Installation. Heat Trace Combination Drench Shower and Eyewash Unit (includes 120 V and 208/240 V versions) S19-304GA

Similar documents
Installation. S19-300T (top supply) S19-300B (bottom supply)

Installation S Gallon Tank (ASME rated) with Eyewash and Hose Spray

Installation S S19-788LHS

PEDESTAL MOUNTED EMERGENCY EYE & EYE/FACE WASH

EMERGENCY WALL MOUNTED HAND OPERATED DELUGE SHOWER

Product Manual B-Safety ClassicLine & PremiumLine Emergency Eyewash and Eye/Face Wash Equipment

WALL MOUNTED EMERGENCY EYE & EYE/FACE WASH HAND OPERATED

Model PSI Compressor with 3-Gallon Air Tank 12VDC

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

Emergency Shower & Eyewash. Training Guide

8320 AXION MSR COMBINATION EYE / FACE WASH & DRENCH SHOWER

PumpAgents.com - Click here for Pricing/Ordering Nominal psi (bar) Cut-In Cut-Out

200 PSI COMPRESSORS - MODEL NUMBERS

ANSI / ISEA Z Compliance Checklist

Emergency Eyewash & Shower Testing Program

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO

100C Air Compressor Kit

Standards of Practice Emergency Shower/Eyewash Installation, Use, Testing & Maintenance

BPB26-1 AND SSPB26-1 PATIO BASE INSTALLATION INSTRUCTIONS

36H SERIES Combination Gas Valve

Halsey Taylor Owners Manual STOP!

O&M Receiving and Inspection. Storage of Water Treatment Media

V43 Pressure Actuated Water Regulating Valve

ANSI / ISEA Z Compliance Checklist

1.0 PURPOSE 2.0 SCOPE 3.0 DEFINITIONS. ANSI: American National Standards Institute. CCC: Chemical Control Centre

Installation and commissioning instructions 255 series and 256 series

36E03 and 36E38 DSI and HSI Step Opening Combination Gas Valve INSTALLATION INSTRUCTIONS

Scald Protection Three-Way Thermostatic Mixing Valve

Pipe Thread Connection 1/2 inch NPT. Friction Loss Refer to Figure 3

LRS(H)4 Pressure-Reducing Regulator User Manual

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

IMPORTANT SAFETY INSTRUCTIONS

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

Design Requirements for Eyewash and Safety Shower Units

EMERGENCY EYEWASH & SHOWERS

INSTALLATION INSTRUCTIONS 1/2 THERMOSTATIC VALVE AND TRIM

Combination Air Valve

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

SWIRLFLO Refrigerated fountains with FLEXI-GUARD

SPECIFICATIONS ATTENTION

Model 9201E Tempered Water Blending System

BP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS

RD(H)20/25 Pressure-Reducing Regulator User Manual

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

Operator: Save these instructions for future use!

Laboratory Safety Guideline Emergency Eyewash and Safety Showers

PAGE (Rev. A - 06/17)

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

Booster Pump PB4-60 Replacement Kits

444C DUAL PERFORMANCE VALUE PACK

ULTRA-LIGHT DUTY ONBOARD AIR SYSTEM

Pressure Independent Control Series

Scald Protection 3-Way Thermostatic Mixing Valve

42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only)

Geotech 1.66 Reclaimer

ANSI Z Compliance Checklist

Model TWBS.SH Tempered Water Blending System

TECHNICAL INSTRUCTIONS

Direct Operated Precision Regulator Modular Style. Standard Specifications

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

OPERATION AND INSTRUCTION MANUAL

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

GUARDIAN EQUIPMENT Emergency Eye Wash and Shower Equipment. ANSI Z358.1 Compliance Checklist

Geotech 1.66 Auto-Reclaimer

OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: SWY100N

36E DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

BRILLIANT WONDERS LED BUBBLERS INSTALLATION INSTRUCTIONS & PRODUCT MANUAL CMP SERIES

INSTRUCTION MANUAL Pressure Relief Device LPT

DS05C,D,G Dial Set Pressure Regulating Valves

Installation, Operation, and Maintenance Manual

NGP-250/500 Nitrogen Generator Quick Start Guide

Halsey Taylor Owners Manual

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

Model Series 62 Constant Differential Relay

PRESSURE TANKS HANDLING & INSTALLATION INSTRUCTIONS INSTALLATION MANUAL CONTROL VALVES

Model 40H Nullmatic Pressure Regulators

Installation and Use Manual

Instruction Manual Updated 7/26/2011 Ver. 2.2

BRILLIANT WONDERS LED BUBBLERS INSTALLATION INSTRUCTIONS CMP SERIES. Brilliant Wonders LED BUBBLERS

Easy Nest Kits. Installation Suggestions

AQUAMATIC EASY NEST KITS INSTALLATION SUGGESTIONS

Dual Solenoid Gas Valve Installation

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

NORMAL OPERATING DISPLAYS GENERAL OPERATION

FlashGARD HP Reverse Osmosis Filtration System Model Number FSTMO75 Part Number

36E DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE

400C & 450C DUAL PERFORMANCE VALUE PACKS

400H HARDMOUNT AIR COMPRESSOR KIT PART NO H HARDMOUNT AIR COMPRESSOR KIT PART NO

Geotech 1.66 Auto-Reclaimer Installation and Operation

MLS Series Liquid Level Switches. Installation and Operations Manual Section 15

Yoke Block Instruction Manual

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25

Halsey Taylor Owners Manual

D05 Pressure Regulating Valves

Your safety and the safety of others are very important.

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

1800C and 1800C-HC Series Service Regulators

Transcription:

Heat Trace Combination Drench Shower and Eyewash Unit (includes 120 V and 208/240 V versions) Top or Bottom Supply General Area Table of Contents Pre-Installation Information... 2-3 Components...4 Supplies Required...4 Dimensions...5 Secure Unit to Floor...5 Connect Water Supply...6 Assemble Components...6 Connect Electrical Supply...7 Wiring Diagrams...8 Troubleshooting...9 215-1856 Rev. B; ECN 17-05-043A 2017 Bradley Page 1 of 9 7/10/2017 P.O. Box 309 Menomonee Falls, WI 53052 USA 800 BRADLEY (800 272 3539) +1 262 251 6000 bradleycorp.com

Installation WARNING Flush the water supply lines before beginning installation and after installation is complete. Test the unit for leaks and adequate water flow. Main water supply to the unit should be "ON" at all times unless system is being serviced. Provisions shall be made to prevent unauthorized shutoff. Power supplied to the unit should be 120VAC or 208-240VAC, 50-60 Hz, 15 amp branch circuit with a dedicated circuit breaker or fuse and should not supply power to any other device. Compliance and conformity to local codes and ordinances is the responsibility of the installer. Do not use this safety equipment in a location that does not match its hazardous location rating. Verify the appropriate ratings prior to installation. When making electrical connections be sure to follow all lockout-tagout safety procedures. CAUTION Emergency equipment must be supplied with tepid water (60-100 F/15.6-37.8 C). Any prolonged exposure to near freezing water affects the body's ability to maintain body temperature, increasing the risk of hypothermia. The unit must be supplied with clean, potable water. NOTICE Before installing this product ensure that there are adequate clearances around the product and activation of the product does not interfere with other products or obstructions. It is recommended that all water supply and electrical connections be made at temperatures above freezing. Failure to do so may result in major product and/or property damage. Constant power supply to the safety equipment is necessary for it to function. Avoid cleaners containing organic solvents, alcohols and hydrocarbons. Rinse with potable water after cleaning. 2 7/10/2017 Bradley 215-1856 Rev. B; ECN 17-05-043A

IMPORTANT The installation and location of all safety drench showers, eye and eye/face washes must comply with the requirements of ANSI/ISEA Z358.1. Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance department. Compliance and conformity to local codes and ordinances is the responsibility of the installer. Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts. Installation and maintenance of this system must be completed by a qualified plumber and electrician according to the information contained in this installation manual and in compliance with all national and local codes. The ANSI/ISEA Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed emergency fixtures require a minimum of 30 PSI (0.21MPa) flowing pressure. Flushing should be tepid per ANSI Z358.1 Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable flushing fluid supply is present and any sediment build up in the supply line is cleared. Inspect safety equipment monthly to address any maintenance issues ensuring the equipment is in good operating condition and that there are no signs of wear. Perform functional test upon relocation of safety equipment. The inspection and testing results of this equipment should be recorded weekly to verify proper operation. This equipment should be inspected annually to enure compliance with ANSI Z358.1. Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI/ISEA Z358.1. For questions regarding the operation or installation of this product, visit www.bradleycorp.com or call 800-BRADLEY (272.3539). Product warranties and parts information may also be found under Products on our web site at bradleycorp.com. Bradley 215-1856 Rev. B; ECN 17-05-043A 7/10/2017 3

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA TEL: 1-800-BRADLEY FAX: (262-251-5817) http://www.bradleycorp.com 114-052 R P.O. Box 309, Menomonee Falls, WI 53051 TEST THIS UNIT EACH WEEK DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN. ESSAI HEBDOMADAIRE Test-operate valve(s) each week and sign below. Report any malfunctions immediately. Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden. Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement. Date Signed Date Datum Unterschrift Date Date Signe Date Signed Signed Signed Installation Components Optional Shower Shroud and Retaining Nut Pull Rod 128-156G Plastic Showerhead Stainless Steel Showerhead Prepack S45-1535 Optional Foot Pedal Kit S45-572 or S45-1314SS16 Safety Sign (qty. 2) Emergency Tag Heat Trace Unit S19-304T (top supply) S19-304B (bottom supply) Supplies Required Hex Nut #10-24 (qty. 2) Screw #10-24 x 1/2" (qty. 2) Hook (qty. 2) (3) 3/8" floor anchors and bolts Teflon tape and pipe sealant 30 PSI (2.0 bar) min/90 PSI (6.1 bar) max flow pressure 125 PSI (8.6 bar) max static pressure Piping to 1-1/4" NPT water supply inlet (30-90 PSI/ 2.0-6.1 bar) Piping to 1-1/4" NPT drain outlet on unit (if included with unit) Adequate supply pipe supports Provisions to dispose of shower and eye or eye/face wash waste water (minimum 30 gallons/115 liters) should be made (minimum 4" (120mm) drain) Optional: sign-mounting hardware Optional: for extension cable option, pipe insulation and protective coating are required NOTICE! Bottom supply units have provisions for supporting the top of the unit. The 1-1/4" NPT solid pipe protruding from the shell must be used to support the unit. 4 7/10/2017 Bradley 215-1856 Rev. B; ECN 17-05-043A

Dimensions Junction Box 3/4" NPT Hub Top Supply 1-1/4" NPT Optional Signaling System 3/4" NPT Solid Mounting Stem 83-3/8" ( mm) 18-1/2" (470mm) 10-3/4" (273mm) 85-7/8" (2181mm) 93-7/8" (2384mm) 8-1/4" (210mm) 86-1/2" (2197mm) 66-1/8" (1680mm) 15-3/8" (391mm) 90-3/8" (2372mm) 30" (762mm) 58-9/16" (1488mm) 34-5/16" (872mm) Bottom Supply 1-1/4" NPT 6" (152mm) 1 Ø 9" (229mm) Flange with (3) Ø 3 8" (10mm) Holes on a Ø 8" (203mm) Bolt Circle Secure Unit to Floor 23-1/8" (587mm) 9-5/8" (245mm) 4-3/8" (111mm) NOTICE! Do not rely on the unit to support supply piping. A Install three suitable anchors (supplied by installer) for 3/8 bolts in the floor. B Bolt the base to the floor anchors using 3/8" bolts (supplied by installer) 3/8" bolts and anchors supplied by installer C Install the pull rod to the unit as shown. For optional foot pedal installation, the base must be positioned so that the hole in the base is perpendicular to the user. Bradley 215-1856 Rev. B; ECN 17-05-043A 7/10/2017 5

Installation 2 Connect Water Supply NOTICE! Unit requires a minimum 30 GPM to operate and a minimum 30 PSI of flowing water pressure. Preferred flowing water pressure is 40-60 PSI. Water supply to the unit must be freeze-protected (by others). NOTICE! Pipe size should be no smaller than 1-1/4" (supplied by installer). A Connect the water supply piping to the 1-1/4" NPT inlet on the unit, see dimensions (piping by installer). Use pipe hangers or other means to provide adequate supports for the supply pipe (supports by installer). B Open water supply lines and test for leaks and adequate water flow. NOTICE! In extreme cold weather, run water long enough to warm non-freeze protected components of the unit to allow proper drainage. 3 Assemble Components A Install the showerhead to the unit as shown. The bottom edge of the showerhead should be 85-7/8" (2181mm) from the floor. B Mount the safety signs to the wall or to the unit if desired. Use the screws, nuts and hooks provided to hang the signs back-to-back on the unit. C If optional foot pedal kit is ordered, attach foot pedal to Halo handle per foot pedal installation instructions. Use teflon tape only with plastic showerheads. Safety signs shown mounted back-to-back. Bottom supply units must use this pipe for supporting unit. ¾" NPT Junction Box opening 6 7/10/2017 Bradley 215-1856 Rev. B; ECN 17-05-043A

4 Connect Electrical Supply Average power consumption of the unit is.7 amp/80 watts at 120VAC (.40 amp/80 watts at 208 VAC or 0.35 amp/80 watts at 240 VAC) at 50 F (10 C) internal unit temperature. Unit ordered with extension cable: average power consumption of the unit is 1.1 amp/125 watts at 120 VAC (0.55 amp/125 watts at 240 VAC) at 50 F (10 C) internal unit temperature. Refer to the installation instructions provided with the signaling system for more information. A Connect the power to the junction box on the unit as shown in the schematic (junction box accepts 3/4" conduit fitting, supplied by installer). B Connect the optional industrial control panel signaling system and indicator lights. Assemble the stainless steel bracket (provided with the signaling system) onto the back of the signaling system. The hardware necessary for mounting the signaling system to the heat trace stem is also provided with signaling system. Refer to the appropriate option's installation guide for wiring diagram. C If optional extension cable is ordered with unit, it will need to be attached to the facilities pipe with fiberglass tape (included), insulated, and a protective coating applied (supplier provided). Supplier provided components are not covered under the unit's certification listing. Extension cable is pre-powered through the system. Signaling System Option (Ordered Separately) Indicator Light Option CAUTION Any electrical components supplied by installer must match the rating of the fixture to maintain its integrity. Heat trace cable protects the unit's plumbing from freezing down to -50 F(-46 C) when properly installed. Bradley 215-1856 Rev. B; ECN 17-05-043A 7/10/2017 7

Installation Wiring Diagrams Without Options With Options 8 7/10/2017 Bradley 215-1856 Rev. B; ECN 17-05-043A

Troubleshooting Problem Cause Solution Low water flow at drench shower and eyewash Low water flow at drench shower or eye wash Freeze-protection valve is flowing water Scald-protection valve is flowing water Insufficient pressure Undersized supply piping Debris in system Power supply is off [if the water temperature from the valve is below 40 F (4 C)] Water supply is too cold Defective thermostat [if the water temperature from the valve is below 40 F (4 C)] Defective freeze valve [if the water temperature from the valve is above 40 F (4 C)] Defective scald valve [if the water temperature from the valve is below 80 F (27 C)] Direct sunlight or high ambient temperature Minimum 30 GPM required Increase pressure/pipe size Disassemble the showerhead, clean and reassemble Unscrew the eyewash heads from the yoke, clean and reassemble. If still clogged, replace the heads. Turn the power on. Make sure the unit is supplied with tempered water. Check continuity and replace if check fails activates at 50 F (10 C) (factory-set). Replace the freeze valve NOTE: A water supply that is at least 40 F (4 C) or colder will hold the freeze bleed valve open. To close the valve: 1. turn the water off temporarily or plug the valve until the heat trace unit s heat warms the valve 2. increase the surface temperature of the valve to above 40 F (4 C) by immersing the valve in hot water IMPORTANT: Make sure that the heat trace unit is operating properly before plugging the freeze bleed valve. A plugged valve will not provide backup freeze protection should the heat trace unit fail. Replace the scald valve. Cool the unit. Defective thermostat Check continuity and replace if check fails activates at 50 F (10 C) (factory-set). Bradley 215-1856 Rev. B; ECN 17-05-043A 7/10/2017 9