TRANSPORTATION IMPACT ANALYSIS GUIDELINES WALKING/ACCESSIBILITY MEMO APPENDICES

Similar documents
Memorandum INTRODUCTION

Mission Bay Loop (MBL) Public Meeting

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Memorandum INTRODUCTION

Freeway ramp intersection study

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Transportation Impact Study for Abington Terrace

Addendum to Mitigated Negative Declaration

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Cycle Track Design Best Practices Cycle Track Sections

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Chapter 2: Standards for Access, Non-Motorized, and Transit

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

TRANSPORTATION IMPROVEMENT STRATEGY

FINAL REPORT DECEMBER 2011

TRAFFIC IMPACT STUDY CRITERIA

Orange Center Elementary School

FOLSOM-HOWARD STREETSCAPE OVERVIEW

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Broad Street Bicycle Boulevard Design Guidelines

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Off-road Trails. Guidance

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

Better Market Street Project. Project Update January 15, 2015

TRAFFIC STUDY GUIDELINES Clarksville Street Department

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

Transportation Planning Division

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

See Figure 38, Existing Nonmotorized Connections.

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

CURBSIDE ACTIVITY DESIGN

CONNECTING PEOPLE TO PLACES

Hidden Oaks Elementary School

Meadow Woods Elementary School

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

NJDOT Complete Streets Checklist

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Appendix A: Crosswalk Policy

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

NEWMARKET UPHAM S CORNER

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Classification Criteria

Pedestrian and Bicycle Improvements in Balboa Park Station Area

San Jose Transportation Policy

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Report. Typical Sections. City of Middleton, WI

CHAPTER 3. Transportation and Circulation

Windy Ridge Elementary School

Explanation of Criteria. Cross Section Comparison. Cross Section Scores. Intersection Comparison. Intersection Scores. Corridor LTS Overall

Transportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Southside Pilot Proposal

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Central Avenue Bikeway Traffic and Safety Impact Assessment

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

Station 1: Street & Sidewalk Upgrades

San Pablo High Treatment applied incrementally at each N + ++

San Francisco 2009 Collisions Report April 21, 2011

Traffic Signal Phasing Study Summary & Staff Recommendations

Roadways. Roadways III.

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Hennepin County Pedestrian Plan Public Comment Report

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

MARTIN LUTHER KING JR. WAY

Public Meeting #1 Comment Summary

5 CIRCULATION AND STREET DESIGN

ACTIVE TRANSPORTATION

C C C

TECHNICAL MEMORANDUM. Introduction

Traffic Impact Study for Rolling Ridge Redevelopment

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for:

Traffic Impact Memorandum. May 22, 2018

POTRERO HILL TRAFFIC CALMING PROJECT DECEMBER 2009

Table 1. Greatest Reductions in Traffic Volume

Lawrence Avenue Streetscape Concepts August 30, 2011

RED COLORED TRANSIT-ONLY LANES REQUEST TO EXPERIMENT

Community Transportation Plan

ALLEY 24 TRAFFIC STUDY

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Pedestrian Project List and Prioritization

City of Port St. Lucie Neighborhood Traffic Calming Policy City of Port St. Lucie Neighborhood Traffic Calming Policy Adopted June 26, 2017

PEDESTRIAN ACTION PLAN

INTERSECTION DESIGN TREATMENTS

Transcription:

TRANSPORTATION IMPACT ANALYSIS GUIDELINES WALKING/ACCESSIBILITY MEMO APPENDICES

APPENDIX A Existing and Proposed Project Figure and Table Examples Introduction Appendix A represents typical figures necessary to illustrate walking conditions included in a transportation study. All figures should include basic elements (e.g., north arrow, title, legend, references, acronyms, etc.). Symbology should reflect that documents may be printed in black and white. All figures and tables should include all the information the reader would need to understand the information presented. The figures presented below were from previous transportation studies and are illustrative only and may not include all the basic elements. PAGE 2 Transportation Impact Analysis Guidelines

FIGURE 1 Site Plan/Ground Floor Plan Figure 1 is an example of a site plan that includes a detailed description of existing and proposed on-street loading. When developing a map similar to the one shown, include the linear dimensions of the existing and proposed loading zones, match the color of the zones to those used in the SFMTA Color Curb Program, and make existing and proposed changes explicit. 532 JONES ST. BUILDING 12'-0" (DRIVEWAY) 5-4 5-4 CHURCH JONES ST. EXIST'G EXISTING HOTEL ADJACENT BUILDING (500 Jones St) PROJECT 450 O'FARRELL SITE ST. BUILDING SHANNON ST. 10' 45' 12' 4' 15'-4" 15' EXISTING 8'-0" 38' O'FARRELL ST. 10' PROPOSED 0 20 FEET PARKING SPACE KEY YELLOW ZONE - COMMERCIAL LOADING SPACE (METERED M-F 9AM-4PM) GENERAL PARKING SPACE (METERED) GENERAL PARKING METERED/PASSENGER LOADING/UNLOADING ZONE DURING CHURCH SERVICES PASSENGER LOADING/UNLOADING AT ALL TIMES PAGE 3 Transportation Impact Analysis Guidelines

FIGURE 2 Walking/Accessibility Circulation Figure 2 shows a walking and accessibility circulation map, including circulation from surrounding streets and internal circulation. The dotted lines represent primary street access for people walking and the straight lines represent secondary access. office building entrance South Street food hall entrance 3rd Third Street Street VIP entrance primary event center entrance bayfront terrace skybar lobby entrance Terry Terry A. Francois A Boulevard Blvd VIP entrance Project Site Boundary office building entrance 16th Street secondary event center entrance 0 100 Feet PAGE 4 Transportation Impact Analysis Guidelines

TABLE 1 Existing Project Site Characteristics Table 1 below presents typical project characteristics for existing conditions on the project site. The table should include all necessary information to describe the existing conditions (e.g., existing land use types, parking, and loading information). As shown in Table 1, x represents numerical values that would need to be provided and be consistent with project plans. Existing Project Site Characteristics Address (Building 1) Address (Building 2) TOTAL Gross Square Footage by Use Land Use 1 xxx,xxx xxx,xxx xxx,xxx Land Use 2 xxx,xxx xxx,xxx xxx,xxx Land Use 3 xxx,xxx xxx,xxx xxx,xxx Residential Unit Mix Two-bedroom units+ x x x TOTAL x x x Affordable Housing Units (by age and/or income level) Percentage by income level x x x Percentage by age x x x Hotel Rooms Number of rooms x x x Entertainment Venues Number of seats x x x Schools Number of students x x x Freight/Service Loading freight/service loading freight/service loading x Passenger Loading passenger loading passenger loading x Automobile Parking and Car-share Number of spaces x x x Source: xxxxxx PAGE 5 Transportation Impact Analysis Guidelines

TABLE 2 Proposed Project Characteristics/Project Summary Table 2 below presents typical project characteristics for proposed project conditions on the site. The table should include all necessary information to describe the proposed project conditions (e.g., proposed land use types, parking, and loading information). Similar to Table 1, x represents numerical values that would need to be provided and be consistent with project plans. Project Characteristic Address (Building 1) Address (Building 2) TOTAL Gross Square Footage by Use Land Use 1 xxx,xxx xxx,xxx xxx,xxx Land Use 2 xxx,xxx xxx,xxx xxx,xxx Land Use 3 xxx,xxx xxx,xxx xxx,xxx Residential Unit Mix Two-bedroom units+ x x x TOTAL x x x Affordable Housing Units (by age and/or income level) Percentage by income level x x x Percentage by age x x x Hotel Rooms Number of rooms x x x Entertainment Venues Number of seats x x x Schools Number of students x x x Freight/Service Loading freight/service loading freight/service loading x Passenger Loading passenger loading passenger loading x Automobile Parking and Car-share Number of spaces x x x Source: xxxxxx PAGE 6 Transportation Impact Analysis Guidelines

TABLE 3 Peak Hour Counts for People Walking at Study Intersections Table 3 below shows the typical format to present counts of people walking at all identified project intersections/street segments. X represents the volume of people walking that were observed during counts. Intersection Intersection Leg Counts at Peak Period (INSERT TIME) TOTAL North South East West Intersection 1 x x x x x Intersection 2 x x x x x Intersection 3 x x x x x Intersection 4 x x x x x PAGE 7 Transportation Impact Analysis Guidelines

FIGURE 3 Walking Network Figure 3 is an example of mapping the existing network as it relates to people walking within a project study area, with a focus on missing features for the network. Inclusion of this figure would be appropriate in the Existing Baseline section. Tenth Tenth St St Tenth Tenth St St Ninth St Ninth St Eighth St Eighth St Market St Market St Seventh Seventh St St Seventh Seventh St St Sixth Sixth St St Howard Howard St St Sixth Sixth St St Howard Howard St St Mission Mission St St Mission Mission St St 80 80 Bryant Bryant St St Folsom Folsom St St Bryant Bryant St St Folsom Folsom St St 101 280 Second Second St St Harrison Harrison St St Fourth Fourth St St Brannan St 101 280 Second Second St St Harrison Harrison St St Brannan St Channel Channel St St Townsend Townsend St St King King St St Terry Terry Francois Francois Blvd Blvd Tenth Tenth St St Ninth St Eighth St Market St Seventh Seventh St St Sixth Sixth St St Howard Howard St St Mission Mission St St 80 Bryant Bryant St St Folsom Folsom St St 101 280 Second Second St St Harrison Harrison St St Fourth Fourth St St Brannan St Fourth Fourth St St Channel Channel St St Townsend Townsend St St King King St St Terry Terry Francois Francois Blvd Blvd Channel Channel St St Townsend Townsend S Kin Kin 16th St 16th St 16th St Mariposa St Mariposa St 18th St 18th St Tennessee St Minnesota St Tennessee St Minnesota St Illinois St Illinois St Mariposa St 18th St 20th St Tennessee St Minnesota St Indiana Indiana St St N:\Projects\2013 Projects\SF13-0722_Pier_70_EIR Potrero Potrero Ave Ave Potrero Potrero Ave Ave 20th St 80 80 20th St 22nd St 22nd St 23rd St 25th St 25th St 23rd St Cesar Chavez St Cesar Chavez St Mississippi Mississippi St St Texas Texas St St Texas Texas St St Mississippi Mississippi St St Pennsylvania Pennsylvania Ave Ave Pennsylvania Pennsylvania Ave Ave Indiana Indiana St St Indiana Indiana St St N:\Projects\2013 Projects\SF13-0722_Pier_70_EIR ADA Curb Ramp Not Present Potrero Potrero Ave Ave Project Site Project Site 80 22nd St 23rd St 25th St Cesar Chavez St Multiple Turning Lanes Mississippi Mississippi St St Texas Texas St St Pennsylvania Pennsylvania Ave Ave ADA Curb Ramp Not Not Present Multiple Multiple Turning Turning Lanes Lanes Crosswalk Closed Study Area Crosswalk Closed Study Study Area Area PAGE 8 Transportation Impact Analysis Guidelines

APPENDIX B Mitigation and Improvement Measures MITIGATION MEASURES FOR LAND USE DEVELOPMENT PROJECTS LOCATED WITHIN AN AREA PLAN Balboa Park Station Area Plan Improvement Measure: Provide signals with countdown indicators at all major intersections and at crosswalks that connect to the MUNI light rail stops and Balboa Park BART Station. Eastern Neighborhoods Rezoning and Area Plan Improvement Measure E-1: Pedestrian Circulation E.1.a. As an improvement measure to improve pedestrian conditions in the Eastern Neighborhoods, community-supported planning efforts as part of MTA s Livable Streets program should be conducted to identify specific improvements to enhance pedestrian travel and safety in each neighborhood. E.1.b. As an improvement measure to facilitate completion of the sidewalk network in areas where substantial new development is projected to occur, property owners should be encouraged to develop improvement or assessment districts to fund improvements to the sidewalk network adjacent to parcels where new development is not anticipated to occur. Market and Octavia No applicable mitigation and improvement measures were identified. Transit Center District Plan M-TR-4a: Widen Crosswalks. To ensure satisfactory pedestrian level of service at affected crosswalks, the Municipal Transportation Agency, Sustainable Streets Division, could conduct periodic counts of pedestrian conditions (annually, for example) and could widen existing crosswalk widths, generally by 1 to 3 feet, at such times as pedestrian LOS is degraded to unacceptable levels. M-TR-5: Garage/Loading Dock Attendant. If warranted by project-specific conditions, the project sponsor of a development project in the Plan area shall ensure that building management employs attendant(s) for the project s parking garage and/ or loading dock, as applicable. The attendant would be stationed as determined by the project specific analysis, typically at the project s driveway to direct vehicles entering and exiting the building and avoid any safety-related conflicts with people walking on the sidewalk during the a.m. and p.m. peak periods of traffic and pedestrian activity, with extended hours as dictated by traffic and pedestrian conditions and by activity in the project garage and loading dock. (See also Mitigation Measure M-TR-4b, above.) Each project shall also install audible and/or visible warning devices, or comparably effective warning devices as approved by the Planning Department and/or the Sustainable Streets Division of the Municipal Transportation Agency, to alert people walking of the outbound vehicles from the parking garage and/or loading dock, as applicable. PAGE 9 Transportation Impact Analysis Guidelines

MITIGATION AND IMPROVEMENT MEASURE EXAMPLES The following lists the typical types of measures that can mitigate or lessen impacts to people walking for each significance criterion: EXAMPLE 1 Potentially Hazardous Conditions Establish safe site distances (e.g., daylighting, re of curb cuts or new structures); Widen existing sidewalks or install sidewalks where none exist; Relocate entrances/exits for people walking away from off-street garage/loading docks; Signal changes such as reducing signal cycle lengths or leading intervals for people walking; and Provide network improvements such as crosswalks, shorter blocks, mid-block crossings, or mid-block alleys between the project site and intersections, adjacent transit stations/stops, and other major destinations Manage freight and service deliveries (e.g., active loading managment plan) Employ queue abatement measures or pursue deisgn modifications to off-street vehicular entrances/exits to accommodate queing vehicles (see queue abatement language below) Install visible and/or audible warning devices at off-street vehicular driveways to alert both people walking and driving of activity at the driveway; Provide on-site signage promoting safety for people walking (e.g., signage at the garage exit reminding motorists to slow down and yield to people walking in the sidewalk); Facilitate safe crossings (e.g., stop-controlled intersections, installation of signal heads with countdown timers; installation of audible warning devices, refuge islands); Provide roadway designs that slow vehicle speeds such as traffic calming measures (e.g., bulb-outs, chicanes, speed humps, tighter turning radii) Remove turn pockets Signalize vehicle turning movements and restrict vehicle movements on red EXAMPLE 2 Accessibility Construct, upgrade, or redesign curb ramps and sidewalks to be ADA compliant; Provide adequate sidewalks (e.g., effective widths, paths of travel) Widen existing sidewalks or install sidewalks where none exist); Employ queue abatement measures or pursue design modifications to off-street vehicular entrances/exits to accommodate queuing vehicles (see queue abatement language below) Povide network improvements such as crosswalks, shorter blocks, mid-block crossings, or mid-block alleys between the project site and intersections, adjacent transit stations/stops, and major destinations Place physical structure underground or in another to maintain access for people walking Place wayfinding signs to direct people walking towards entrances/exits PAGE 10 Transportation Impact Analysis Guidelines

QUEUE ABATEMENT SAMPLE LANGUAGE Update the sample language, particularly in the second and third paragraphs, to reflect the conditions at the project site and the characteristics of the project. The language should provide specific proactive measures to prevent queues from taking place, as opposed to mitigating the queue after it occurs. It will be the responsibility of the owner/operator of any off-street parking facility with more than 20 parking spaces (excluding loading and carshare spaces) to ensure that vehicle queues do not occur regularly on the public right-of-way. A vehicle queue is defined as one or more vehicles (destined to the parking facility) blocking any portion of any public street, alley, or sidewalk for a consecutive period of 3 minutes or longer on a daily or weekly basis. If a recurring queue occurs, the owner/operator of the parking facility will employ abatement methods as needed to abate the queue. Appropriate abatement methods will vary depending on the characteristics and causes of the recurring queue, as well as the characteristics of the parking facility, the street(s) to which the facility connects, and the associated land uses (if applicable). Suggested abatement methods include but are not limited to the following: redesign of facility to improve vehicle circulation and/or on-site queue capacity; employment of parking attendants; installation of LOT FULL signs with active management by parking attendants; use of valet parking or other space-efficient parking techniques; use of off-site parking facilities or shared parking with nearby uses; use of parking occupancy sensors and signage directing drivers to available spaces; TDM strategies such as additional bicycle parking, customer shuttles, delivery services; and/or parking demand management strategies such as parking time limits, paid parking, time-of-day parking surcharge, or validated parking. If the Planning Director, or his or her designee, suspects that a recurring queue is present, the Planning Department will notify the property owner in writing. Upon request, the owner/ operator will hire a qualified transportation consultant to evaluate the conditions at the site for no less than 7 days. The consultant will prepare a monitoring report to be submitted to the Planning Department for review. If the Planning Department determines that a recurring queue does exist, the facility owner/operator will have 90 days from the date of the written determination to abate the recurring queue or conflict. PAGE 11 Transportation Impact Analysis Guidelines

APPENDIX C Planning Code Compliance Checklist Below is a planning code compliance checklist template as it relates to all transportation topics. In addition to the project s transportation demand management program application, land use table, and worksheet, please fill out and include as an appendix to the transportation study. Project Description: [Briefly describe the proposed project] Use District: [Include the use district(s)] Topic Planning Code Reference Planning Code Requirement Proposed Project Existing Conditions Vehicle Parking (Off-Street) 151 Required 151.1 Permitted Car-Share Parking (Off-Street) 166 Required 166(6)(c) Permitted Bicycle Parking 155.2 Required (Table 155.2) Freight Loading and Service Vehicles (Off-Street) 152, 152.1, 152.2 Required (Tables 152, 152.1, 152.2) Off-Street Parking, Freight Loading, and Service Vehicles 154(b), 155(s)(4) Required Protected Street Frontages 155(r) Required Tour Bus Loading Spaces 162 Required 138.1 Streetscape and Pedestrian Improvements n/a Public Realm Changes 270.2 Mid-block Alleys in Large Lot Developments n/a PAGE 12 Transportation Impact Analysis Guidelines