Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00

Similar documents
PROPOSAL. PROPOSAL OF, a corporation a

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max:

Riverside County Transportation Department Summary of Bids

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

Kansas Department of Transportation. Tabulation of Bids

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT


Tabulation of Bids. Counties:

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

Lake Waterford Community Association Meeting. November 15, 2016

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

ADA Training Standard Plans

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Restoration Requirements

R-3501-E2 R-3501-H4. R-3501-HL Mountable Curb Frame, Grate

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Keeping good roads good

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

Name Roads Station Distance Miles

Pavement Management Report. City Council Meeting of May 21, 2013

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

2018 ROAD MAINTENANCE PROGRAM

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Tabulation of Bids. Counties: Project(s):

ADA Self Evaluation and Transition Plan for Public Rights-of-Way

Chapter 4: Funding and Implementation

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

CURB RAMP INSPECTION REPORT

Building Great Neighbourhoods STRATHEARN

Taylor Road Resurfacing Project

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

Fleur Drive Reconstruction

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

CONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

CITY OF SOUTH DAYTONA

Tabulation of Bids. Counties:

Paul Vraney Bureau of Project Development 02/11/2016

Legislative Update Williamsburg Residency

Hospital Link Project Project Update September 2017

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

SECTION VII ROADWAY AND SITE IMPROVEMENTS

Preparing a Curb Ramp Project. December 15, 2010

MEMORANDUM. DATE: October 6, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report

4 GENERIC COST ESTIMATING TOOL

SECTION 3 STREET DESIGN

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Inspector MUST Sign and Date Each Inspection

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

Field guide for Accessible Public Rights-of-Way Edition

Welcome! Sherbrooke Neighbourhood Renewal Open House. Sherbrooke Open House February 3, Capital Construction

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

ADA on Construction. Guidance for Section C Plan Preparers

STANDARD OPERATING PROCEDURES

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Accommodating Pedestrians in the Work Zone

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

WELL COMPLETION & PROTECTION. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

BID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Hospital Link Project Project Update November 2017

Design Criteria. Design Criteria

General Notes. Project No /15/2018 Page 1 of 1

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

CLEANING, INSPECTION, AND TESTING OF SEWERS

January 25, Franklin Pasture Sanitary Sewer Cure-In-Place Pipe Lining Bid No Bid Date: 2/7/17 ADDENDUM NO 1

Building Great Neighbourhoods QUEEN ALEXANDRA

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

Planning Committee STAFF REPORT May 6, 2015 Page 2 of 4 Background In November 2011, the City of Walnut Creek applied for Measure J Program 12 TLC fun

Access requests to County streets and roadways are processed through one of the following methods:

IL Route 71 Construction Update

City of Davis Pavement Management Program

Driveway Design Criteria

Transcription:

30) Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 Quantity Unit Price Extension Section 1: Sanitary Manhole Rebilitation $581,301.80 100 Replace sanitary manhole casting (CITY to furnish casting); 118.00 $200.00 $23,600.00 102 External manhole chimney seal (9"); complete as 100.00 $430.00 $43,000.00 103 External manhole chimney seal (Infrashield); 11.00 $600.00 $6,600.00 104 8" external manhole chimney seal extension; 41.00 $280.00 $11,480.00 106 Internal manhole chimney seal (10"); complete as 14.00 $290.00 $4,060.00 108 10" internal manhole chimney seal extension; 3.00 $200.00 $600.00 110 7" internal manhole chimney seal extension; 5.00 $200.00 $1,000.00 111 Re-form/re-shape manhole bench; complete as 15.00 $100.00 $1,500.00 112 Concrete adjusting rings; 45.99 $270.00 $12,417.30 114 Rubber adjusting rings; 5.00 $600.00 $3,000.00 116 Reconstruct sanitary sewer manhole (slurry); 88.96 $590.00 $52,486.40 118 Furnish and install standard sanitary manhole (4' diameter) (slurry); 100.57 $830.00 $83,473.10 122 Saw cut concrete pavement; 5,460.00 $3.00 $16,380.00 124 Remove concrete pavement; Square Yards 2,275.00 $4.00 $9,100.00 126 Pavement ties; 1,820.00 $6.00 $10,920.00 128 7" concrete pavement; Square Yards 2,275.00 $68.00 $154,700.00 130 7" concrete pavement (HES); Square Yards 200.00 $75.00 $15,000.00 132 8" concrete pavement; Square Yards 200.00 $69.00 $13,800.00 134 8" concrete pavement (HES); Square Yards 200.00 $77.00 $15,400.00 136 Partial depth joints; 100.00 $0.10 $10.00 138 12" radius curb with 6" CABC and grading; 25.00 $10.00 $250.00 140 30" curb and gutter; 7"; with 5" CABC and grading; 25.00 $30.00 $750.00 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 1 of 6 Date: 11/17/2015

30) Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 Quantity Unit Price Extension 142 4" concrete sidewalk; 150.00 $7.00 $1,050.00 144 6" concrete sidewalk; driveway; and ramp; 100.00 $8.00 $800.00 146 Drilled No. 4 sidewalk tie bars; complete as 12.00 $5.00 $60.00 148 Curb ramp detectable warning field; complete as 8.00 $32.00 $256.00 150 Saw cut asphalt pavement; 832.00 $2.00 $1,664.00 152 Remove and replace HMA pavement; complete as Square Yards 512.00 $39.00 $19,968.00 154 Turf restoration; Square Yards 230.00 $9.00 $2,070.00 156 Manhole lid plug; 15.00 $14.00 $210.00 158 Tuck point manhole; 9.00 $125.00 $1,125.00 160 Sanitary manhole grouting setup; complete as 45.00 $660.00 $29,700.00 162 Sanitary manhole grout; Gallons 2,436.00 $2.00 $4,872.00 168 Cold mix patch; Square Yards 1,000.00 $22.00 $22,000.00 170 Traffic control; Lump Sum 1.00 $18,000.00 $18,000.00 Base Bid Total: $581,301.80 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 2 of 6 Date: 11/17/2015

Vinton Construction Company Dorner Inc. Section 1: Sanitary Manhole Rebilitation Replace sanitary manhole casting (CITY to furnish 100 casting); 102 External manhole chimney seal (9"); complete as 103 External manhole chimney seal (Infrashield); 104 8" external manhole chimney seal extension; 106 Internal manhole chimney seal (10"); complete as 108 10" internal manhole chimney seal extension; 110 7" internal manhole chimney seal extension; 111 Re-form/re-shape manhole bench; complete as 112 Concrete adjusting rings; 114 Rubber adjusting rings; 116 Reconstruct sanitary sewer manhole (slurry); 118 Furnish and install standard sanitary manhole (4' diameter) (slurry); 122 Saw cut concrete pavement; 124 Remove concrete pavement; Square Yards 126 Pavement ties; 128 7" concrete pavement; Square Yards 130 7" concrete pavement (HES); Square Yards 132 8" concrete pavement; Square Yards 134 8" concrete pavement (HES); Square Yards 136 Partial depth joints; 138 12" radius curb with 6" CABC and grading; 140 30" curb and gutter; 7"; with 5" CABC and grading; $592,180.27 $623,799.55 $100.00 $11,800.00 $500.00 $59,000.00 $675.00 $67,500.00 $350.00 $35,000.00 $675.00 $7,425.00 $302.00 $3,322.00 $270.00 $11,070.00 $211.00 $8,651.00 $270.00 $3,780.00 $327.00 $4,578.00 $225.00 $675.00 $218.00 $654.00 $225.00 $1,125.00 $204.00 $1,020.00 $450.00 $6,750.00 $978.00 $14,670.00 $225.00 $10,347.75 $300.00 $13,797.00 $800.00 $4,000.00 $1,000.00 $5,000.00 $707.00 $62,894.72 $575.00 $51,152.00 $804.00 $80,858.28 $1,000.00 $100,570.00 $2.50 $13,650.00 $2.11 $11,520.60 $10.00 $22,750.00 $4.00 $9,100.00 $6.50 $11,830.00 $7.39 $13,449.80 $60.00 $136,500.00 $63.00 $143,325.00 $63.00 $12,600.00 $69.00 $13,800.00 $63.00 $12,600.00 $74.00 $14,800.00 $66.00 $13,200.00 $79.00 $15,800.00 $5.00 $500.00 $3.17 $317.00 $10.00 $250.00 $32.45 $811.25 $35.00 $875.00 $49.00 $1,225.00 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 3 of 6 Date: 11/17/2015

Vinton Construction Company Dorner Inc. 142 4" concrete sidewalk; 144 6" concrete sidewalk; driveway; and ramp; 146 Drilled No. 4 sidewalk tie bars; complete as 148 Curb ramp detectable warning field; complete as 150 Saw cut asphalt pavement; 152 Remove and replace HMA pavement; complete as Square Yards 154 Turf restoration; Square Yards 156 Manhole lid plug; 158 Tuck point manhole; 160 Sanitary manhole grouting setup; complete as 162 Sanitary manhole grout; Gallons 168 Cold mix patch; Square Yards 170 Traffic control; Lump Sum Base Bid Total: $7.00 $1,050.00 $8.45 $1,267.50 $7.00 $700.00 $9.50 $950.00 $7.00 $84.00 $5.28 $63.36 $30.00 $240.00 $32.00 $256.00 $2.00 $1,664.00 $1.58 $1,314.56 $48.96 $25,067.52 $55.00 $28,160.00 $10.00 $2,300.00 $13.52 $3,109.60 $22.00 $330.00 $50.00 $750.00 $150.00 $1,350.00 $169.00 $1,521.00 $650.00 $29,250.00 $686.00 $30,870.00 $1.50 $3,654.00 $1.58 $3,848.88 $0.01 $10.00 $5.00 $5,000.00 $33,500.00 $33,500.00 $25,126.00 $25,126.00 $592,180.27 $623,799.55 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 4 of 6 Date: 11/17/2015

Advance Construction Inc. DE GROOT, INC. Section 1: Sanitary Manhole Rebilitation Replace sanitary manhole casting (CITY to furnish 100 casting); 102 External manhole chimney seal (9"); complete as 103 External manhole chimney seal (Infrashield); 104 8" external manhole chimney seal extension; 106 Internal manhole chimney seal (10"); complete as 108 10" internal manhole chimney seal extension; 110 7" internal manhole chimney seal extension; 111 Re-form/re-shape manhole bench; complete as 112 Concrete adjusting rings; 114 Rubber adjusting rings; 116 Reconstruct sanitary sewer manhole (slurry); 118 Furnish and install standard sanitary manhole (4' diameter) (slurry); 122 Saw cut concrete pavement; 124 Remove concrete pavement; Square Yards 126 Pavement ties; 128 7" concrete pavement; Square Yards 130 7" concrete pavement (HES); Square Yards 132 8" concrete pavement; Square Yards 134 8" concrete pavement (HES); Square Yards 136 Partial depth joints; 138 12" radius curb with 6" CABC and grading; 140 30" curb and gutter; 7"; with 5" CABC and grading; $796,650.40 $869,781.72 $650.00 $76,700.00 $808.00 $95,344.00 $662.00 $66,200.00 $382.77 $38,277.00 $652.00 $7,172.00 $361.26 $3,973.86 $584.00 $23,944.00 $382.77 $15,693.57 $400.00 $5,600.00 $384.92 $5,388.88 $330.00 $990.00 $366.63 $1,099.89 $322.00 $1,610.00 $328.99 $1,644.95 $600.00 $9,000.00 $454.50 $6,817.50 $400.00 $18,396.00 $707.00 $32,514.93 $900.00 $4,500.00 $1,565.50 $7,827.50 $750.00 $66,720.00 $1,163.53 $103,507.63 $1,000.00 $100,570.00 $1,519.79 $152,845.28 $1.91 $10,428.60 $6.06 $33,087.60 $10.00 $22,750.00 $12.12 $27,573.00 $7.00 $12,740.00 $8.48 $15,433.60 $75.00 $170,625.00 $72.72 $165,438.00 $80.00 $16,000.00 $78.78 $15,756.00 $85.00 $17,000.00 $84.84 $16,968.00 $90.00 $18,000.00 $90.90 $18,180.00 $3.00 $300.00 $3.64 $364.00 $45.00 $1,125.00 $36.36 $909.00 $60.00 $1,500.00 $54.54 $1,363.50 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 5 of 6 Date: 11/17/2015

Advance Construction Inc. DE GROOT, INC. 142 4" concrete sidewalk; 144 6" concrete sidewalk; driveway; and ramp; 146 Drilled No. 4 sidewalk tie bars; complete as 148 Curb ramp detectable warning field; complete as 150 Saw cut asphalt pavement; 152 Remove and replace HMA pavement; complete as Square Yards 154 Turf restoration; Square Yards 156 Manhole lid plug; 158 Tuck point manhole; 160 Sanitary manhole grouting setup; complete as 162 Sanitary manhole grout; Gallons 168 Cold mix patch; Square Yards 170 Traffic control; Lump Sum Base Bid Total: $10.00 $1,500.00 $9.70 $1,455.00 $11.00 $1,100.00 $10.91 $1,091.00 $5.00 $60.00 $6.06 $72.72 $30.00 $240.00 $36.36 $290.88 $1.90 $1,580.80 $3.03 $2,520.96 $50.00 $25,600.00 $55.55 $28,441.60 $30.00 $6,900.00 $15.15 $3,484.50 $40.00 $600.00 $45.45 $681.75 $255.00 $2,295.00 $176.75 $1,590.75 $650.00 $29,250.00 $722.15 $32,496.75 $1.50 $3,654.00 $1.67 $4,068.12 $38.00 $38,000.00 $12.37 $12,370.00 $34,000.00 $34,000.00 $21,210.00 $21,210.00 $796,650.40 $869,781.72 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 6 of 6 Date: 11/17/2015