CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

Similar documents
CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

D.B. Wilson Station CCR Landfill

STRUCTURAL STABILITY ASSESSMENT

TABLE OF CONTENTS LEGAL NOTICE

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

Notice of Intent to Close Inactive CCR Surface Impoundments

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Coal Combustion Residuals Closure Plan

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

Amended Written Closure Plan

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

HISTORY OF CONSTRUCTION

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

2016 Annual Inspection Report

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Closure Plan for CCR Surface Impoundments

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

2018 Annual Inspection Report

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

2017 Annual Inspection Report

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

CCR Fugitive Dust Control Plan

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

2016 Annual Inspection Report

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

FUGITIVE DUST CONTROL PLAN

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

2018 INSPECTION REPORT

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

Amec Foster Wheeler 2016.

FUGITIVE DUST CONTROL PLAN

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Green CCR Surface Impoundment

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

JAP Additional Information Sheet

Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

APPENDIX J HYDROLOGY AND WATER QUALITY

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

As temporary grade control facilities along waterways until final stabilization is established.

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

Effect of Perched Water Conditions in MSW Landfills: Considerations for Landfill Operators

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

PRELIMINARY STORM DRAINAGE REPORT

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

11/20/2014. Location Evaluation and Maximizing Flexibility of. Coeur d Alene Trust. Getting Started

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Trout Buffer Variance

CCR Closure Plan Ash Impoundment

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Design Assessment Checklist: Infiltration / Detention Basin

Large-scale Field Test

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

TECHNICAL MEMORANDUM 002 EMORANNO. 001

FACT SHEET MCGREGOR LAKE RESTORATION HABITAT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN ENVIRONMENTAL MANAGEMENT PROGRAM

What I ve Learned About Dam Safety Good, Bad and Ugly

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

Definitions as used in this Subchapter:

Holding Pond Annual Inspection Report

Holding Pond Annual Inspection Report

Annex E Bridge Pier Protection Plan

Appendix J: Q1-Highway 35 Route Construction Plan

Estimated on-the-ground start and end dates: 1 June October 2018

Location Evaluation and Maximizing Flexibility of a Waste Consolidation Area Cody J. Lechleitner, P.E.

RESILIENCE THROUGH RESTORATION

CHAPTER 4: BEST MANAGEMENT PRACTICES FOR EROSION AND SEDIMENTATION CONTROL

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

NSPS SUBPART Ka Check-off Form JULY 11, LAFAYETTE ROAD NO., ST. PAUL, MN

Section 7 Complete Green Street Guidelines DRAFT

FINAL Caples Lake Fisheries Management Plan. Version 4.0

Transcription:

CLOSURE PLAN CFR 257.102(b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio September, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical Engineering Services American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH 43215 GERS 16 087

TABLE OF CONTENTS 1.0 OBJECTIVE... 1 2.0 DESCRIPTION OF THE CCR UNIT... 1 3.0 DESCRIPTION OF CLOSURE PLAN 257.102(b)(1)(i)... 1 4.0 CLOSURE IN PLACE 257.102 (b)(1)(iii)... 1 4.1 CLOSURE PERFORMANCE STANDARDS 257.102 (d)(1)... 2 4.2 DRAINING AND STABILIZING OF THE SURFACE IMPOUNDMENT 257.102(d)(2)... 2 4.3 FINAL COVER SYSTEM 257.102 (d)(3)... 3 5.0 ESTIMATE OF MAXIMUM CCR VOLUME 257.102 (b)(1)(iv)... 3 6.0 ESTIMATE OF LARGEST AREA OF CCR REQUIRING COVER 257.102 (b)(1)(v)... 3 7.0 CLOSURE SCHEDULE 257.102(b)(1)(vi)... 3 iii

1.0 OBJECTIVE This report was prepared by AEP Geotechnical Engineering Services (GES) section to fulfill requirements of CFR 257.102(b) for Closure Plans of Existing CCR Surface Impoundments. 2.0 DESCRIPTION OF THE CCR UNIT The Cardinal Power Plant in Wells Township, Jefferson County, near the town of Brilliant in eastern Ohio. The Cardinal Power Plant is owned by Buckeye Power and AEP Generation Resources (GENCO) a unit of American Electric Power, is operated by Cardinal Operating Company. The facility operates two surface impoundments for storing CCR; the Bottom Ash Complex and Cardinal Fly Ash Reservoir 2 (FAR 2) Dam. The focus of this report is the Bottom Ash Complex. The BAP complex is comprised of diked embankments on the east and west sides while the north and south sides of the BAP are incised. The complex consists of two separate ponds, the larger bottom ash pond and the smaller recirculation pond. The surface areas of the ponds and is approximately 24.3 acres. The entire crest length is just over a mile, and the nominal crest width is 20 feet. The north end of the pond has been partially filled in with ash and the exact limits of the pond are poorly defined. The pond complex was originally developed as part of the construction of Units 1 and 2 in the 1960s. The crest of the dikes forming the original pond was at El. 658.0. However, the pond complex was raised to a crest elevation of 970.0 and extensively modified in 1974 as part of the construction of Unit 3. 3.0 DESCRIPTION OF CLOSURE PLAN 257.102(b)(1)(i) [A narrative description of how the CCR unit will be closed in accordance with this section] The BAP complex will be closed by closure in place. The closure will consist of re grading the existing onsite materials and the installation of an impermeable cap with vegetative cover. The existing surface will be graded to achieve a gently sloping surface to promote surface water runoff. The regraded surface will be covered with a flexible geomembrane system and 2 feet of soil fill consisting of an 18 soil infiltration layer and 6 of earthen material that is capable of sustaining native plant growth. The surface soil will be seeded and mulched to promote the growth of a vegetative cover. 4.0 CLOSURE IN PLACE 257.102 (b)(1)(iii) [If closure of the CCR unit will be accomplished by leaving the CCR in place, a description of the final cover system, designed in accordance with paragraph(d) of this section, and the methods and procedures to be used to install the final cover. The closure plan must also discuss how the final cover system will achieve the performance standards specified in paragraph (d) of this section.] The final cover system will consist of a flexible geomembrane that will have a permeability that is less than or equal to the permeability of the natural subsoils and is no greater than 1 x 10 5 cm/sec. The geomembrane will be installed directly over the graded CCR material. Over the geomembrane will be installed an infiltration layer consisting of 18 of earthen material and an erosion layer consisting of 6 of earthen material that is capable of sustaining native plant growth. The final cover will be seeded and mulched to promote growth of a vegetative cover. The final cover slope will be a minimum of 2% and will convey water to a NPDES permitted outfall. Prior to construction, the impoundment will be drained of the free water. Page 1 of 3

4.1 CLOSURE PERFORMANCE STANDARDS 257.102 (d)(1) 4.1.1 SECTION 257.102(d)(1)(i) [Control, minimize or eliminate, the maximum extent feasible, post closure infiltration of liquids into the waste and releases of CCR, leachate, or contaminated run off to the ground or surface waters or to the atmosphere.] The final cover system will cover the CCR material and will have a permeability that is less than or equal to the permeability of the natural subsoils and is no greater than 1 x 10 5 cm/sec. 4.1.2 SECTION 257.102(d)(1)(ii) [Preclude the probability of future impoundment of water, sediment, or slurry.] The impoundment will be graded with minimum side slopes of 2% to prevent the ponding of water with channels graded to drain. The dam may be lowered to preclude the future impoundment of water, sediment, or slurry. 4.1.3 SECTION 257.102(d)(1)(iii) [Include measures that provide for major slope stability to prevent the sloughing or movement of the final cover system during the closure and post closure care period.] The final cover system will be graded with side slopes with a minimum of 2% slope and a maximum 3:1 slope with channels provided to drain stormwater. The final configuration of the impoundment will meet the stability requirements to prevent the sloughing or movement of the final cover system during the closure and post closure care period. 4.1.4 SECTION 257.102(d)(1)(iv) [Minimize the need for further maintenance of the CCR unit.] The impoundment will be vegetated to prevent erosion. Maintenance of the final cover system will include mowing. 4.1.5 SECTION 257.102(d)(1)(v) [Be completed in the shortest amount of time consistent with recognized and generally accepted good engineering practices.] The CCR unit will be closed in a multi year phased manner as liquids are removed and areas are stabilized. There is currently no schedule for closure of this CCR unit. 4.2 DRAINING AND STABILIZING OF THE SURFACE IMPOUNDMENT 257.102(d)(2) [The owner or operator of a CCR surface impoundment or any lateral expansion of a CCR surface impoundment must meet the requirements of paragraph (d)(2)(i) and (ii) of this section prior to installing the final cover system required under paragraph (d)(3) of this section.] 4.2.1 SECTION 257.102(d)(2)(i) [Free liquids must be eliminated by removing liquid wastes or solidifying the remaining wastes and waste residue.] As part of closure of the CCR unit, all free water will be removed and the ash dewatered to sufficient depth to provide a stable surface. All water discharge will be in accordance with the NPDES permit. 4.2.2 SECTION 257.102(d)(2)(ii) [Remaining waste must be stabilized sufficient to support the final cover system.] Page 2 of 3

The remaining waste that make up the subgrade of the final cover system will be stabilized by removal of liquids to sufficient depth and providing bridging as necessary. 4.3 FINAL COVER SYSTEM 257.102 (d)(3) [If a CCR unit is closed by leaving CCR in place, the owner or operator must install a final cover system that is designed to minimize infiltration and erosion, and at a minimum, meets the requirements of paragraph (d)(3)(i) of this section, or the requirements of the alternative final cover system specified in paragraph (d)(3)(ii) of this section. The final cover system must be designed and constructed to meet the criteria in paragraphs (d)(3)(i)(a) through (D) of this section. The design of the final cover system must be included in the written closure plan.] The final cover system will consist of a flexible geomembrane that will have a permeability that is less than or equal to the permeability of the natural subsoils and is no greater than 1 x 10 5 cm/sec. The geomembrane will be installed directly over the graded CCR material. Over the geomembrane will be installed an infiltration layer consisting of 18 of earthen material and an erosion layer consisting of 6 of earthen material that is capable of sustaining native plant growth. The final cover will be seeded and mulched to promote growth of a vegetative cover. The final cover slope will be a minimum of 2% and will convey water to a NPDES permitted outfall. The final cover slope will be a minimum of 2% to accommodate settling and subsidence. 5.0 ESTIMATE OF MAXIMUM CCR VOLUME 257.102 (b)(1)(iv) [An estimate of the maximum inventory of CCR ever on site over the active life of the CCR unit.] The estimated maximum CCR volume ever on site is approx. 435 acre feet. 6.0 ESTIMATE OF LARGEST AREA OF CCR REQUIRING COVER 257.102 (b)(1)(v) [An estimate of the largest area of CCR unit ever requiring a final cover The largest area of the CCR unit ever requiring a final cover is 29 acres. 7.0 CLOSURE SCHEDULE 257.102(b)(1)(vi) [A schedule for completing all activities necessary to satisfy the closure criteria in the section, including an estimate of the year in which all closure activities for the CCR unit will be completed. The schedule should provide sufficient information to describe the sequential steps that will be taken to close the CCR unit, including identification of major milestones such as coordinating with and obtaining necessary approvals and permits from other agencies, the dewatering and stabilization phases of the CCR surface impoundment closure, or installation of the final cover system, and the estimated timeframes to complete each step or phase of the CCR unit closure. At this time there are currently no plans to close this CCR unit. Once the CCR unit requires closure a schedule to satisfy this section will be prepared. Page 3 of 3