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

M14A/D Select Bus Service

43 rd Avenue, Skillman Avenue Protected Bike Lanes

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

5. RUNNINGWAY GUIDELINES

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Presentation to Media. February 27, 2008

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

C C C

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Bus Rapid Transit Plans

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Welcome and Introductions Overview of the Study to Date Community Involvement Intersection Improvement Concepts Bike-Ped Recommendations ITS

Sacramento Grid 2.0. The Downtown Transportation Study

STATION #3 INITIAL ALTERNATIVES

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

Canarsie Tunnel Repairs: Planning Ahead for the Crisis

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Frequently Asked Questions (FAQ)

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles.

Existing Transportation System

Markham Sports, Entertainment and Cultural Centre Transportation Overview

Tonight is for you. Learn everything you can. Share all your ideas.

Office of City Council Member Benjamin J. Kallos Livable Streets Dangerous Intersections

D New York City Transit

Memorandum. Sunday, July 13, Saturday, July 19, 2014

NYC Pedestrian Safety Study & Action Plan. NYTMC Brown Bag Lunch Presentation December 15, 2010

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Lincoln Neighborhood Corridor Plan The LiNC

North Avenue Corridor Study

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

TRANSPORTATION IMPACT ANALYSIS GUIDELINES WALKING/ACCESSIBILITY MEMO APPENDICES

San Pablo High Treatment applied incrementally at each N + ++

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Geary Bus Rapid Transit Project

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Appendix C 3. Bicycle / Pedestrian Planning

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

The North Shore Transportation Improvement Strategy and Western Richmond Terrace 1 : The Forgotten Corridor

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Preliminary Transportation Analysis

Montford Drive Parking & Circulation Study

II. Identification of Opportunities and Solutions. A. Short-term action plan (Summary of Recommendations)

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

WELCOME Mission-Geneva Transportation Study

A. INTRODUCTION B. METHODOLOGY

City of Hyattsville. Citywide Traffic Study and Transportation Plan. Sabra, Wang & Associates. February, 2010

Arterial Transitway Corridors Study. Ave

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Maywood Town Hall Meeting. May 4, 2016

LOOP 360 IMPROVEMENT STUDY

Strategy for Walking & Cycling Action Plan

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

See Figure 38, Existing Nonmotorized Connections.

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

North Coast Corridor:

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

Washington State University Bicycle and Pedestrian Plan Working Paper #7: Implementation Strategies

Welcome! Public Open House on UBC s Transportation Plan

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Geary Corridor Bus Rapid Transit

Existing Transportation System

Central Freeway and Octavia Circulation Study

Exit 13/Golden Triangle Study FREQUENTLY ASKED QUESTIONS

Community Task Force July 25, 2017

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

Chapter 5 Future Transportation

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

City of White Rock. Strategic Transportation Plan. May 16, 2005

42nd Ave N Reconstruction

North Station Area Mobility Action Plan

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

Alaskan Way, Promenade, and Overlook Walk Final EIS

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

Clackamas County Comprehensive Plan

Transportation Corridor Studies: Summary of Recommendations

North Avenue Corridor Study

to the Public Information Centre for the Downtown Traffic Study

Strategies to keep people and goods moving in and through Seattle

Project Fact Sheet. August 1,

About the Studio. Edward J. Bloustein School of Planning and Public Policy - Rutgers University

DOWNTOWN MIAMI PEDESTRIAN PRIORITY ZONE

About the Wilmington Downtown Circulation Study

Holland Tunnel Exit in NJ

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

MULTIMODAL NEEDS ASSESSMENT

Transcription:

TRANSPORTATION IMPROVEMENT STRATEGY A Vision for Staten Island North Shore November 2016 1

EXISTING CONDITIONS Transit Conditions MTA Bus Staten Island Railroad Peak Directional Traffic Volume (per hour)**: Bay Street Richmond Terrace Victory Boulevard Castleton Ave Front Street Van Duzer/St. Pauls Tompkins Ave 22 bus routes originate at the St. George Ferry Terminal More than 11,500 bus riders board these routes at the Ferry Terminal on an average weekday 7,343 average weekday trips at St. George and Tompkinsville SIR Stations (2015) Staten Island Ferry 70,000 Daily Passengers (2016) 13,598 Manhattan-bound commuters daily between 7am-10am* 1000 vph 600-800 vph 700-800 vph 800 vph 600 vph (two-way volumes) 600-700 vph 300-400 vph * NYMTC Hub Bound Travel 2014 ** NYC EDC 2016 2

CURRENT PEAK VOLUME & SPEED Congested intersections throughout study area Consistent volumes to/from the ferry during commuting peak periods Traffic Volume at Ferry Terminal Traffic Volume at Ferry Terminal Towards Terminal Richmond Terrace 553 Towards Terminal Richmond Terrace 490 Away from Terminal Bay Street 711 Richmond Terrace Existing AM Peak Volumes & Speeds towards Ferry 510 Bay Street 676 Away from Terminal Bay Street 651 Richmond Terrace Existing PM Peak Volumes & Speeds from Ferry 538 Bay Street 575 Note: Volumes based on 2016 data (Source: EDC) 3

HERE S WHAT S COMING St George Waterfront Redevelopment Outlet Mall (2017) 1.06M sf. mixed-use, 1,250-space garage NY Wheel (2018) 420K sf. mixed-use, 950-space garage New Stapleton Waterfront Development Plan (2017) 45K sf. retail, 950 apartments, 743 parking spaces Lighthouse Point (2019) 74K sf. mixed-use, 109 apartments, 800-seat cinema, 164 hotel rooms, 345 parking spaces Proposed Bay Street Corridor Rezoning (2017-2030) Potential 353K sf. mixed-use, 2,556 apartments, 1,295 parking spaces 4

FERRIES WILL CARRY MOST OF THE NEW TRAVELERS Ferry carries the largest mode share of new trips to major attractions Vehicle trips include auto, taxi, truck, and tour bus Daily Weekday Trips Walk, 146 (0.3%) Vehicles Trips, 11337 (23.2%) Train Trips, 695 (1.4%) Ferry, 35429 (72.4%) City Bus, 1344 (2.7%) Total Trips: 48,951(similar mode share trends on weekends with projected 58,916 trips) Source: St George Waterfront Redevelopment EIS 2013 5

AS PART OF THE 2013 EIS, THE CITY HAS ALREADY COMMITTED TO: Staffing NYPD Traffic Enforcement Agents to manage mall opening & SI Yankee Games Roadway & Traffic Improvements Increased capacity of Wall St Ramp Signal timing changes & marking improvements at key intersections Wall & Schuyler Street Reversals Traffic signal at Richmond Terrace/Schuyler Street Northbound Left- and U-turn restrictions at Richmond Terrace at Wall Street Semi-trucks delivery restrictions to off-peak hours where appropriate Ongoing monitoring and adjustments as needed 6

THE CITY HAS ALREADY COMMITTED TO: SI Ferry Study the possibility of providing ferry service from Staten Island to midtown Manhattan (Winter 2017) Study improving passenger throughput at St. George & Whitehall Ferry Terminals Construction of three new 4500- passenger capacity ferries (2019-2020) 7

RECENT KEY DOT AND EDC PROJECTS 2016 Bay Street and Victory Boulevard (completed) Forest Avenue, South Avenue to Willowbrook Road (implementation underway) Richmond Terrace and Port Richmond Avenue (implementation to start in Nov) Front Street and Connector Street Reconstruction (EDC, completed) 2015 Richmond Terrace, South Avenue to Port Richmond Avenue Clove Road, Richmond Terrace to Forest Avenue 2014 Richmond Terrace, Western Avenue to Morningstar Road 2013 Hyatt Street, St. Mark s Place to Stuyvesant Place Bay St & Victory Blvd 2016 SIP 8

ADDITIONAL STEPS THE CITY IS TAKING The City identified key projects to reduce congestion and improve mobility and safety through: Traffic Enforcement and Roadway Changes Travel Demand Management Freight Management Pedestrian/Bicycle Safety Enhancements All of this will be coordinated by a new DOT North Shore Planner 9

POTENTIAL TRAFFIC ENFORCEMENT AND ROADWAY CHANGE RECOMMENDATIONS Project Enforce Placard Rules & Removal of Illegally Parked Vehicles North Shore TEA Deployment Strategy Richmond Terrace Capacity Enhancement Circulation & Access Improvement: Street Dir. Install 3 Traffic Signals, if warranted Signal Timing Optimization & Progression Responsible Agency Timing* Relative Impact Implementation Difficulty NYPD TBD High High NYPD TBD High High Cost Estimate Agency Resources $300K Areawide Funding Identified if feasible N Partial DOT, NYPD TBD High Low $2.5K/int. Partial DOT 2017 High Low $50K Y DOT TBD High Low $600K Y DOT 2017 Medium Low $25K Y Turn Restrictions DOT 2017-2018 Medium Medium $7.5K Y *All TBD pending community input and further analysis 10

TRAFFIC ENFORCEMENT & ROADWAY CHANGES Installation and enforcement of rush hour regulations will improve traffic flow on Richmond Terrace between St. Peter s Place and the ferry terminal Example: Richmond Terrace capacity enhancements at Stuyvesant Place 11

TRAFFIC ENFORCEMENT & ROADWAY CHANGES TEAs Deployment Strategy 3 committed at peak traffic times in the St. George Waterfront Redevelopment EIS to organize traffic flow In addition, potential for the 120th Precinct and SI Borough Command to deploy additional agents 12

TRAFFIC ENFORCEMENT & ROADWAY CHANGES Circulation and Access Extend one-way reversal on Wall Street Eliminating head-on geometry at Wall Street/Stuyvesant Place will improve safety, reduce congestion, and help circulation (EIS mitigation) 13

POTENTIAL TRAVEL DEMAND MANAGEMENT RECOMMENDATIONS Project Increase bus service during peak hours: S46/S94) Responsible Agency Timing* Relative Impact Implementation Difficulty Cost Estimate Funding Identified if feasible MTA, DOT TBD High High $300K-$500K N Transit Signal Priority DOT, MTA TBD High Medium $17K/int. Y Variable Priced Parking outside development DOT, EDC, Business TBD Medium High Agency Resources Y Activate Bi-Direction Victory Blvd Bus Lanes during Peak Periods Go Smart- North Shore Implementation Install real time information signs at bus stops DOT, MTA TBD Medium Medium $2M N DOT 2017 Medium Low $350K-$500K Y DOT, MTA TBD Medium Low $25K/location Partial North Shore BRT (Study) MTA 2017-2019 Medium Low $5M Y *All TBD pending community input and further analysis 14

TRAVEL DEMAND MANAGEMENT Education and Outreach: Go Smart NYC PROJECT FUNDING: Federal Grant PROJECT BACKGROUND/SCOPE: Based on 10+ Years of national and international best practices in Personalized Travel Choice programming. NYC s first Go Smart program was launched in Queens CB5 in 2015. PROJECT STRUCTURE: Opt-in Education and Encouragement program that targets neighborhoods, employers, and institutions to improve travel outcomes for drivers, cyclists, transit users, and pedestrians. 15

POTENTIAL FREIGHT MANAGEMENT RECOMMENDATIONS Project Evaluate Commercial Loading/Unloading areas along major corridors Responsible Agency Timing* Relative Impact Implementation Difficulty Cost Estimate Funding Identified if feasible DOT 2017 Medium Low DOT Resources Y Compliance monitoring of truck routes DOT, NYPD 2017 Medium Low DOT Resources Y Business Engagement for Consolidated Management of Goods & Waste Encourage off-hour deliveries to minimize deliveries during peak periods *All TBD pending community input and further analysis DOT 2017 Low Medium DOT Resources Y DOT, Businesses N/A Low Medium DOT Resources Y 16

POTENTIAL PEDESTRIAN/BIKE SAFETY RECOMMENDATIONS Project Upgrade all Ped Ramps (ADA Compliant) Responsible Agency Timing* Relative Impact Implementation Difficulty Cost Estimate Funding Identified if feasible DOT TBD High Medium $6K/ramp Y Install High-Visibility Crosswalks DOT 2017-Beyond High Low $2.5K/intersection Y Install pedestrian countdown timers where feasible DOT TBD High Low $2K/timer Y SIR Station Enhancements EDC/MTA/DOT TBD Medium Medium $2.5M N Improve Bicycle Facilities DOT TBD Medium Medium $2.5K/rack + $800K/10 miles of paint Y Wayfinding Signage DOT/EDC TBD Low Low $1.05M Y *All TBD pending community input and further analysis 17

POTENTIAL PEDESTRIAN/BIKE SAFETY RECOMMENDATIONS Project Responsible Agency Timing* Relative Impact Implementation Difficulty Cost Estimate Funding Identified if feasible Hannah St Bridge Bicycle Improvements DOT TBD High High $10-20M N Tompkinsville Esplanade EDC TBD High High $68M N Richmond Terrace near St. George Terminal DOT TBD High Medium $11.3M N Bay Street and Victory Boulevard DOT TBD High Medium $7.3M N Saint Paul s Avenue and Van Duzer Street DOT TBD High Medium $2.9M N *All TBD pending community input and further analysis 18

PEDESTRIAN/BICYCLE SAFETY ENHANCEMENTS Improve wayfinding signage at St. George Terminal and through study area Install high visibility crosswalks & pedestrian signals to increase pedestrian safety Bay Street at St. Julian Place 19

PEDESTRIAN/BICYCLE SAFETY ENHANCEMENTS Safe Routes to Transit Complete SIR Station area improvements at Tompkinsville & Stapleton Stations Increase number of bus shelters where feasible to enhance pedestrian and transit environment Potential Stapleton SIR Station entrance improvements (Source: EDC) 20

MOVING FORWARD The City plans to: Advance conversations with MTA leadership & key stakeholders Present recommendations to the community in order to determine priorities and assess potential trade-offs Implement select projects in anticipation of mall opening Finalize & secure funding for longer-term projects Continue to monitor and evaluate projects 21

THANK YOU! Questions? NYC DOT NYC DOT nyc_dot NYC DOT 22