Risk Assessment for Rock Climbing

Similar documents
Risk Assessment for Low Ropes

Curriculum Activity Risk Planner for Mid Ropes & Flying Fox

Curriculum Activity Risk Planner for Rock Climbing & Abseiling

Risk Assessment for Team Builders

Risk Assessment for Night Olympics

Risk Assessment for Radio Rogaine

Curriculum Activity Risk Planner for Movie Night and Popcorn

Risk Assessment for Stand Up Paddle Boarding

Curriculum Activity Risk Planner for Canoeing

Archery. Reviews Complete By Revision Date Approved By Approval Date Kai Timm 16/6/2016 Libby Mensa 4/4/2017 Robbie Shanks 6/04/2017

Top-Rope Climbing - conducted by Tinaroo EEC Staff

Abseiling Risk Management Plan

High Ropes Management Plan

Snorkelling, Open Water

Rock Climbing Risk Management Plan Lutanda Yarramundi

Cycling: Track, Road and Bike Path

RISK MANAGEMENT PLAN ABSEILING

Abseiling Risk Management Plan Lutanda Yarramundi

Mountain Bike Risk Management Plan

Climbing & Abseiling Activity Plan

RISK ASSESSMENT RADIO ROGAINE

RISK ASSESSMENT. Catapults

Climbing - Outdoor Rock Climbing

RISK ASSESSMENT Outdoor Abseiling

Archery Risk Management Plan Lutanda Yarramundi

RSP1.1 Single pitch rock climbing and abseiling on outcrops and crags using. RSP2.1 The learning outcome will vary depending on Particiapnt needs and

Camp Barrabadeen Risk Assessment

RISK ASSESSMENT Indoor Abseiling

Swimming Pool Risk Assessment - Management Plan

RISK ASSESSMENT Outdoor Climbing Wall

Risk Assessment Form

POSITION OF PERSON COMPLETING REPORT: IN CONSULTATION WITH: David Radolovic POSITION: HSR/ Program Coordinator

RISK MANAGEMENT PLAN Outdoor Education

Activities Risk Management Guide 2018

Bushwalking. Curriculum activity risk assessment. Activity scope. Risk level

Risk Assessment Mobile Climbing Wall

Demonstrate lead climbing on bolted rock climbs

Risk Assessment Form

University of Lincoln Students Union Annual Risk Assessment for Activities

RISK ASSESSMENT Indoor Climbing Wall

Risk Assessment Form

SAREA TOP ROPE INSTRUCTOR PERSONAL CLIMBING ASSESSMENT

Climbing Area. Review Completed by: Jamie Brunt Approved By: Steve Allard Date: June 2012

DEFENCE INSTRUCTIONS AND NOTICES (Not to be communicated to anyone outside HM Service without authority)

Proficiency Statements Vertical Stage 1- Introductory Skills Plan

All Wedderburn Christian Campsite s Safe Operating Procedures and activity curricula have been developed with reference to these documents.

Safety Management Plan

Raft Building Activity Plan

Control Control Owner Residual Risk I L Score I L Score

Rock Climbing Review date December 2013

Risk Control Measures in Place Remaining Risk Falling from a height Participants 5 The instructor is trained and assessed by a competent person.

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

Mountaineering Code of Practice

GUIDE 2002 HEALTH AND SAFETY FOR ARTIFICIAL CLIMBING STRUCTURES AND OPERATIONS FOR DESIGNERS, MANUFACTURES, SUPPLIERS, OPERATORS AND USERS

Climbing - Zipline/Tyrolean Traverse/Equivalent

GENERIC AALA ACTIVITIES RISK ASSESSMENT

The method of Risk Assessment and Mitigation is based on the following Risk Rating Matrix and its general response guidelines.

GENERIC AALA ACTIVITIES RISK ASSESSMENT

Respond to non-routine situations and perform rescues when using high ropes courses

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

This document is intended to represent part of Map Adventures response to its responsibilities under the:

SAFE WORK METHOD STATEMENT (SWMS)

Risk Assessment for Redpoint Climbing Centre & RedBloc Bouldering Centre

Use of the Climbing wall at Pendle Vale College. Method statement and risk assessment

Live For Today LTD Activity Specific Guidelines. 2018

Risk Assessment & Safe Work Method Statement (SWMS)

Single Pitch Award (SPA) assessment

General Risk Assessment for Climbing, Bouldering and Abseiling

WORK METHOD STATEMENT TERMITE PROTECTION

Climb On Safely TRAINING OUTLINE

Scouts Australia NSW Branch

Procedures for Officers, Committee members, and Members of Oxford University Mountaineering Club

NZQA Expiring unit standard version 5 Page 1 of 5

Climbing Gym Instructor Program Level 1 and 2. Application Package (please specify course dates and location on your application form)

Abseiling and Climbing Activity Plan. (Mountain Quarry, aka Boya Quarry)

PS 2.1 The learning outcome will vary depending on the needs of the. PS3.1 Must have understanding of the process of group dynamics and reviewing

NWSC Climbing Instructor Level 1 Take Home Exam

Provide initial response at rope rescue incidents

WORK METHOD STATEMENT ELECTRICAL

CHRISTIAN YOUTH CAMPS BURLEIGH HEADS MOUNTAIN BIKING

Guidance in Completing the Risk Management Plan Proforma: Excursion. Chifley College Mount Druitt Campus 2018 Risk Assessment

SAFE WORK METHOD STATEMENT

Climb On Safely. Training Outline

MASON COUNTY FIRE DISTRICT #4

Event / Process / Activity / Task Risk Assessment Template

RISK Assessment & Management Plan

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

Single Pitch Award (SPA) training

UNIVERSITY of OXFORD SPORTS DEPARTMENT. OXFORD UNIVERSITY RISK ASSESSMENT MOUNTAINEERING DATE: - May Who might be harmed

COCONUTS OUTRIGGER CANOE CLUB RISK MANAGEMENT POLICY

Live For Today LTD Activity Specific Guidelines. 2016

Rock Climbing ORGT General/Administrative Checklist

Abseiling and Climbing Activity Plan. (Statham s Quarry Gooseberry Hill)

METHODOLOGY RISK TABLES TABLE 1 - QUALITATIVE MEASURES OF CONSEQUENCE OR IMPACT TABLE 2 - QUALITATIVE MEASURES OF LIKELIHOOD

Risk Assessment Ground Belay

DEFINITIONS ROPE ACCESS

Team Building /Leadership Challenge Risk Assessment - Management Plan

Blackwood Special Schools Outdoor Education Centre Inc. EXPEDITIONS. Duke of Edinburgh Expedition Locations. Duke of Edinburgh Expedition Descriptions

Session plan and risk assessment. Climbing

RAMS information for HangDog Indoor Climbing Centre

Transcription:

Risk Assessment for Rock Climbing Reviews Completed By Revision Date Approved By Approval Date R Shanks 24/07/2018 D Davidson 24/07/2018 171 Nojoor Road Twin waters QLD 4564 P: 1300 122677 Apexcamps.com.au Medium Risk level Some chance or an incident or injury requiring first aid Action required/approval Document controls in planning documents and/or complete this Curriculum Activity Risk Assessment. Consider obtaining parental/carer permission. Minimum Supervision At least 1 qualified Activity Instructor are to be present to run Rock Climbing as well as another Activity Instructor, Total 2 Recommendations Rock Climbing is recommended for grade 4 and 8 years old and above It is strongly recommended that at least 1 group teacher/supervisor are present to assist with student behaviours Qualifications All Apex staff and contractors hold at a minimum,one of the following qualifications /skills sets or other recognised skill sets/qualifications from another jurisdiction, along with mandatory First Aid/ CPR and QLD Blue Card, working with children check.. Staff trained for correct use of Gri Gri safety device lowering rock climbing. Certificate 3 Outdoor Recreation specialising in Rock Climbing & Abseiling Natural or Artificial Surfaces Certificate 4 Outdoor Recreation specialising in Rock Climbing & Abseiling Natural or Artificial Surfaces Diploma Outdoor recreation specialising is Rock Climbing & Abseiling Natural or Artificial Surfaces Perform Vertical Rescue also Haul system abseil only. Through the use of well maintained equipment, training and accredited staff and sound operating procedures and policies Apex Camps control the real risks associated with this activity

In assessing the level of risk, considerations such as the likelihood of an incident happening in combination with the seriousness of a consequence are used to gauge the overall risk level for an activity. The matrix below has been used as a guide to assist with developing the risk assessment: Likelihood Consequence 1 Insignificant 2 Minor 3 Moderate 4 Major 5 Critical 5 Almost Certain Medium Medium High Extreme Extreme 4 Likely Low Medium High High Extreme 3 Possible Low Medium High High High 2 Unlikely Low Low Medium Medium High 1 Rare Low Low Low Low Medium Risk Level Low Little chance of incident or serious injury. Medium Some chance of an incident and injury requiring first aid. High Likely chance of a serious incident and injury requiring medical treatment. Extreme High chance of a serious incident resulting in highly debilitating injury.

Minimum Equipment/Facilities First aid kit suitable for activity Communication system Electronic and other equipment that can be damaged by water is to be carried in water resistant containers. Leaders are responsible for determining the equipment to be carried by all participants. The following communication equipment should be appropriate for the activity and area of operations. Phone-line at location Mobile phone UHF Radio Sun Safety equipment (hat, sunglasses, sunscreen, shirt etc) Appropriate clothing and footwear (no singlets, skirts, short shorts, thongs, crocs etc) Gloves, backpacks to carry equipment, edge protectors to protect ropes from abrasion damage Leader will inspect the area and ensure its soundness before commencing the activity Equipment use and maintenance log to be kept and documented each session Drinking water (students should not share drinking containers) Spare equipment to be available in case of emergency Vehicular access to within a reasonable distance of the activity in case of emergency

Minimum Equipment/Facilities Harness and helmet for all participants in line with the following standards and practises. Harnesses and helmets specifically designed for rock climbing/abseiling, and compliant with he International Mountaineering and Climbing Federation (UIAA), European Committee for Standardisation standard or equivalent. Harnesses to be worn at all times during activity, and to be connected by a safety line (rope or tape) to an appropriate anchor point or belay where exposure to a fall exists Harnesses to be retired by manufacturer s nominated expiry date Helmets to be of the correct size and fit Helmets to be worn and secured throughout any activity session where students are exposed to typical climbing/abseiling hazards Helmets to remain on students until completion of the activity. Safety ropes, harnesses, slings and all other safety equipment (karabiners, slings and chocks), manufactured specifically for rock climbing/abseiling, used according to the manufacturer s specifications and accepted abseiling practises and conforming to the Australian Standards and UIAA specifications. An approved certified Rock-climbing structure or a rated anchor system eg eyebolt at a existing outdoor climbing area All practises and processes are adopted from the Queensland Adventure Activity Standards

Hazards and Control Measures Listed below are the indicative hazards/risks and the control measures. Hazards/Risks Biological material Bodily fluids (e.g. blood, sweat, saliva) Environmental conditions Weather Surfaces Surrounds Equipment Equipment failure Heights Falling from vertical surface Control Measures Comply with HLS-PR-004: Infection Control and Management of Prescribed Contagious Conditions and Infection Control Guidelines. Students with open cuts and abrasions are to be removed from the activity and treated immediately. If bleeding cannot be controlled completely, the participant should not be allowed to return the activity. All clothing, equipment and surfaces contaminated by blood should be treated as potentially infectious. Have sufficient and suitable containment material (bandages, etc) available Ensure that personal items are not shared. Assess weather conditions before and during activity (e.g. temperature, storms) Check and assess surrounds for loose items, debris and hazards and suitability of participants. The location should allow safe access to the staging areas Visibility and access to be considered before choosing routes Consider hazards associated with types of fencing material, gates and other infrastructure. Use, maintain and store equipment according to manufacturer s specifications Conduct regular equipment checks prior to start of sessions. Particular attention to fastening systems when removable rope systems are uses Check for worn or faulty equipment, and adhere to manufacturer s guidelines for life of equipment Ensure all safety equipment is in place and in good condition and discard immediately if not suitable Provide instruction in safe rappelling methods and use of equipment Supply all equipment in a clean and serviceable condition Ensure wet equipment is dried before storing Students must not engage in lead climbing Soft fall mulch to be contained at the bottom of the climbing wall Use a belay system appropriate to the activity, with supervision at all times The fitment of automatic safety device gri gri 2 to be fitted to each rope line Back up safety system to be used with a prussik connected to a backup belayer Participants to be instructed on belay technique and supervised by two instructors at all times. Ratio of participants to not exceed the number of rope lines in use as required by QORF. Safety rope to be kept taught on climber at all times under supervision from instructors

Hazards/Risks Control Measures Physical exertion Strains and sprains Exhaustion and fatigue Students Special needs High risk behaviours Medical conditions Student numbers. Emergency Procedures 1.Effect Rescue as required. 2.Conduct First Aid as required. 3.Contact Emergency Services via mobile phone, radio. 4.Depending on injury: Stabilise patient and await ambulance or remove patient to appropriate site to recover. 5.In the event of serious injury, suspend activity until incident can be investigated Have appropriate warm-up and warm-down activities Follow progressive and sequential skills development Have ice packs available Continuously monitor students for signs of fatigue and exhaustion Continuously monitor students for fear and/ or hesitancy, or loss of balance Obtain parental permission including relevant medical information When students with medical conditions are involved, ensure that relevant medical/ emergency plans and medications are readily available (insulin, Ventolin, Epipen, etc) Refer to individual education plan/educational adjustment plan/behaviour management plan and other student documents. Where necessary, obtain advice from relevant advisory visiting teachers or specialist teachers Ensure there is adequate adult supervision Ensure long hair is tied back before participating in the activity Students who are actively participating in the activity, to be seen by at lease one adult at all times Jewellery can be a serious hazard when undertaking many activities. All forms of jewellery should be considered in terms of the risk it presents for each activity. Procedures are in place the dissuade or protect (e.g. tape) the wearing of jewellery accordingly. Teacher/group leader responsibilities Inform & liaise with Activity Staff regarding any potential issues with group (behavioural, disabilities, injuries) Listen to activity briefings and assist Staff in procedural aspects of session as required, such as helping students to belay under supervision of Activity Staff Monitor & take charge of behavioural issues if needed and attend to any pre-existing medical conditions Participant Briefing Instructor should cover: Challenge by Choice Philosophy Session Objectives OH&S Brief Safety Brief Equipment Familiarisation Skills Demo & Practice Participant Requirements sunscreen, insect repellent medication (if relevant) water bottle fully enclosed shoes, hat minimum of sleeved shirt that covers midriff when arms are raised shorts/leggings that preferably cover knees (to prevent grazes) hair tied back, jewellery removed