CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

Similar documents
PROPOSAL. PROPOSAL OF, a corporation a

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

WEEKLY CONSTRUCTION REPORT

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

Kansas Department of Transportation. Tabulation of Bids

GENERAL LEGEND 12"CMP

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

CONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

CITY OF ROSEVILLE DESIGN STANDARDS

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

S TREET (TO DADE ) BE IMPROVED. 96.3' - -, I I i---- , so. a - - r- - r - so. o, LOT 1 LOT 2 POND T.O.B (() I 100.0' I I LOT 3 !

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council

Engineering Design Criteria & Standard Drawings

Northside School Class I Bike Path, Cool, CA Application Attachments

Riverside County Transportation Department Summary of Bids

Lake Waterford Community Association Meeting. November 15, 2016

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

SECTION 3 STREET DESIGN

TYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Span-Wire Intersections Study SPAN-WIRE INTERSECTIONS STUDY. City of Naples Streets & Stormwater Department 1

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

ST. MARY S COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION MANUAL OF DESIGN AND CONSTRUCTION STANDARDS TABLE OF CONTENTS

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Lecture 10 : Sewer Appurtenances

CONCEPT STUDY. Kasold Drive Improvements (6th Street to Bob Billings Parkway) Lawrence, Kansas PREPARED FOR

MEMORANDUM. DATE: October 6, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report

Tabulation of Bids. Counties:

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

CITY OF SOUTH DAYTONA

Driveway Design Criteria

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology


OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

Hydrant Flow Testing for Hydraulic Model Calibration. Doug Lane, PE City of Bellevue, WA

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE. Golf Course Master Plan Implementation. Date: December 1, 2016

Watermain Replacement and Connection Procedure

Building Great Neighbourhoods BONNIE DOON

Route 1 and Harrison Road Intersection Improvements

Design Guide. Table of Contents

Derby Street. Project Updates. Salem, Massachusetts

Access requests to County streets and roadways are processed through one of the following methods:

Watermain Replacement and Connection Procedure

Watermain Replacement and Connection Procedure

TABLE OF CONTENTS LIST OF PHOTOGRAPHS EXHIBIT 1 LOCATION MAP... 2 LIST OF TABLES

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE AGENDA Tuesday, October 11, :30 PM Conference Room A

TRANSPORTATION & INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Funding Application. Project Information. Contact Information. Project Description. 1 of 7. September 20th, :45 PM

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

The Use and Performance of Geogrids in Kentucky

SECTION PRESSURE TESTING OF PIPING

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

APPENDIX G: DETAILED COST ESTIMATES

Project Update May 2018

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Tabulation of Bids. Counties: Project(s):

ENGINEERING FIRM OF RECORD COMPANY REPRESENTATIVE PROJECT MANAGER AND ENGINEERING LEAD INDIAN HILL SENIOR LIFESTYLE CENTER YONKERS, NY

Preparing a Curb Ramp Project. December 15, 2010

BID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

CY2017 Summary of STP applications


FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

Inspector MUST Sign and Date Each Inspection

City of Columbia Engineering Regulations Manual

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

City Avenue Projects

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

SECTION 14: LANDSCAPING AND BEAUTIFICATION

Warsaw, Missouri Main Street Complete Streets Preliminary Engineering Report

Name Roads Station Distance Miles

OneBayArea Grant Application

Item No. 14 Town of Atherton

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

City Avenue Projects

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Developing a Portwide Asset Management Program

R-3501-E2 R-3501-H4. R-3501-HL Mountable Curb Frame, Grate

SECTION 5: PEER CITY REVIEW

EQUIPMENT AND MATERIALS

FINAL SCOPING REPORT. Bennington Streetscape Improvement Project BENNINGTON STP SDWK (12) August Bennington County Regional Commission

Tabulation of Bids. Counties:

Construction Newsletter No. 32 October 14, 2016 On-Going

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

22. Specialty Valves.

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Vehicular turning and path of travel with a proposed curb bulb on the southwest corner of Mount Diablo Boulevard and Dewing Avenue.

WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828

PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT

DIVISION 2200 STREETS

Transcription:

46th Street Reconstruction North of 28th Avenue to 29th Avenue 29th Avenue Reconstruction 46th Street to 47th Avenue Court 47th Street Court Reconstruction 29th Avenue to Cul-de-sac CITY OF ROCK ISLAND Job Number ENGINEERING DIVISION Computer Drawing Name 46th Street, 29th Avenue, & 47th Street Ct Reconstruction 2540 Date 11-22-2010 By mdw Sheet 2 2540typsec Of 14

QUANTITIES & LEGEND 46th Street, 29th Avenue, & 47th Street Court Reconstruction 2540 Dec. 10, 2010 mdw 3 14

1 Earth Excavation 12 Valve Box To Be Adjusted 27 Fire Hydrant No. Location No. Location Quantity Unit No. Location Quantity Unit From To Quantity Unit 1 5+20.7, 9' Lt 1 Each 1 2+51.3, 27.6' Rt 1 Each 1 1+84.86 CL 10+91.7, 24' Rt 695.5 C.Y. 2 7+88.8, 16.4' Lt 1 Each 2 5+25.9, 18.9' Lt 1 Each 695.5 C.Y. 2 Each 3 10+67.9, 21.9' Lt 1 Each 3 Each 2 Geotechnical Fabric for Ground Stabilization 13 Domestic Water Service Valve Box To Be Adjusted No. Location No. Location Quantity Unit 28 Valve Box to Be Removed From To Quantity Unit 1 5+53.1, 17.6' Rt 1 Each No. Location Quantity Unit 1 1+84.86 CL 10+91.7, 24' Rt 3,035.3 S.Y. 2 10+33, 70.8' Rt 1 Each 1 2+48, 27.6' Rt 1 Each 3,035.3 S.Y. 3 10+85.7, 11.7' Lt 1 Each 2 5+22.4, 17.2' Lt 1 Each 4 11+01, 18.5' Rt 1 Each 3 7+88.8, 16.4' Lt 1 Each 3 Aggregate Base Course, Type A 4 Each 4 10+65.4, 22.3' Lt 1 Each No. Location 4 Each From To Quantity Unit 14 Catch Basin, Double 1 1+84.86 CL 10+91.7, 24' Rt 1,136.1 Ton No. Location Quantity Unit 29 Gate Valve And Box, 6" 1,136.1 Ton 1 8+74, 12.5' Lt 1 Each No. Location Quantity Unit 2 8+74, 12.5' Rt 1 Each 1 2+43.7, 7.5' Lt 1 Each 4 Pavement Removal 2 Each 2 2+48.1, 27.6' Rt 1 Each No. Location 3 5+14.8, 3.3' Rt 1 Each From To Quantity Unit 15 Catch Basin, Single 4 10+67.9, 2.5' Rt 1 Each 1 1+84.86 CL 10+91.7, 24' Rt 3,035.3 S.Y. No. Location Quantity Unit 4 Each 3,035.3 S.Y. 1 5+38.4, 12.5' Lt 1 Each 2 5+37.4, 12.5' Rt 1 Each 30 Watermain, 6" 5 PCC Pavement, With Integral Curb, 7" 2 Each No. Location Quantity Unit No. Location From To From To Quantity Unit 16 Removing Catch Basin to Maintain Flow 1 2+44.7, 27.6' Rt 2+51.3, 27.6' Rt 6.5 Ft 1 1+84.86 CL 10+91.7, 24' Rt 3,035.3 S.Y. No. Location Quantity Unit 2 5+18.4, 9.5' Lt 5+25.9, 18.9' Lt 12.0 Ft 3,035.3 S.Y. 1 5+38.4, 12.5' Lt 1 Each 3 10+65, 21.6' Lt 10+67.9, 21.9' Rt 3.0 Ft 2 5+37.4, 12.5' Rt 1 Each 21.5 Ft 6 Driveway Pavement Removal 3 8+74, 12.5' Lt 1 Each No. Location 4 8+74, 12.56' Rt 1 Each From To Quantity Unit 4 Each 1 1+83, 12.5' Lt 1+99.5, 12.5' Lt 22.8 S.Y. 2 2+36.2, 12.5' Lt 2+52.8, 12.5' Lt 23.5 S.Y. 17 Trench Backfill 3 2+74.4, 12.5' Lt 3+01.5, 12.5' Lt 36.6 S.Y. No. Location Quantity Unit 31 Sodding 4 3+57.9, 12.5' Lt 3+76.9, 12.5' Lt 29.8 S.Y. From To No. Location Quantity Unit 5 3+72.9, 12.5' Rt 3+99.6, 12.5' Rt 35.9 S.Y. 1 5+18.4, 9.5' Lt 5+28.7, 20.6'' Lt 6.7 CY From To 6 5+19, 12.5' Rt 5+34.1, 12.5' Rt 24.3 S.Y. 2 5+38.4, 12.5' Lt 5+37.4, 12.5' Rt 3.7 CY 1 1+80, 19.5' Lt 1+85.5, 19.5' Lt 1.8 S.Y. 7 5+53.3, 12.5' Rt 5+68.9, 12.5' Rt 11.1 S.Y. 3 8+74, 12.5' Lt 8+74, 12.5' Rt 11.7 CY 2 1+84.86, 12.5' Rt 2+17, 51.7' Rt 68.8 S.Y. 8 6+17.1, 12.5' Lt 6+46.9, 12.5' Lt 31.5 S.Y. 4 10+65, 21.6' Lt 10+67.9, 21.9' Lt 1.7 CY 3 1+97.5, 19.7' Lt 2+19.8, 19.7' Lt 21.3 S.Y. 9 6+66, 12.5' Rt 6+85.7, 12.5' Rt 15.7 S.Y. 23.8 CY 4 2+23.8, 19.7' Lt 2+38.4, 19.7' Lt 14.1 S.Y. 10 7+46, 12.5' Rt 7+59.7, 12.5' Rt 22.9 S.Y. 5 2+42.1, 50.1' Rt 3+72.9, 12.5' Rt 227.9 S.Y. 11 8+10.8, 12.5' Lt 8+36.6, 12.5' Lt 34.6 S.Y. 18 Storm Sewer Removal 6 2+50.9, 19.7' Lt 2+78.1, 19.4' Lt 26.2 S.Y. 12 8+38.5, 12.5' Rt 8+64, 12.5' Rt 35.1 S.Y. No. Location Quantity Unit 7 2+97.4, 19.6' Lt 3+56, 19.5' Lt 60.5 S.Y. 13 9+06.2, 12.5' Rt 9+30.2, 12.5' Rt 26.8 S.Y. From To 8 3+01.4, 12.5' Lt 3+58, 12.5' Lt 18.7 S.Y. 14 9+09.2, 12.5' Lt 9+30.1, 12.5' Lt 25.2 S.Y. 1 5+38.4, 12.5' Lt 5+37.4, 12.5' Rt 21.0 Ft 9 3+77, 19.3' Lt 4+62.3, 19' Lt 86.1 S.Y. 15 9+42.7, 12.5' RT 9+66.2, 12.5' Rt 29.1 S.Y. 2 8+74, 12.5' Lt 8+74, 12.56' Rt 21.0 Ft 10 3+79, 12.5' Lt 4+61.6, 12.5' Lt 25.3 S.Y. 16 9+56.5, 12.5' Lt 9+76.6, 12.5' Lt 26.6 S.Y. 42.0 Ft 11 3+99.7, 12.5' Rt 5+19.1, 12.5' Rt 206.1 S.Y. 17 10+17.6, 45.7' Rt 10+37.5, 62.5' Rt 25.9 S.Y. 12 4+65.6, 12.5' Lt 6+17.1, 12.' Lt 167.2 S.Y. 18 10+43.9, 14.6' Lt 10+64.7, 13.2' Lt 20.3 S.Y. 19 Storm Sewer, 12" 13 5+34.1, 12.5' Rt 5+53.3, 12.5' Rt 25.2 S.Y. 19 10+67.5, 11.9' Lt 10+81.3, 2' Lt 19.6 S.Y. No. Location Quantity Unit 14 5+66.9, 12.5' Rt 6+66, 12.5' Rt 46.6 S.Y. 20 10+73.5, 58.9' Rt 10+86.4, 44.9' Rt 21.0 S.Y. From To 15 6+46.9, 12.5' Lt 6+98.7, 12.5' Lt 74.7 S.Y. 21 10+86.9, 6.2' Rt 10+91.7, 26.9' Rt 21.2 S.Y. 1 5+38.4, 12.5' Lt 5+37.4, 12.5' Rt 21.0 Ft 16 6+85.7, 12.5' Rt 7+45.9, 12.5' Rt 55.6 S.Y. 539.5 S.Y. 21.0 Ft 17 7+01.7,12.5' Lt 8+10.8, 12.5' Lt 111.4 S.Y. 18 7+59.7, 12.5' Rt 8+38.5, 12.5' Rt 167.8 S.Y. 7 P.C.C. Driveway Pavement, 6" 20 Storm Sewer, 15" 19 8+36.6, 12.5' Lt 9+09.2, 12.5' Lt 101.5 S.Y. No. Location No. Location Quantity Unit 20 8+64.1, 12.5' Rt 9+06.2, 12.5' Rt 60.7 S.Y. From To Quantity Unit From To 21 9+30.1, 12.5' Rt 9+42.2, 12.5' Rt 21.3 S.Y. 1 1+83, 12.5' Lt 1+99.5, 12.5' Lt 22.9 S.Y. 1 8+74, 12.5' Lt 8+74, 12.56' Rt 21.0 Ft 22 9+30.1, 12.5' Lt 9+56.5, 12.5' Lt 38.5 S.Y. 2 2+36.2, 12.5' Lt 2+52.8, 12.5' Lt 23.5 S.Y. 21.0 Ft 23 9+66.2, 12.5' Rt 10+17.6, 45.7' Rt 92.6 S.Y. 3 2+74.4, 12.5' Lt 3+01.5, 12.5' Lt 27.7 S.Y. 24 9+78.6, 12.5' Lt 10+43.9, 14.6' Lt 93.2 S.Y. 4 3+57.9, 12.5' Lt 3+76.9, 12.5' Lt 31.3 S.Y. 21 Inlet and Pipe Protection 25 10+37.5, 62.5' Rt 10+73.3, 58.7' Rt 46.9 S.Y. 5 3+72.9, 12.5' Rt 3+99.6, 12.5' Rt 35.9 S.Y. No. Location Quantity Unit 26 10+64.7, 13' Lt 10+67.5, 11.9' Lt 5.1 S.Y. 6 5+53.3, 12.5' Rt 5+68.9, 12.5' Rt 11.5 S.Y. 1 2+18.6, 204.3' Rt 1 Each 27 10+81.4, 2.1' Lt 10+87.1, 6.2' Rt 16.4 S.Y. 7 6+17.1, 12.5' Lt 6+46.9, 12.5' Lt 35.7 S.Y. 2 2+41, 206' Rt 1 Each 28 10+86.3, 44.8' Rt 10+91.7, 26.9' Rt 27.5 S.Y. 8 6+66, 12.5' Rt 6+85.7, 12.5' Rt 15.7 S.Y. 3 5+37.3, 12.8' Lt 1 Each 1,909.0 S.Y. 9 7+46, 12.5' Rt 7+59.7, 12.5' Rt 23.1 S.Y. 4 5+36.8, 12.5' Rt 1 Each 10 8+10.8, 12.5' Lt 8+36.6, 12.5' Lt 34.6 S.Y. 5 8+74.5, 12.5' Lt 1 Each 32 Project Sign 11 8+38.5, 12.5' Rt 8+64, 12.5' Rt 35.1 S.Y. 6 8+74.5, 12.5' Rt 1 Each No. Location Quantity Unit 12 9+06.2, 12.5' Rt 9+30.2, 12.5' Rt 29.2 S.Y. 6 Each 1 1 Each 13 9+09.2, 12.5' Lt 9+30.1, 12.5' Lt 26.5 S.Y. 1 Each 14 9+42.7, 12.5' RT 9+66.2, 12.5' Rt 29.1 S.Y. 22 Perforated Corrugated PE Pipe Underdrain, 4" 15 9+56.5, 12.5' Lt 9+76.6, 12.5' Lt 27.1 S.Y. No. Location Quantity Unit 33 Traffic Control and Protection 16 10+17.6, 45.7' Rt 10+37.5, 62.5' Rt 25.9 S.Y. From To No. Location Quantity Unit 17 10+43.9, 14.6' Lt 10+64.7, 13.2' Lt 21.3 S.Y. 1 1+87, 11' Lt 5+36, 11' Lt 340.0 Ft. 1 1 L.S. 18 10+67.5, 11.9' Lt 10+81.3, 2' Lt 19.6 S.Y. 2 1+87, 11' Rt 5+36, 11' Rt 359.0 Ft. 19 10+73.5, 58.9' Rt 10+86.4, 44.9' Rt 21.0 S.Y. 3 2+23.5, 11' Rt 2+23.5, 46' Rt 35.0 Ft. 20 10+86.9, 6.2' Rt 10+91.7, 26.9' Rt 21.8 S.Y. 4 2+35.5, 11' Rt 2+35.5, 46' Rt 35.0 Ft. 518.5 S.Y. 5 5+40.5, 11' Lt 5+96.5, 11' Lt 49.5 Ft. 6 5+38.5, 11' Rt 5+96.5, 11' Rt 65.0 Ft. 8 P.C.C. Driveway Pavement, Exposed Aggregate, 6" 7 5+96.5, 11' Lt 8+70.8, 11' Lt 257.0 Ft. No. Location 8 5+96.5, 11' Rt 8+70.6, 11' Rt 291.5 Ft. From To Quantity Unit 9 8+77.5, 11' Lt 10+90.1, 21.5' Rt 231.5 Ft. 1 5+19, 12.5' Rt 5+34.1, 12.5' Rt 24.3 S.Y. 10 8+77.5, 11' Rt 10+90.1, 21.5' Rt 263.0 Ft. 24.3 S.Y. 1,926.5 Ft. 9 Brick Driveway Pavement 23 Removing Manhole, to Maintain Flow No. Location No. Location Quantity Unit From To Quantity Unit 1 2+09.5, 18.2' Rt 1 Each 1 2+74.4, 12.5' Lt 3+01.5, 12.5' Lt 8.9 S.Y. 2 2+43.7, 7.5' Lt 1 Each 8.9 S.Y. 2 Each 10 Sidewalk Removal 24 Manhole, Type 1 with Closed Lid, 4' Dia. No. Location No. Location Quantity Unit From To Quantity Unit 1 2+09.5, 18.2' Rt 1 Each 1 1+82, 12.5' Lt 1+83.2, 12.5' Lt 16.5 S.F. 1 Each 2 1+99.6, 12.5' Lt 2+36.3, 12.5' Lt 276.3 S.F. 3 2+52.9, 12.5' Lt 2+74.4, 12.5' Lt 185.6 S.F. 25 Manhole, to Be Adjusted 4 2+99.8, 15.6' Lt 3+58.8, 15.5' Lt 247.8 S.F. No. Location Quantity Unit 5 3+78.2, 15.3' Lt 5+15.9, 14.4' Lt 573.9 S.F. 1 2+10.3, 21.4' Lt 1 Each 6 6+98.7, 12.5' Lt 7+01.7, 12.5' Lt 35.7 S.F. 2 2+10.3, 21.4' Lt 1 Each 1,335.8 S.F. 3 4+90, 19.3' Lt 1 Each 4 10+95, 17.8' Rt 1 Each 11 P.C.C. Sidewalk, 4" 4 Each No. Location From To Quantity 26 Fire Hydrant to Be Removed 1 1+82, 12.5' Lt 1+83.2, 12.5' Lt 16.5 S.F. No. Location Quantity Unit 2 1+99.6, 12.5' Lt 2+36.3, 12.5' Lt 271.5 S.F. 1 2+51.3, 27.6' Rt 1 Each 3 2+52.9, 12.5' Lt 2+74.4, 12.5' Lt 170.5 S.F. 2 5+25.9, 18.9' Lt 1 Each 4 2+99.8, 15.6' Lt 3+58.8, 15.5' Lt 243.2 S.F. 3 10+67.9, 21.9' Lt 1 Each 5 3+78.2, 15.3' Lt 5+15.9, 14.4' Lt 565.6 S.F. 3 Each 6 6+98.7, 12.5' Lt 7+01.7, 12.5' Lt 35.7 S.F. 1,303.0 S.F. CITY OF ROCK ISLAND ENGINEERING DIVISION 46th Street, 29th Avenue, & 47th Street Court Reconstruction Job Number Date: 1/3/2011 2540 By: mdw Sheet 4 Computer Drawing Name 2540 Schedule of Quantities.xls Of 14

46th Street SCALE: 1"=20'

47th Street SCALE: 1"=20'

47th Street Court SCALE: 1"=20'

SCALE: 1"=10'

SCALE: 1"=10'