District Construction Projects

Similar documents
ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

Lake Waterford Community Association Meeting. November 15, 2016

CY2017 Summary of STP applications

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

Highway Construction

APPENDIX L: COST ESTIMATING TOOLS

FDOT Treasure Coast Traffic Report

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

Culpeper District. Albemarle County Monthly Report October, 2011

FDOT Treasure Coast Traffic Report

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

New Mexico Transportation Funding Challenges

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

MIAMI & ERIE CANAL SHARED USE TRAIL

APPENDIX E Activity Defect Assignment

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

Culpeper District. Albemarle County Monthly Report September, 2011

information, please contact the District 9 Offices at or

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

Design Criteria. Design Criteria

CTH M HIGHWAY PROJECT CTH Q to STH 113

Cincinnati Dayton Rd Widening

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Hospital Link Project Project Update November 2017

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

DISTRICT CONSTRUCTION PROGRAM

Hospital Link Project Project Update September 2017

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

FDOT Treasure Coast Traffic Impact Report

News Release Eastern Oregon Region 5

Gerald P. Oliveto, P.E. George Franz NJDOT

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

El Dorado County / Tahoe Roadwork Schedule

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

FDOT Treasure Coast Traffic Impact Report

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FDOT Treasure Coast Traffic Impact Report

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

2017 Temporary traffic control guidelines for pedestrians. v.2

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Building Great Neighbourhoods QUEEN ALEXANDRA

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Existing conditions of each bridge and repair plan are presented in Table

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

CITY OF SOUTH DAYTONA

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:

Roadway Design Manual

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Street Improvements in the area of New Street and Drury Lane

Legislative Update Williamsburg Residency

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Paul Vraney Bureau of Project Development 02/11/2016

Building Great Neighbourhoods BONNIE DOON

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River

Rio Intersection Traffic Restrictions Begin Monday

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

SECTION 14: LANDSCAPING AND BEAUTIFICATION

Transportation and General Civil Engineering Projects

2018 ROAD MAINTENANCE PROGRAM

INDEX. Geometric Design Guide for Canadian Roads INDEX

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

Building Great Neighbourhoods LANSDOWNE

Chapter 4: Funding and Implementation

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

Kentucky Highway District 7

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

2040 Long Range Plan Projects Draft October 2011

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Building Great Neighbourhoods STRATHEARN

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM

CITY OF LANCASTER PROPOSED NEW PROJECTS

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

Update January 4, 2016

Downtown Redevelopment Project Update

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

Transcription:

District 7 2014 Construction Projects

Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage Trail AUG-VAR AUG-VAR AUG-66-12.50 AUG-VAR AUG-High Street AUG-219-3.12 1. AUG-116/197-8.22/5.10 9. AUG-219-3.12 AUG-M&E Trail 2. AUG-65-13.19 10. AUG-M&E Trail 3. AUG-196-4.15 11. AUG/MER/SHE-VAR-VAR 4. AUG-67-3.45 AUG/MER/SHE-VAR/VAR 5. 6. 7. AUG-VAR AUG-Heritage Trail AUG-66-12.50 County Manager: Ted Hemleben Ph.: (419)-738-4214 8. AUG-High Street

Auglaize County 1.) State Route 116 & State Route 197 2.) State Route 65 AUG-116/197/8.22/5.10, PID 93189 AUG-65-13.19, PID 93769 Remove and replace existing overlays with new latex modified concrete. Reface abutments using anodes, and place pier piling encasements on all piles. AUG-116-0822 & AUG-197-0510 Traffic Detoured Br. No. AUG-65-01319 Traffic Maintained Estimated Cost: $739,182 Estimated Cost: $81,649 Award Date: 4/7/2014 Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 10/31/2014 Estimated Completion Date 8/15/2014 3.) State Route 196 4.) State Route 67 AUG-196-4.15, PID 96234 AUG-67-3.45, PID 79559 Placement of 3" of asphalt concrete. Project will be following a reconstruction project being performed by the Village of Waynesfield. S.R. 67 to Karen St. Traffic Maintained Replace bridge deck, repair and paint structural steel, and rehabilitate substructures. Br. No. AUG-67-0345 Traffic Maintained Estimated Cost: $141,793 Estimated Cost: $3,418,271 Award Date: 8/4/2014 Award Date: Awarded Tentative Start Date Sept. 2014 Tentative Start Date Under Construction Estimated Completion Date 10/31/2014 Estimated Completion Date 9/30/2014

Auglaize County 5.) Auglaize County 6.) Auglaize County AUG-VAR-Bridges, PID 88799 AUG-Heritage Trail Park District, PID 92413 Seal bridge deck with SRS, and paint existing structural steel. Clearing, grubbing, and constructing an aggregate drive and parking lot. Various bridges within the county Dr. Elizabeth Yahl-Kuffner Nature Preserve Short duration closures Estimated Cost: $1,958,860 Estimated Cost: $25,153 Award Date: AWARDED Award Date: 3/24/2014 Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 8/31/2014 Estimated Completion Date 7/31/2014 7.) State Route 66 8.) City of St. Marys AUG-66-12.50, PID 94726 AUG-High Street Bridges, PID 83122 Roadway widening, radius improvement, and relocation of signal strain poles. S.R. 66 at McKinley Road Traffic Maintained Remove and replace and existing 2 span bridge over the Miami and Erie Canal. Remove an existing bridge over the Upper Mill Race and replace w/ 66" culvert. High Street in the City of St. Marys Traffic detoured on local streets; all drives maintained Estimated Cost: $200,684 Estimated Cost: $1,297,441 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date 9/9/2013 Estimated Completion Date 9/30/2014 Estimated Completion Date 7/15/2014

Auglaize County 9.) State Route 219 10.) Auglaize County AUG-219-3.12, PID 93258 AUG-Miami & Erie Shared Use Trail, PID 92549 Remove and replace existing overlay, reface abutments, repair deck edges, & encase pier piling. Br. No. AUG-219-0312 Traffic Detoured Construction of new pedestiran, bicycle and handicap trail, extending from down town to the north side of the Village of New Bremen. Lockkeeper's House to Lock 2 Rd. Traffic Maintained Estimated Cost: $271,766 Estimated Cost: $548,937 Award Date: 3/24/2014 Award Date: 5/5/2014 Tentative Start Date May 2014 Tentative Start Date June 2014 Estimated Completion Date 7/31/2014 Estimated Completion Date 11/15/2014 11.) State Route 119 AUG/MER/SHE-VAR-VAR, PID 93464 Remove existing asphalt wearing surface and overlay with Micro Silica modified concrete. Br. No. AUG-119-0616 Traffic Detoured Estimated Cost: $653,938 Award Date: Awarded Tentative Start Date May 2014 Estimated Completion Date 7/31/2014

Ohio Department of Transportation District 7 Champaign County Projects 2014 CHP-245/VAR-20.05/VAR CHP/LOG-245/559-21.61/3.52 CHP-36/559-VAR CHP-36/559-VAR CHP-68-5.10/7.17 CHP-68-3.45 1. 2. 3. 4. 5. CHP/LOG-245/559-21.61/3.52 CHP-245/VAR-20.05/VAR CHP-36/559-VAR CHP-68-5.10/7.17 CHP-68-3.45 County Manager: Shawn Anverse Ph.: (937)-653-614

Champaign County 1.) State Route 245 2.) State Route 245 CHP/LOG-245/559-21.61/3.52, PID 83910 CHP-245/VAR-20.05/VAR, PID 92545 Resurface the existing roadway. Repair of curb & gutter, sidewalk, tree lawn, and other roadway related items. N. Lewisburg E. Corp. Limit to County Line S.R. 245 within the Village of N. Lewisburg Traffic maintained Estimated Cost: $268,710 Estimated Cost: $435,766 Award Date: 5/5/2014 Award Date: 7/21/2014 Tentative Start Date June 2014 Tentative Start Date Aug. 2014 Estimated Completion Date 10/15/2014 Estimated Completion Date 11/1/2014 3.) U.S. Route 36 & State Route 559 4.) U.S. Route 68 CHP-36/559-VAR, PID 93398 CHP-68-5.10/7.17, PID 91177 Field pave invert of steel culverts with concrete Milling the existing roadway and resurfacing with asphalt concrete. Vaious locations Various locations within the City of Urbana Estimated Cost: $122,919 Estimated Cost: $553,649 Award Date: 5/5/2014 Award Date: 5/5/2014 Tentative Start Date June 2014 Tentative Start Date June 2014 Estimated Completion Date 9/30/2014 Estimated Completion Date 8/31/2014

Champaign County 5.) U.S. Route 68 CHP-68-3.45, PID94564 Construct a left turn lane at the intersection of Hickory Grove. Intersection of U.S. 68 & Hickory Grove Part witdth construction Estimated Cost: $597,345 Award Date: 6/16/2014 Tentative Start Date July 2014 Estimated Completion Date 9/30/2014

Ohio Department of Transportation District 7 Clark County Projects 2014 CLA-41/235-30.79/8.65 CLA-334-0.62/0.86 CLA-235-2.56 CLA-George Rogers Clark Park CLA-68-VAR CLA-70/675-0.51/0.00 CLA-70-6.69 1. 2. 3. 4. 5. 6. 7. CLA-41/235-30.79/8.65 CLA-334-0.62/0.86 CLA-235-2.56 CLA-George Rogers Clark Park CLA-68-VAR CLA-70/675-0.51/0.00 CLA-70-6.69 County Manager: Shawn Anverse Ph.: (937)-653-4614

Clark County 1.) State Route 41 & State Route 235 2.) State Route 334 CLA-41/235-30.79/8.65, PID 94639 CLA-334-0.62/0.86, PID 88779 Intersection improvement by constructing a roundabout Intersection of S.R. 41 & S.R. 235 Replace or rehabilitate deteriorated backwalls/expansion joints/approach slabs. Br. No. CLA-334-0062 & CLA-334-0086 Traffic Maintained Traffic shall be maintained at all times. Estimated Cost: $1,147,621 Estimated Cost: $1,768,063 Award Date: 4/21/2014 Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date July 2013 Estimated Completion Date 9/15/2014 Estimated Completion Date 5/30/2014 3.) State Route 235 4.) Clark County CLA-235-2.56, PID 88392 CLA-George Rogers Clark Park, PID 92414 Replace the existing structure. Perform pavement repairs and resurface the existing parking area with asphalt concrete Br. No. CLA-235-0256 George Rogers Clark Park Traffic maintained; Temporary signal Traffic shall be maintained at all times. Estimated Cost: $681,096 Estimated Cost: $58,500 Award Date: Awarded Award Date: 6/2/2014 Tentative Start Date May 2014 Tentative Start Date July 2014 Estimated Completion Date 8/31/2014 Estimated Completion Date 8/31/2014

Clark County 5.) U.S. Route 68 6.) Interstate 70 & Interstate 675 CLA-68-VAR, PID 93448 CLA-70/675-0.51/0.00, PID 75316 Project to paint the structural steel on various bridges along U.S. 68. Various Bridges Traffic Maintained Mill and resurface the existing roadway, and other roadway related items. I-70 - Approx. County line to Enon Rd I-675 - County line to I-70 Traffic shall be maintained at all times. Estimated Cost: $532,931 Estimated Cost: $5,586,612 Award Date: Awarded Award Date: 7/7/2014 Tentative Start Date May 2014 Tentative Start Date August 2014 Estimated Completion Date 9/30/2014 Estimated Completion Date 10/31/2014 7.) Interstate 70 CLA-70-6.69, PID 82381 Mill and resurface the existing mainline lanes, and construct an additional lane to the median side. Enon Rd. to just west of U.S. 68 Traffic maintained utilizing part width construction Estimated Cost: $17,529,009 Award Date: Awarded Tentative Start Date May 2014 Estimated Completion Date 10/31/2015

Ohio Department of Transportation District 7 Darke County Projects 2014 DAR-705-9.02/9.47/10.33 DAR-127-16.69/25.30 DAR-118-8.49 DAR-47-11.05 DAR-127/185-0.76/5.29 DAR-127-16.69/25.30 DAR-36/502-4.36/9.01 DAR-121-18.76 DAR-Shawnee Prairie DAR-36/502-4.36/9.01 DAR-127/185-0.76/5.29 1. DAR-705-9.02/9.47/10.33 5. DAR-127/185-0.76/5.29 2. 3. 4. DAR-127-16.69/25.30 DAR-118-8.49 DAR-47-11.05 6. 7. 8. DAR-121-18.76 DAR-36/502-4.36/9.01 DAR-Shawnee Prairie County Manager: Jeff Whetstone Ph.: (937)-548-3015

Darke County 1.) State Route 705 2.) U.S. Route 127 DAR-705-9.02/9.47/10.33, PID 91984 DAR-127-16.69/25.30, PID 88573 Removal and replacement of three bridges along State Route 705. Project is Design Build Pavement planing and resurfacing of the existing roadway with asphalt concrete Br. No. DAR-705-0902/0947/1033 Part 1 - Horatio Harris Creek to S.R. 47 Part 2 - S.R. 185 to North Star north corp. Traffic Detoured Estimated Cost: $952,784 Estimated Cost: $2,082,709 Award Date: Awarded Award Date: 6/16/2014 Tentative Start Date Under Construction Tentative Start Date July 2014 Estimated Completion Date 8/31/2014 Estimated Completion Date 10/15/2014 3.) State Route 118 4.) State Route 47 DAR-118-8.49, PID 79550 DAR-47-11.05, PID 84221 Replacement of deteriorated structure with minimal approach work. Pavement planing and resurfacing of the existing roadway with asphalt concrete Br. No. DAR-118-0849 Ansonia East Corp. limit to US 127 Traffic Detoured Estimated Cost: $840,542 Estimated Cost: $572,896 Award Date: Awarded Award Date: 5/5/2014 Tentative Start Date Feb. 2014 Tentative Start Date June 2014 Estimated Completion Date 4/30/2014 Estimated Completion Date 10/15/2014

Darke County 5.) U.S. Route 127 & State Route 185 6.) State Route 121 DAR-127/185-0.76/5.29, PID 83946 DAR-121-18.76, PID88758 Pavement planing and resurfacing of the existing roadway with asphalt concrete Replace deteriorating wearing surface with MSC with no approach work. U.S. 127 - S. Corp. of Castine to U.S. 36 S.R. 185 - within the Village of Versailles Br. No. DAR-121-1876 Traffic Detoured Estimated Cost: $2,173,370 Estimated Cost: $417,878 Award Date: 5/5/2014 Award Date: Awarded Tentative Start Date June 2014 Tentative Start Date May 2014 Estimated Completion Date 10/31/2014 Estimated Completion Date 6/30/2014 7.) U.S. Route 36 & State Route 502 8.) Darke County DAR-36/502-4.36/9.01, PID 93183 DAR-Shawnee Prairie Reserve, PID 92415 Remove and replace existing latex modified concrete overlay with new deck overlay system. Perform pavement repairs and resurface the existing parking area with asphalt concrete DAR-36-0436 & DAR-502-0901 Darke County Garage Traffic Detoured N/A Estimated Cost: $311,798 Estimated Cost: $23,385 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 7/31/2014 Estimated Completion Date 8/31/2014

County Manager: Ted Hemleben Ph.: (937)-592-6911 Ohio Department of Transportation District 7 Logan County Projects 2014 LOG-368-2.08 LOG-366-2.98 LOG-33-10.74 LOG-33-15.21 LOG-47-11.71 CHP/LOG-245/559-21.61/3.52 1. 2. 3. 4. LOG-368-2.08 LOG-366-2.98 LOG-33-10.74 LOG-33-15.21 5. LOG-47-11.71 6. CHP/LOG-245/559-21.61/3.52

Logan County 1.) State Route 368 2.) State Route 366 LOG-368-2.08, PID 94584 LOG-366-2.98, PID 83936 Installation of guardrail along the south side of S.R. 368 and connect to the existing guardrail 500 ft East of the intersection of Lakeshore Dr. East S.R. 235 to T.R. 94 & S.R. 368 Traffic shall be maintained at all times. Milling the existing roadway and resurfacing with asphalt concrete. Traffic shall be maintained at all times. Estimated Cost: $30,000 Estimated Cost: $800,680 Award Date: 8/18/2014 Award Date: 7/21/2014 Tentative Start Date Sept. 2014 Tentative Start Date Aug. 2014 Estimated Completion Date 10/31/2014 Estimated Completion Date 10/15/2014 3.) U.S. Route33 4.) U.S. Route 33 LOG-33-10.74, PID 25012 LOG-33-15.21 L/R, PID 93766 Resurfacing the existing roadway along with other roadway related items. S.R. 117 to U.S. 68 Traffic shall be maintained at all times. Reface abutments, patch wing walls, and upper haunch. Br. No. LOG-33-1521 L & R Traffic shall be maintained at all times Estimated Cost: $114,948 Estimated Cost: $3,680,895 Award Date: Awarded Award Date: 7/7/2014 Tentative Start Date May 2014 Tentative Start Date Aug. 2014 Estimated Completion Date 7/31/2014 Estimated Completion Date 10/15/2014 5.) State Route 47 6.) State Route 559 LOG-47-11.71, PID 90808 CHP/LOG-245/559-21.61/3.52, PID 83910 Pavement planing and resurfacing with asphalt concrete. Resurface and repair the existing roadway with asphalt concrete. C.R. 23 to Everett Street 0.5 mi south of S.R. 287 Traffic shall be maintained at all times. Traffic shall be maintained at all times. Estimated Cost: $271,377 Estimated Cost: $268,710 Award Date: 7/7/2014 Award Date: 5/5/2014

Tentative Start Date Aug. 2014 Tentative Start Date June 2014 Estimated Completion Date 9/15/2014 Estimated Completion Date 10/15/2014

Ohio Department of Transportation District 7 Mercer County Projects 2014 MER-CR-FY14 MER-118-24.74 MER-CR-FY14 MER-CR-FY14 MER-29-1.62 MER-29-12.45 AUG/MER/SHE-VAR MER/SHE-274/29-3.24/23.99 1. MER-29-1.62 4. MER-29-12.45 2. 3. MER-CR-FY14 MER-118-24.74 5. AUG/MER/SHE-VAR 6. MER/SHE-274/29-3.24/23.99 County Manager: Jeff Whetstone Ph.: (937)-548-3015

Mercer County 1.) State Route 29 2.) Mercer County MER-29-1.62, PID 90540 MER-CR-FY14, PID 95081 Replace deteriorated and distorted culvert type bridge with minimal roadwork. Project to repair or replace culverts under ten feet. SR 29 at Hickory Branch Rd. Various locations within Mercer County Traffic detoured Maintenance of Traffic varies by route Estimated Cost: $209,293 Estimated Cost: $340,617 Award Date: Awarded Award Date: 6/2/2014 Tentative Start Date May 2014 Tentative Start Date July 2014 Estimated Completion Date 6/30/2014 Estimated Completion Date 8/31/2014 3.) State Route 118 4.) State Route 29 MER-118-24.74, PID 93209 MER-29-12.45, PID 88551 Overlay bridge deck with latex modified concrete, patch abutments and piers. Milling and resurfacing of the existing pavement with asphalt concrete Br. No. MER-118-2474 Traffic detoured U.S. 127 to Enterprise St. Estimated Cost: $184,346 Estimated Cost: $382,059 Award Date: Awarded Award Date: 3/24/2014 Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 8/15/2014 Estimated Completion Date 6/30/2014

Mercer County 5.) State Route 219 5.) State Route 29 AUG/MER/SHE-VAR, PID 93464 MER/SHE-274/29-3.24/23.99, PID 95163 Project to remove the existing asphalt wearing surface and overlay with micro silica modified concrete. Br. No. MER-219-1380 Field pave the existing corrugated metal pipe 700 ft. west of Harrison Rd. Traffic detoured Estimated Cost: $653,938 Estimated Cost: $41,482 Award Date: Awarded Award Date: 5/19/2014 Tentative Start Date May 2014 Tentative Start Date June 2014 Estimated Completion Date 7/31/2014 Estimated Completion Date 8/29/2014

County Manager: Shawn Anverse Ph.: (937)-339-1921 Ohio Department of Transportation District 7 Miami County Projects 2014 MIA/SHE-75-18.90/0.00 MIA-48/185-9.24-0.00 MIA-Stillwater Prairie Reserve MIA-CR 25A-18.31 MIA-BIKEPATH CONNECTIONS MIA-GMR BRIDGE CONNECTOR MIA-718-2.57 MIA-48/185-9.24-0.00 MIA-75-6.23/7.93 MIA-721-3.93 MIA-75-6.23/7.93 MIA-202-8.49 MIA-40/201-0.00/4.15 MIA-571-13.39 MIA/MOT-75-0.00/18.24 1. 2. MIA/SHE-75-18.90/0.00 MIA-CR 25A-18.31 8. 9. MIA-40/201-0.00/4.15 MIA/MOT-75-0.00/18.24 MIA-40/201-0.00/4.15 3. MIA-48/185-9.24/0.00 10. MIA-571-13.39 4. MIA-718-2.57 11. MIA-GMR BRIDGE CONNECTOR 5. MIA-721-3.93 12. MIA-BIKEPATH CONNECTIONS 6. MIA-75-6.23/7.93 13. MIA-Stillwater Prairie Reserve 7. MIA-202-8.49

Miami County 1.) Interstate Route 75 2.) County Road 25A MIA/SHE-75-18.90/0.00, PID 78425 MIA-CR 25A-18.31, PID 86659 Multilane major rehabilitation of the existing pavement by milling 7" and replacing with 8.25" Widening roadway to 4 lanes, create an urban cross section with curb and gutter and sidewalk Mile Marker 84.2 to S.R. 29 Country Club Rd. to Looney Rd. Traffic maintained utilizing contraflow traffic patterns. Estimated Cost: $21,039,155 Estimated Cost: $2,747,159 Award Date: 6/16/2014 Award Date: Awarded Tentative Start Date July 2014 Tentative Start Date Under Construction Estimated Completion Date 10/31/2015 Estimated Completion Date 7/31/2014 3.) State Route 48 & State Route 185 4.) State Route 718 MIA-48/185-9.24/0.00, PID 83899 MIA-718-2.57, PID 93205 Resurface the existing roadway, along with other roadway related items. Remove and replace existing deck overlay, refurbish bearings and repair top of backwalls. SR 185 - County Line to Piqua Corp Limit SR 48 - Within the Village of Pleasant Hill Br. No. MIA-718-0257 Traffic Detoured Estimated Cost: $1,927,824 Estimated Cost: $363,583 Award Date: 7/7/2014 Award Date: 4/7/2014 Tentative Start Date Aug. 2014 Tentative Start Date May 2014 Estimated Completion Date 10/15/2014 Estimated Completion Date 10/15/2014

Miami County 5.) State Route 721 6.) Interstate Route 75 MIA-721-3.93, PID 88772 MIA-75-6.23/7.93, PID 94084 Rehabilitation of structure by replacing bearings, deck edge repair, painting, and encasing piers. Rehabilitate structures by repairing the abutments Br. No. MIA-721-0393 Traffic detoured Br. No. MIA-75-0623 Br. No. MIA-75-0793 Estimated Cost: $528,287 Estimated Cost: $79,145 Award Date: Awarded Award Date: 4/21/2014 Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 10/15/2014 Estimated Completion Date 8/31/2014 7.) State Route 202 8.) U.S. Route 40 & State Route 201 MIA-202-8.49, PID 88762 MIA-40/201-0.00/4.15, PID 82470 Replace deteriorating concrete deck Resurface the existing roadway with asphalt concrete. Br. No. MIA-202-0849 Traffic detoured U.S. 40 - County Line to County Line S.R. 201 - From S.R. 571 to S.R. 41 Estimated Cost: $717,544 Estimated Cost: $2,451,331 Award Date: Awarded Award Date: 7/7/2014 Tentative Start Date Mar. 2014 Tentative Start Date Aug. 2014 Estimated Completion Date 5/9/2014 Estimated Completion Date 10/15/2014

Miami County 9.) Interstate Route 75 10.) State Route 571 MOT/MIA-75-0.00/18.24, PID 93196 MIA-571-13.39, PID 88560 Crack sealing the existing pavement Pavement planing and resurfacing of the existing roadway Mile Marker 59.1 to Mile Marker 70.2 C.R. 25A to Northbound I-75 ramps Estimated Cost: $351,715 Estimated Cost: $422,393 Award Date: Awarded Award Date: 4/21/2014 Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 6/30/2014 Estimated Completion Date 9/15/2014 11.) Miami County 12.) Miami County MIA-G. Miami River Bridge Connector, PID 84756 MIA-Bikepath Connections, PID 88228 Construct a bikeway/pedestrian bridge over the Great Miami River to connect sections five and six of the county trail system. Approx. 1600' south of Peterson Rd. Improving, and connecting bike sections within the City of Piqua Various locations within the City of Piqua N/A Estimated Cost: $1,557,291 Estimated Cost: $609,664 Award Date: Awarded Award Date: 8/4/2014 Tentative Start Date 9/18/13 Tentative Start Date Sept. 2014 Estimated Completion Date 7/31/2014 Estimated Completion Date 10/15/2014

Miami County 13.) Miami County MIA-Stillwater Prairie Reserve, PID 92418 Resurfacing of existing drives and parking lots Stillwater Prairie Reserve Estimated Cost: $49,500 Award Date: 5/19/2014 Tentative Start Date June 2014 Estimated Completion Date 9/15/2014

Ohio Department of Transportation District 7 Montgomery County Projects 2014 MOT-70-10.79 MIA/MOT-75-0.00/18.24 MOT-48-18.14 MOT-35-9.66 MOT-75-12.00 MOT-741-5.80 17. MOT-70-10.79 22. MOT-741-5.80 18. MIA/MOT-75-0.00/18.24 Not Included on the Map 19. MOT-48-18.14 23. MOT-35/40/741-VAR 20. MOT-75-12.00 21. MOT-35-9.66 County Manager: Bob Lenser Ph.: (937)-832-1824

Ohio Department of Transportation District 7 Montgomery County Projects 2014 MOT-75-21.96 MOT-40/70-18.83/1.06 MOT-70-9.62/14.39/14.41 MOT-70-2.95 MOT-40/70-18.83/1.06 MOT-49-8.98R MOT-70-9.62/14.39/14.41 MOT-Landscape Maintenance MOT-48/201-VAR MOT-4-22.64 MOT-48/201-VAR MOT-75-16.36 MOT-4-18.26 MOT-Monument Lighting MOT-Five Rivers Metro Park MOT-35-19.59 MOT-75-11.75/11.80 MOT-835-2.57 MOT-75-6.66 MOT-48/201-VAR 1. 2. MOT-40/70-18.83/1.06 MOT-70-2.95 7. 8. MOT-4-22.64 MOT-75-16.36 13. 14. MOT-75-11.75/11.80 MOT-835-2.57 3. MOT-49-8.98R 9. MOT-4-18.26 15. MOT-75-6.66 4. MOT-70-9.62/14.39/14.41 10. MOT-Monument Lighting 16. MOT-48/201-VAR 5. 6. MOT-75-21.96 MOT-Landscape Maint. 11. 12. MOT-Five Rivers Metro Park MOT-35-19.59 County Manager: Bob Lenser Ph.: (937)-832-1824

Montgomery County 1.) Interstate Route 70 & U.S. Route 40 2.) Interstate 70 MOT-40/70-18.83/1.06, PID 93206 MOT-70-2.95, PID 85115 Remove and replace the existing microsilica and latex modified concrete deck overlay. Bridge deck overlay with other bridge repairs I-70 - Br. No. MOT-70-0106 U.S. 40 - Br. No. MOT-40-1883 Traffic detoured Br. No. MOT-70-0295 L & R Traffic maintained Estimated Cost: $318,750 Estimated Cost: $2,303,572 Award Date: 5/5/2014 Award Date: Awarded Tentative Start Date June 2014 Tentative Start Date Under Construction Estimated Completion Date 7/31/2014 Estimated Completion Date 7/31/2014 3.) State Route 49 4.) Interstate Route 70 MOT-49-8.89R, PID 88771 MOT-70-9.62/14.39/14.41, PID 92829 Replace deteriorated bridge deck with minimal approach work. Overlay bridge decks with micro silica concrete with minimal approach work. Br. No. MOT-49-0898 R MOT-70-0962, MOT-70-1439, MOT-70-1441 Traffic Detoured Bridge Traffic Detoured Estimated Cost: $972,341 Estimated Cost: $701,955 Award Date: Awarded Award Date: 4/7/2014 Tentative Start Date Under Construction Tentative Start Date May 2014 Estimated Completion Date 4/30/2014 Estimated Completion Date 9/30/2014

Montgomery County 5.) Interstate Route 75 6.) Interstate 70 & Interstate 75 MOT-75-21.96, PID 93953 MOT-Landscape Maintenance-FY14/15, PID 96845 Construct a new noise wall along the west side of Interstate 75 just south of the U.S. 40 interchange I-75 at U.S. 40 Provide maintenance and upkeep of the existing landscaping at the I-70/I-75 interchange. I-70 / I-75 Interchange Traffic maintained Traffic maintained Estimated Cost: $432,424 Estimated Cost: $482,010 Award Date: 6/16/2014 Award Date: Awarded Tentative Start Date July 2014 Tentative Start Date March 2014 Estimated Completion Date 10/31/2014 Estimated Completion Date 2/28/2016 7.) State Route 4 8.) Interstate Route 75 MOT-4-22.64, PID 93763 MOT-75-16.36, PID 93207 Overlay bridge decks with latex modified concrete. Remove and replace deck overlay and patch large spalls on the abutments. Br. No. MOT-4-22.64 L/R Br. No. MOT-75-1636 Traffic Maintained Estimated Cost: $455,751 Estimated Cost: $641,898 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 8/31/2014 Estimated Completion Date 10/31/2014

Montgomery County 9.) State Route 4 10.) Montgomery County MOT-4-18.26, PID 88393 MOT-Monument Lighting, PID 97379 Replacement of the bridge super structure with minimal approach work. Install decorative LED lighting on the existing structure. Br. No. MOT-4-1826 Monument Ave bridge Traffic maintained Traffic maintained Estimated Cost: $2,116,926 Estimated Cost: $323,000 Award Date: Awarded Award Date: 7/7/2014 Tentative Start Date May 2014 Tentative Start Date August 2014 Estimated Completion Date 10/31/2014 Estimated Completion Date 11/15/2014 11.) Montgomery County 12.) U.S. Route 35 MOT-Five Rivers Metro Park, PID 92419 MOT-35-19.59, PID 85367 Grading and resurfacing existing parking lots and drives. Replacement or MOT-35-2066 L/R, and the rehabilitation of MOT-35-1964 L/R. Eastwood Metro Park MOT-35-1964 L/R, & MOT-35-2066 L/R Traffic Maintained Estimated Cost: $204,394 Estimated Cost: $13,972,741 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date Under Construction Estimated Completion Date 9/15/2014 Estimated Completion Date 7/15/2014

Montgomery County 13.) Interstate Route 75 14.) State Route 835 MOT-75-11.75/11.80, PID 86675 MOT-835-2.57, PID 93320 Replace deficient bridge decks on two ramps within the I-75/US 35interchange. Remove asphalt wearing surface and replace with micro-silica modified concrete overlay. Br. No. MOT-75-1175 Br. No. MOT-75-1180 Traffic detoured Br. No. MOT-835-0257 Estimated Cost: $4,693,292 Estimated Cost: $443,533 Award Date: 6/16/2014 Award Date: 5/19/2014 Tentative Start Date July 2014 Tentative Start Date June 2014 Estimated Completion Date 9/30/2015 Estimated Completion Date 9/30/2014 15.) Interstate Route 75 16.) State Route 48 &State Route 201 MOT-75-6.66, PID 88328 MOT-48/201-VAR, PID 96675 Interchange Gateway to add city logos on concrete retaining wall. Microsurface approach lanes of three intersections in Montgomery County I-75, Exit 47 SR 48 at SR 725; SR 48 at Shoup Mill Rd. SR 201 at Chambersburg Rd. Estimated Cost: $451,050 Estimated Cost: $132,811 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 6/30/2014 Estimated Completion Date 6/30/2014

Montgomery County 17.) Interstate 70 18.) Interstate Route 75 MOT-70-10.79, PID 76667 MOT/MIA-75-0.00/18.24, PID 93196 Widening and replacement of mainline pavement, including replacement or replacement of mainline bridges. (Design Build) S.R. 48 to Airport Access Rd. Crack sealing the existing pavement Mile Marker 59.1 to Mile Marker 70.2 Estimated Cost: $50,415,394 Estimated Cost: $116,843 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 7/1/2017 Estimated Completion Date 6/30/2014 19.) State Route 48 20.) Interstate Route 75 MOT-48-18.14, PID 88575 MOT-75-12.00, PID 77247 Pavement planing and resurfacing Reconstruction of Interstate 75 through downtown Dayton. Poplar St to Clayton S. Corp. Limit SR 4 to US 35 Estimated Cost: $540,367 Estimated Cost: $125,564,985 Award Date: 8/4/2014 Award Date: Awarded Tentative Start Date Sept. 2014 Tentative Start Date Under Construction Estimated Completion Date 10/15/2014 Estimated Completion Date 9/1/2017

Montgomery County 21.) United States Route 35 22.) State Route 741 MOT-35-9.66, PID 82453 MOT-741-5.80, PID 90771 Pavement planing and resurfacing Bricker Ave. to SR 49 Project consists of resurfacing the roadway, installation of sidewalks, curb ramps, and updates to the traffic signal. Orchard Run Rd. to Alex Bell Rd. Estimated Cost: $382,930 Estimated Cost: $1,256,259 Award Date: 7/7/2014 Award Date: 4/21/2014 Tentative Start Date Aug. 2014 Tentative Start Date May 2014 Estimated Completion Date 10/15/2014 Estimated Completion Date 10/15/2014 22.) Montgomery County MOT-35/40/741-VAR, PID 93450 Bridge structural steel painting Numerous bridges throughout the district Estimated Cost: $1,876,818 Award Date: Awarded Tentative Start Date May 2014 Estimated Completion Date 11/15/2014

Ohio Department of Transportation District 7 Shelby County Projects 2014 SHE-29-0.07/10.96/12.90 CHP-245/VAR-20.05/VAR SHE-119-4.20 SHE-75-15.51 AUG/MER/SHE-VAR-VAR SHE-75-8.88 SHE-29-0.07/10.96/12.90 SHE-29-0.07/10.96/12.90 SHE-HQ Radio Room SHE-47-16.46 MIA/SHE-75-18.90/0.00 SHE-75-3.72 MER/SHE-274/29-3.24/23.99 SHE-Lock One SHE-75-1.02 1. SHE-29-0.07/10.96/12.90 6. SHE-75-8.88 11. MER/SHE-274/29-3.24/23.99 2. SHE-119-4.20 7. SHE-47-16.46 12. SHE-HQ Radio Room 3. AUG/MER/SHE-VAR-VAR 8. MIA/SHE-75-18.90/0.00 13. SHE- Lock One 4. CHP-245/VAR-20.05/VAR 9. SHE-75-3.72 5. SHE-75-15.51 10. SHE-75-1.02 County Manager: Tony Brown Ph.: (937)-497-6929

Shelby County 1.) State Route 29 2.) State Route 119 SHE-29-0.07/10.96/12.90, PID 95160 SHE-119-4.20, PID 87663 Remove and replace the existing roadway culverts. Various locations within Shelby County Roadway reconstruction, curbs, sidewalk, and storm sewer. SR 119 within the Village of McCartyville Traffic detoured Traffic Detoured Estimated Cost: $299,849 Estimated Cost: $657,701 Award Date: 4/21/2014 Award Date: 5/19/2014 Tentative Start Date May 2014 Tentative Start Date June 2014 Estimated Completion Date 7/31/2014 Estimated Completion Date 9/30/2014 3.) State Route 119 4.) State Route 245 AUG/MER/SHE-VAR-VAR, PID 93464 CHP-245/VAR-20.05/VAR, PID 92545 Remove existing asphalt wearing surface and overlay with Micro Silica modified concrete. Repair of curb & gutter, sidewalk, tree lawn, and other roadway related items. Br. No. SHE-119-0286 S.R. 274 within the Village of Jackson Center Traffic Detoured Estimated Cost: $653,938 Estimated Cost: $435,766 Award Date: Awarded Award Date: 7/21/2014 Tentative Start Date May 2014 Tentative Start Date Aug. 2014 Estimated Completion Date 7/31/2014 Estimated Completion Date 11/1/2014

Shelby County 5.) Interstate Route 75 6.) Interstate Route 75 SHE-75-15.51, PID 93256 SHE-75-8.88, PID 24999 Overlay bridge deck, remove safety curb and railing, patch piers, and paint structure. Br. No. SHE-75-1551 Resurfacing of existing pavement with asphalt concrete. SR 29 to SR 274 Traffic detoured Estimated Cost: $460,334 Estimated Cost: $6,114,620 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 9/30/2014 Estimated Completion Date 9/30/2014 7.) State Route 47 8.) Interstate Route 75 SHE-47-16.46, PID 83585 MIA/SHE-75-18.90/0.00, PID 78425 Replace deficient bridge with minimal approach work Reconstruction of mainline pavement Br. No. SHE-47-16.46 Mile Post 84.4 to SR 29 Estimated Cost: $1,296,590 Estimated Cost: $21,039,155 Award Date: Awarded Award Date: 6/16/2014 Tentative Start Date May 2014 Tentative Start Date July 2014 Estimated Completion Date 9/30/2014 Estimated Completion Date 10/30/2015

Shelby County 9.) Interstate Route 75 10.) Interstate Route 75 SHE-75-3.72, PID 83583 SHE-75-1.02, PID 91728 Replace deficient bridge decks Br. No. SHE-75-0372 L & R Raise the structure and replace the bridge deck. concrete. Br. No. SHE-75-0102 Traffic detoured (Bridge traffic) Estimated Cost: $3,388,012 Estimated Cost: $1,139,929 Award Date: Awarded Award Date: Awarded Tentative Start Date Under Construction Tentative Start Date May 2014 Estimated Completion Date 9/30/2014 Estimated Completion Date 10/15/2014 11.) State Route 29 12.) Shelby County MER/SHE-274/29-3.24/23.99, PID 95163 D07-Radio Room, PID 93569 Field pave the existing corrugated metal pipe Demolish the back section of the Annex and add a new area onto the District Garage to house the demolished Radio Room. 1400 ft. east of SR 589 District Headquarters N/A Estimated Cost: $41,482 Estimated Cost: $570,000 Award Date: 5/19/2014 Award Date: Awarded Tentative Start Date June 2014 Tentative Start Date 7/1/2013 Estimated Completion Date 8/29/2014 Estimated Completion Date 6/30/2014

Shelby County 13.) Shelby County SHE-Lock One, PID 83290 Reconstruct Lock 1, remove foundation stones, and replace with a concrete foundation Lock One in the Village of Lockington N/A Estimated Cost: $1,687,101 Award Date: Tentative Start Date Awarded Under Construction Estimated Completion Date 5/15/2014

District Wide 1.) D07-FY 14-Herbicidal Spray 2.) D07-Mowing-FY14/15 PID 94666 PID 96683 Applying herbicides along roadsides for noxious weed control District wide mowing Auglaize, Champaign, Clark, and Logan Counties District wide Estimated Cost: $106,012 Estimated Cost: $1,060,003 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 7/15/2014 Estimated Completion Date 11/15/2015 3.) D07-FDPM-FY14 4.) D07-PPM-FY14 PID 88685 PID 88736 2014 District wide fast dry pavement marker 2014 District wide polyester pavement marking program program District wide District wide Estimated Cost: $1,846,990 Estimated Cost: $679,948 Award Date: 3/24/2014 Award Date: 4/21/2014 Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 8/31/2014 Estimated Completion Date 8/31/2014

District Wide 5.) D07-RPM-FY14 6.) D07-LG-FY14/15 PID 88741 PID 88746 2014 District wide raised pavement marker Highway lighting maintenance project program District wide District wide Estimated Cost: $178,267 Estimated Cost: $283,512 Award Date: 5/5/2014 Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date Under Construction Estimated Completion Date 8/31/2014 Estimated Completion Date 8/31/2014 7.) D07-TSG Maint 79-FY13/14 8.) D07-Micro PM-FY14 PID 88470 PID 88690 Traffic signal maintenance project program Microsurface various roadways throughout the district District wide District wide Estimated Cost: $506,550 Estimated Cost: $1,227,635 Award Date: Awarded Award Date: Awarded Tentative Start Date Under Construction Tentative Start Date May 2014 Estimated Completion Date 10/31/2014 Estimated Completion Date 7/15/2014

District Wide 9.) D07-BH-FY14 10.) D07-Brdg Deck Sealing PID 94483 PID 93453 Pier patching and abutment patching on various bridges within the district. District wide bridge deck sealer treatments District wide District wide Estimated Cost: $658,434 Estimated Cost: $465,991 Award Date: 5/22/2014 Award Date: 6/16/2014 Tentative Start Date June 2014 Tentative Start Date July 2014 Estimated Completion Date 9/30/2015 Estimated Completion Date 10/15/2014 11.) D07-Brdg Deck Sealing PID 93461 District wide bridge deck sealer treatments District wide Estimated Cost: $328,130 Award Date: Awarded Tentative Start Date May 2014 Estimated Completion Date 7/31/2014