Meade Street Bridge Design Alternative Study

Similar documents
About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Major Bike Routes 102 Avenue Workshop April 21, 2015

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Station 1: Street & Sidewalk Upgrades

Columbia Pike Implementation Team (CPIT) Meeting

TRANSPORTATION COMMISSION Agenda Staff Report

Derby Street. Project Updates. Salem, Massachusetts

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Committed to Service

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

COMMUNITY MEETING AGENDA

Welcome to the Quebec Alternatives Analysis Public Meeting

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

North Avenue Corridor Study

STONY PLAIN ROAD STREETSCAPE

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Glebe Neighbourhood Cycling Plan

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Bicycle Facilities Planning

Org Chart. Steering. Committee. Project Advisory. Committee. Nicole Losch, PTP Senior Transportation. Bryan Davis, AICP Senior Transportation

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Access Routes from US 101 to the Richmond San Rafael Bridge

122 Avenue: 107 Street to Fort Road

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

Dowling/Beaty Cycling Route

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Public Meeting #1 Comment Summary

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

Thank you for attending

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

City of Wilsonville 5 th Street to Kinsman Road Extension Project

WELCOME. City of Eden Prairie West 70 th Street

Transportation Planning Division

City of Davis East Covell Corridor Plan

Financial Project ID No(s).: and ETDM No(s).: and 14181

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Why invest in the 1 Street S.W. Corridor?

RiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

NEWMARKET UPHAM S CORNER

Planned Improvements from Sector & Area Plans that have been added to the MTP

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

Broad Street Bicycle Boulevard Design Guidelines

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

NJDOT Complete Streets Checklist

Bellevue Downtown Association Downtown Bike Series

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Cycle Track Design Best Practices Cycle Track Sections

City of Fairfax, Virginia City Council Work Session

Mainstreet Master Plan Land Use

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Las Tunas Downtown Revitalization City Council Study Session. December 1, :00 p.m. Live Oak Park Community Center

Working Group Meeting

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

BAC-PAC-LHA Joint Meeting July 11, PM

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Miami Health District

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Hale iwa Improvement District Project

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

Pennsylvania Avenue (CR 484) Design Alternatives Study

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

Road Diets FDOT Process

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

5. RUNNINGWAY GUIDELINES

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

Completing the Street: Denning Drive

ARLINGTON COUNTY, VIRGINIA

League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study. Second Public Meeting February 6, 2018

North Avenue Corridor Study

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Transcription:

Meade Street Bridge Design Alternative Study Preferred Alternative Presentation Stakeholder Meeting #3 June 23, 2011 Presented by: Dan Biggs, RLA

Meeting Agenda Purpose: 1. Review Meeting #2 Feedback 2. Present Preferred Alternative 3. Review Corridor of Light (Cliff Garten) 4. Discuss Next Steps

Project Process Information Gathering/ Field Review/ Preliminary Analysis Stakeholder Input #1 Concept Alternatives Development Stakeholder Input Session #2 Concept Alternatives Review / Selection Stakeholder Information Session #3 Final Concept Design

Project Goal & Objectives Goal: to improve Bicycle and Pedestrian access and the user s experience along North Meade Street between Rosslyn and the Iwo Jima Memorial. Objectives: Improving non-motorized access and user safety along corridor (RAFOM #27, 27). Minimize vehicle and pedestrian conflict points (RAFOM #26). Improve streetscape character of corridor (RAFOM #32, 42). Improve bicycle, pedestrian, and motor vehicle wayfinding along corridor (RAFOM #26). Maintain acceptable levels of service for all transportation modes (Bicycle, Pedestrian, Motor Vehicles & Transit).

Study Area

Concept Alternatives Alternative A (Spot Improvements) Alternative B (Moderate Improvements) Alternative C (Complete Improvements)

Summary of Feedback Meeting #2 General Comments YES - Left Turn Pocket - Curb Extensions - Directional Signage - Public Art - Bridge Fencing/Railing - Crosswalks - Signals - Bike Lanes - New/Rehabilitated Bridge Alternative A (Spot Improvements) Retains Existing Roadway Configuration MAYBE - Street Trees - Tree Grates - Ornamental Bridge Fencing - Eliminate Contra Flow Lane Alternatives Summary Alternative B (Moderate) Greater Bike/Ped Access Through Corridor Aesthetic Treatment/ Rehabilitate Existing Bridge NO -Sidewalk Buffer Pavers - Wayfinding (Crystal City) - Street Lighting Alternative C (Complete) Greatest Improvement of Access within Corridor New Bridge

Summary of Feedback Meeting #2 General Comments YES - Left Turn Pocket - Curb Extensions - Directional Signage - Public Art - Bridge Fencing/Railing - Crosswalks - Signals - Bike Lanes - New/Rehabilitated Bridge Alternative A (Spot Improvements) Retains Existing Roadway Configuration MAYBE - Street Trees - Tree Grates - Ornamental Bridge Fencing - Eliminate Contra Flow Lane Alternatives Summary Alternative B (Moderate) Greater Bike/Ped Access Through Corridor Aesthetic Treatment/ Rehabilitate Existing Bridge NO -Sidewalk Buffer Pavers - Wayfinding (Crystal City) - Street Lighting Alternative C (Complete) Greatest Improvement of Access within Corridor New Bridge

Preferred Alternative Features: Rehabilitated Bridge (reconfigured lanes) Traffic Signals Colored Bike Lanes Left Turn Pocket Widened Sidewalks (10 width)

Meade Street - North of Marshall Dr

Meade Street - North of 14 th St N.

Meade Street Bridge (EB Ramp)

Meade Street Bridge (WB Ramp)

CURB North Fort Myer Drive

Preferred Alternative Features: Rehabilitated Bridge (reconfigured lanes) Traffic Signals Colored Bike Lanes Left Turn Pocket Widened Sidewalks (10 width)

Thank You Schedule: Daniel Biggs, RLA Toole Design Group, LLC DBiggs@tooledesign.com Open House (part I) 6:30 7:00 Intro/Presentation 7:00 7:30 Open House (part II) 7:30 9:00 David Goodman, RA, AICP Arlington County Department of Environmental Services DGoodman@arlingtonva.us Next: Design Team & County to Finalize Preferred Concept Initiate Reviews with Additional Stakeholders Project Website http://tinyurl.com/meadestreet

Concept A (Spot Improv) Concept B (Moderate Improv) Meade Street (south of 14 th St.) Retains Existing Config Sharrows No Left Turn Pocket Retains Parking (Marathon Staging) Bike Lanes Left Turn Pocket Concept Alternatives Comparison Matrix US-50 EB Off-Ramp/ Arlington Blvd. Service Road Int. Signalized A.1: Signalized 2030 LOS B (B) [A] A.2: No Signal 2030 LOS F (F) [D] 2030 LOS B (B) [A] B.1 Intersect. Config. B.2 Meade Street Bridge (Luminous Bodies Applies to all Concepts) Minimal Modifications Moderate Cost Lane Configuration Moderate Cost Lane Configuration Signalized US-50 WB On/Off-Ramps Int. (realign. of Off-Ramp applies to all Concepts) Retains Existing WB On- Ramp Config. B.1 B.2 A.1 Signalized 2030 LOS C (B) [C] A.2 No Signal 2030 LOS F (F) [F] Intersect. Config No NB Left Turn Lane to US-50 WB On-Ramp 2030 LOS D (B) [B] Intersect. Config NB Left Turn Lane to US-50 WB On-Ramp 2030 LOS C (B) [B] N. Fairfax Dr. Intersections Retain Contra -flow Lane 2030 LOS D (C) [C] Contraflow Lane Removed Sharrows 2030 LOS D (C) [B] Retain Sidewalk along N. Lynn Street Concept C (Complete Improv) Removes Parking (Marathon Staging) Bike Lanes Left Turn Pocket Signalized Traffic LOS F (B) [B] C.1 Intersect. Config C.2 New Bridge (Cost) ~$700k+ Parallel Pedestrian Bridges ~$400k (Future impr. to ex. Bridge) Signalized Intersection Configuration 2030 LOS C (B) [B} Contraflow Lane Removed Bike Lanes 2030 LOS D (C) [B] Widened Sidewalk along N. Lynn St