Isolation of power supplies

Similar documents
SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

Lockout/Tagout Program

Health and Fire Safety Review 2/15

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

RiskTopics. Lockout/Tagout October 2017

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

THE OSHA LOCK-OUT/TAG-OUT STANDARD

H. Control of Hazardous Energy: Lockout/Tag Out

Lock Out - Tag Out Safety Program

Lockout/Tagout - Energy Control Program

Safety Manual: Hazardous Energy. January, 2017

Hazardous Energy Control

THE UNIVERSITY OF NORTH CAROLINA

Hazardous Energy Control (Lockout-Tagout)

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

University of Arkansas Office of Environmental Health and Safety

Lockout/Tagout Program

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

Lockout Tagout Program

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

2523-LDG-E. Leader s Guide

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

Lockout / Tagout Safety Program

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR

LOCKOUT/TAGOUT PLAN August 2015

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

LO/TO LOCKOUT/TAGOUT PROGRAM

Lock Out/Tag Out Control of Hazardous Energy

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Lockout/Tagout - Control of Hazardous Energy Program

Lockout/Tagout Safety Policy

Electrical Safety in the Food Industry

Lockout/Tagout Training Overview. Safety Fest 2013

Best Prac ce Guide 2 (Issue 2) Guidance on the management of electrical safety and safe isolation procedures for low voltage installations

Control of Hazardous Energy Program (Lockout/Tagout)

University of Vermont Department of Physical Plant Burlington, Vermont

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

Isolation Lockout and Tagging

SOP GEN-007I Energy Isolation

LOCKOUT-TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM

Health, Safety, Security and Environment

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico

General Lockout Training Briefing

2. The purpose of this program is to achieve the following objectives:

LOCKOUT/TAGOUT POLICY

Control of Hazardous Energy. Environmental Health and Safety

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

Lockout Tagout Policy

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary?

LOCKOUT/TAGOUT PROGRAM

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by

Thames Valley District School Board

Lockout/Tagout. Page. Introduction. Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4.

Facilities Management

Sample Lockout/Tagout Policy

Plant Isolation Lock out/tag out Procedure

This session covers the safety procedure known as lockout/tagout, which is required by Occupational Safety and Health Administration (OSHA) in its

Construction & Building Industry Safety Guideline. Electrical Isolations

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

Control of Hazardous Energy Lockout / Tagout Program

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

LOCK OUT \ TAG OUT PROGRAM

University of Tennessee Safety Program

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

The Proper Procedure

Hazardous Energy Lockout Standard. Safety Resources

CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

Isolating plant. Guidance Note. June 2011

Hazardous Energies Control and Lockout/Tagout Program

Lockout / Tag out Program

Gettysburg College. Energy Control Program

LOCKOUT / TAGOUT PROGRAM

Management Plan for Lockout Tagout (LOTO) ISD #535

LOCKOUT SYSTEM AND POLICIES

UCHC Lockout/Tagout Policy (4/09)

Big 5 Site Training Support Information

Product Information Report Lockout/Tagout Hazardous Energy Control

Lockout / Tagout Program OSHA 29 CFR

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

Texas Department of Insurance Division of Workers Compensation. Lockout Tagout HS96-100D (8-06)

Environmental Health & Safety Programs

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Control of Hazardous Energy Program (LOTO)

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

CONTROL OF HAZARDOUS ENERGY

Transcription:

Isolation of power supplies Guidance Note 14 Jan 14 1

Isolation of power supplies Legal Obligations The Health and Safety at Work Act 1974 sets out the general health and safety duties of employers, employees and the self-employed. The Electricity at Work Regulations 1989, require precautions to be taken against the risk of death or personal injury from electricity during work activities. To comply with these Regulations, the normal working method of carrying out work on electrical equipment or circuits should be with the system powered down and isolated (known as dead working). Live working should only be carried out in particular circumstances where it is unreasonable to work dead, such as fault finding and testing, where the risks are acceptable, and where suitable precautions can be taken against injury. The Provision of Work Equipment Regulations (PUWER) also require that every employer shall take appropriate measures to ensure that re-connection of any energy source to work equipment does not expose any person using the work equipment to any risk to his health or safety. Therefore the employer is responsible for ensuring that any employee, using or maintaining work equipment does not expose these workers to harm. This is of particular relevance whilst carrying out maintenance of work equipment, where the likelihood of staff being exposed to mechanical or electrical hazards is significantly greater than usual. All personnel involved in the isolation of plant and equipment should be trained and competent to carry out their responsibilities and understand the purpose, principles and practices of safe isolation procedures and safety rules. What is Isolation? Isolation means establishing a break in the energy supply in a secure manner, e.g. by ensuring that inadvertent reconnection is not possible. It may be necessary to also consider multiple energy sources, which may include electricity, pressure (hydraulic or pneumatic), or heat. Where appropriate, a safe method of dissipating stored energy (such as capacitors) should be considered. The key principle of isolation is that the point of isolation should be under the control of the person who is carrying out the work on the isolated equipment. 2

Electrical isolation For low voltage systems (up to 1000 v ac) the means of isolation could be an adjacent local isolation device such as a plug and socket, switch-disconnector, circuit breaker or fuse etc., as appropriate, which is under the direct control of the competent person carrying out the work. These methods can be used without further precautions provided there is no foreseeable risk that the supply could be reinstated by others. When there is no local means of isolation, or the point of isolation is not under the direct control of the competent person carrying out the work, or where there is a risk of inadvertent reinstatement of the supply by other workers, the circuit or equipment to be worked on should be securely isolated. Securing the point of isolation should be by a combination of the following methods; A padlock with unique key or combination A locked switch-room door or locked distribution box (DB) Circuit breakers should be locked-off using an appropriate locking-off clip with a padlock Removal of the relevant circuit fuse (may be used with a lockable fuse insert and padlock) The above padlocks keys or combinations and removed fuses should be retained by the competent person carrying out the work. Note The practice of putting insulating tape over a circuit breaker to prevent accidental switch on, is NOT a safe isolation procedure. Where more than one person will be working on equipment, the use of a multi-lock hasp can be used to prevent access to a main isolator until such time that all persons working on a system have completed their work and removed their padlocks from the hasp. In all instances where there is a risk that the supply could be inadvertently reinstated, an appropriate notice should be placed at the point of isolation e.g. Caution Do Not Switch On, System Undergoing Maintenance. 3

Figure 1: A selection of padlocks and Hasp. Proving the isolated equipment or circuit is dead Following isolation of equipment or circuits and prior to starting work you should prove that the parts to be worked on are dead. It must never be assumed that equipment is dead because a particular isolation device has been placed in the off position. The test instrument should be proved to be working on a known live source or proprietary proving unit before and after use. All phases of the supply and the neutral should be tested and proved dead. Care must always be taken to ensure all supplies to the equipment are isolated, some equipment may have additional supplies under certain conditions e.g. photo electric sensors which will only switch during the hours of darkness, therefore if the proving dead check was carried out during the day, the equipment may become live in the evening. Mechanical and other Isolation Procedures Where a machine or device is connected to a piping system e.g. hydraulic, pneumatic or where piping may introduce hazardous products during the repair process, the piping shall be disconnected, or disabled using a suitable device such as blanking plates. If possible the supply valve must be closed and locked out prior to work commencing. Valves should be locked with a padlock (and chain if required). If the valve cannot be locked off then the valve handle may be removed and retained by the person carrying out the maintenance. Blocking and/or restraints such as chocks or locking pins should be put into place to prevent any parts from moving during repairs. Residual or stored energy must be relieved or restrained prior to repair work commencing, this may include relaxing any springs, relieving any pressure or vacuum. 4

The final step should be to attempt to re-start or re-energize the equipment or machinery to verify an isolated condition. If the equipment does not re-start, then work can proceed. Note NEVER rely on an interlock device to adequately isolate equipment. Further guidance Safe use of work equipment L22 ISBN: 9780717662951 Available at: http://www.hse.gov.uk/pubns/books/l22.htm Electricity at work HSG 85 ISBN 9780717621644 Available at: http://www.hse.gov.uk/pubns/books/hsg85.htm Guidance on safe isolation procedures for low voltage installations NICEIC pocket guide No 5 Available at: http://www.niceic.com/en/account/media/17thpg5.pdf Copyright Santia 2014 This publication may be freely reproduced, except for advertising, endorsement or commercial purposes. 5