30) Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 Quantity Unit Price Extension Section 1: Sanitary Manhole Rebilitation $581,301.80 100 Replace sanitary manhole casting (CITY to furnish casting); 118.00 $200.00 $23,600.00 102 External manhole chimney seal (9"); complete as 100.00 $430.00 $43,000.00 103 External manhole chimney seal (Infrashield); 11.00 $600.00 $6,600.00 104 8" external manhole chimney seal extension; 41.00 $280.00 $11,480.00 106 Internal manhole chimney seal (10"); complete as 14.00 $290.00 $4,060.00 108 10" internal manhole chimney seal extension; 3.00 $200.00 $600.00 110 7" internal manhole chimney seal extension; 5.00 $200.00 $1,000.00 111 Re-form/re-shape manhole bench; complete as 15.00 $100.00 $1,500.00 112 Concrete adjusting rings; 45.99 $270.00 $12,417.30 114 Rubber adjusting rings; 5.00 $600.00 $3,000.00 116 Reconstruct sanitary sewer manhole (slurry); 88.96 $590.00 $52,486.40 118 Furnish and install standard sanitary manhole (4' diameter) (slurry); 100.57 $830.00 $83,473.10 122 Saw cut concrete pavement; 5,460.00 $3.00 $16,380.00 124 Remove concrete pavement; Square Yards 2,275.00 $4.00 $9,100.00 126 Pavement ties; 1,820.00 $6.00 $10,920.00 128 7" concrete pavement; Square Yards 2,275.00 $68.00 $154,700.00 130 7" concrete pavement (HES); Square Yards 200.00 $75.00 $15,000.00 132 8" concrete pavement; Square Yards 200.00 $69.00 $13,800.00 134 8" concrete pavement (HES); Square Yards 200.00 $77.00 $15,400.00 136 Partial depth joints; 100.00 $0.10 $10.00 138 12" radius curb with 6" CABC and grading; 25.00 $10.00 $250.00 140 30" curb and gutter; 7"; with 5" CABC and grading; 25.00 $30.00 $750.00 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 1 of 6 Date: 11/17/2015
30) Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 Quantity Unit Price Extension 142 4" concrete sidewalk; 150.00 $7.00 $1,050.00 144 6" concrete sidewalk; driveway; and ramp; 100.00 $8.00 $800.00 146 Drilled No. 4 sidewalk tie bars; complete as 12.00 $5.00 $60.00 148 Curb ramp detectable warning field; complete as 8.00 $32.00 $256.00 150 Saw cut asphalt pavement; 832.00 $2.00 $1,664.00 152 Remove and replace HMA pavement; complete as Square Yards 512.00 $39.00 $19,968.00 154 Turf restoration; Square Yards 230.00 $9.00 $2,070.00 156 Manhole lid plug; 15.00 $14.00 $210.00 158 Tuck point manhole; 9.00 $125.00 $1,125.00 160 Sanitary manhole grouting setup; complete as 45.00 $660.00 $29,700.00 162 Sanitary manhole grout; Gallons 2,436.00 $2.00 $4,872.00 168 Cold mix patch; Square Yards 1,000.00 $22.00 $22,000.00 170 Traffic control; Lump Sum 1.00 $18,000.00 $18,000.00 Base Bid Total: $581,301.80 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 2 of 6 Date: 11/17/2015
Vinton Construction Company Dorner Inc. Section 1: Sanitary Manhole Rebilitation Replace sanitary manhole casting (CITY to furnish 100 casting); 102 External manhole chimney seal (9"); complete as 103 External manhole chimney seal (Infrashield); 104 8" external manhole chimney seal extension; 106 Internal manhole chimney seal (10"); complete as 108 10" internal manhole chimney seal extension; 110 7" internal manhole chimney seal extension; 111 Re-form/re-shape manhole bench; complete as 112 Concrete adjusting rings; 114 Rubber adjusting rings; 116 Reconstruct sanitary sewer manhole (slurry); 118 Furnish and install standard sanitary manhole (4' diameter) (slurry); 122 Saw cut concrete pavement; 124 Remove concrete pavement; Square Yards 126 Pavement ties; 128 7" concrete pavement; Square Yards 130 7" concrete pavement (HES); Square Yards 132 8" concrete pavement; Square Yards 134 8" concrete pavement (HES); Square Yards 136 Partial depth joints; 138 12" radius curb with 6" CABC and grading; 140 30" curb and gutter; 7"; with 5" CABC and grading; $592,180.27 $623,799.55 $100.00 $11,800.00 $500.00 $59,000.00 $675.00 $67,500.00 $350.00 $35,000.00 $675.00 $7,425.00 $302.00 $3,322.00 $270.00 $11,070.00 $211.00 $8,651.00 $270.00 $3,780.00 $327.00 $4,578.00 $225.00 $675.00 $218.00 $654.00 $225.00 $1,125.00 $204.00 $1,020.00 $450.00 $6,750.00 $978.00 $14,670.00 $225.00 $10,347.75 $300.00 $13,797.00 $800.00 $4,000.00 $1,000.00 $5,000.00 $707.00 $62,894.72 $575.00 $51,152.00 $804.00 $80,858.28 $1,000.00 $100,570.00 $2.50 $13,650.00 $2.11 $11,520.60 $10.00 $22,750.00 $4.00 $9,100.00 $6.50 $11,830.00 $7.39 $13,449.80 $60.00 $136,500.00 $63.00 $143,325.00 $63.00 $12,600.00 $69.00 $13,800.00 $63.00 $12,600.00 $74.00 $14,800.00 $66.00 $13,200.00 $79.00 $15,800.00 $5.00 $500.00 $3.17 $317.00 $10.00 $250.00 $32.45 $811.25 $35.00 $875.00 $49.00 $1,225.00 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 3 of 6 Date: 11/17/2015
Vinton Construction Company Dorner Inc. 142 4" concrete sidewalk; 144 6" concrete sidewalk; driveway; and ramp; 146 Drilled No. 4 sidewalk tie bars; complete as 148 Curb ramp detectable warning field; complete as 150 Saw cut asphalt pavement; 152 Remove and replace HMA pavement; complete as Square Yards 154 Turf restoration; Square Yards 156 Manhole lid plug; 158 Tuck point manhole; 160 Sanitary manhole grouting setup; complete as 162 Sanitary manhole grout; Gallons 168 Cold mix patch; Square Yards 170 Traffic control; Lump Sum Base Bid Total: $7.00 $1,050.00 $8.45 $1,267.50 $7.00 $700.00 $9.50 $950.00 $7.00 $84.00 $5.28 $63.36 $30.00 $240.00 $32.00 $256.00 $2.00 $1,664.00 $1.58 $1,314.56 $48.96 $25,067.52 $55.00 $28,160.00 $10.00 $2,300.00 $13.52 $3,109.60 $22.00 $330.00 $50.00 $750.00 $150.00 $1,350.00 $169.00 $1,521.00 $650.00 $29,250.00 $686.00 $30,870.00 $1.50 $3,654.00 $1.58 $3,848.88 $0.01 $10.00 $5.00 $5,000.00 $33,500.00 $33,500.00 $25,126.00 $25,126.00 $592,180.27 $623,799.55 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 4 of 6 Date: 11/17/2015
Advance Construction Inc. DE GROOT, INC. Section 1: Sanitary Manhole Rebilitation Replace sanitary manhole casting (CITY to furnish 100 casting); 102 External manhole chimney seal (9"); complete as 103 External manhole chimney seal (Infrashield); 104 8" external manhole chimney seal extension; 106 Internal manhole chimney seal (10"); complete as 108 10" internal manhole chimney seal extension; 110 7" internal manhole chimney seal extension; 111 Re-form/re-shape manhole bench; complete as 112 Concrete adjusting rings; 114 Rubber adjusting rings; 116 Reconstruct sanitary sewer manhole (slurry); 118 Furnish and install standard sanitary manhole (4' diameter) (slurry); 122 Saw cut concrete pavement; 124 Remove concrete pavement; Square Yards 126 Pavement ties; 128 7" concrete pavement; Square Yards 130 7" concrete pavement (HES); Square Yards 132 8" concrete pavement; Square Yards 134 8" concrete pavement (HES); Square Yards 136 Partial depth joints; 138 12" radius curb with 6" CABC and grading; 140 30" curb and gutter; 7"; with 5" CABC and grading; $796,650.40 $869,781.72 $650.00 $76,700.00 $808.00 $95,344.00 $662.00 $66,200.00 $382.77 $38,277.00 $652.00 $7,172.00 $361.26 $3,973.86 $584.00 $23,944.00 $382.77 $15,693.57 $400.00 $5,600.00 $384.92 $5,388.88 $330.00 $990.00 $366.63 $1,099.89 $322.00 $1,610.00 $328.99 $1,644.95 $600.00 $9,000.00 $454.50 $6,817.50 $400.00 $18,396.00 $707.00 $32,514.93 $900.00 $4,500.00 $1,565.50 $7,827.50 $750.00 $66,720.00 $1,163.53 $103,507.63 $1,000.00 $100,570.00 $1,519.79 $152,845.28 $1.91 $10,428.60 $6.06 $33,087.60 $10.00 $22,750.00 $12.12 $27,573.00 $7.00 $12,740.00 $8.48 $15,433.60 $75.00 $170,625.00 $72.72 $165,438.00 $80.00 $16,000.00 $78.78 $15,756.00 $85.00 $17,000.00 $84.84 $16,968.00 $90.00 $18,000.00 $90.90 $18,180.00 $3.00 $300.00 $3.64 $364.00 $45.00 $1,125.00 $36.36 $909.00 $60.00 $1,500.00 $54.54 $1,363.50 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 5 of 6 Date: 11/17/2015
Advance Construction Inc. DE GROOT, INC. 142 4" concrete sidewalk; 144 6" concrete sidewalk; driveway; and ramp; 146 Drilled No. 4 sidewalk tie bars; complete as 148 Curb ramp detectable warning field; complete as 150 Saw cut asphalt pavement; 152 Remove and replace HMA pavement; complete as Square Yards 154 Turf restoration; Square Yards 156 Manhole lid plug; 158 Tuck point manhole; 160 Sanitary manhole grouting setup; complete as 162 Sanitary manhole grout; Gallons 168 Cold mix patch; Square Yards 170 Traffic control; Lump Sum Base Bid Total: $10.00 $1,500.00 $9.70 $1,455.00 $11.00 $1,100.00 $10.91 $1,091.00 $5.00 $60.00 $6.06 $72.72 $30.00 $240.00 $36.36 $290.88 $1.90 $1,580.80 $3.03 $2,520.96 $50.00 $25,600.00 $55.55 $28,441.60 $30.00 $6,900.00 $15.15 $3,484.50 $40.00 $600.00 $45.45 $681.75 $255.00 $2,295.00 $176.75 $1,590.75 $650.00 $29,250.00 $722.15 $32,496.75 $1.50 $3,654.00 $1.67 $4,068.12 $38.00 $38,000.00 $12.37 $12,370.00 $34,000.00 $34,000.00 $21,210.00 $21,210.00 $796,650.40 $869,781.72 I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_11-17-15 Page 6 of 6 Date: 11/17/2015