SAFE STREETS FOR ALL. A Report to Land Use Committee on Street widths in Hunters Point Shipyard and Candlestick Point Developments

Similar documents
El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

CURBSIDE ACTIVITY DESIGN


Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

10.0 CURB EXTENSIONS GUIDELINE

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

5 CIRCULATION AND STREET DESIGN

San Jose Transportation Policy

NJDOT Complete Streets Checklist

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

Morristown, NJ Complete Streets Policy

CURB EXTENSIONS BULB OUTS DPS 201 NECKDOWNS

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

Arlington s Master Transportation Plan

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

EXECUTIVE SUMMARY. Vision

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

11/28/2016 VIA

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

Executive Summary Route 30 Corridor Master Plan

Tonight is for you. Learn everything you can. Share all your ideas.

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

Belvedere Heights Streetlights & Sidewalks Improvements Project

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

Living Streets Policy

Complete Streets. Designing Streets for Everyone. Sarnia

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Ann Arbor Downtown Street Plan

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Long Island Rail Road Expansion Project Floral Park to Hicksville

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Environment and Public Works Committee Presentation

122 Avenue: 107 Street to Fort Road

3/20/2015 VIA . Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Report. Typical Sections. City of Middleton, WI

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

DOWNTOWN MIAMI PEDESTRIAN PRIORITY ZONE

Street Paving and Sidewalk Policy

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

City of Charlottesville Bicycle and Pedestrian Master Plan Update

CITY MANUALS AND STANDARDS REVIEW

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Westgate/Belvedere Homes Community Redevelopment Agency. Belvedere Heights. Streetlights & Sidewalks Improvements Project.

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

Plant City Walk-Bike Plan

ACTIVE TRANSPORTATION

9/22/2014 VIA . RE: Butano Apartments Pre App (PAMP )

Borough of Danville, PA Traffic Calming Program Guidelines

CONNECTING PEOPLE TO PLACES

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Lawrence Avenue Streetscape Concepts August 30, 2011

Omaha s Complete Streets Policy

4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811

What Is a Complete Street?

9/21/2016 VIA . RE: The Knot (DR16-270)

CITY OF ROCK HILL, SOUTH CAROLINA. Neighborhood Traffic Calming Program A Policy for Use of Traffic Calming on Local (Residential) Streets

WELCOME Mission-Geneva Transportation Study

MARTIN LUTHER KING JR. WAY

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Chapter 2: Standards for Access, Non-Motorized, and Transit

Dewey Area Traffic Calming Project

Public Information Centre

CHAPTER 7.0 IMPLEMENTATION

RE: Park Plaza Walgreens (P12-016)

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Duwamish Way-finding and CTR Report

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

8/1/2018 VIA . Darcy Goulart City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

5. Pedestrian System. Accomplishments Over the Past Five Years

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

INDEX. Geometric Design Guide for Canadian Roads INDEX

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Item No. 14 Town of Atherton

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

NEIGHBORHOOD TRAFFIC CALMING POLICY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

City of Seattle Edward B. Murray, Mayor

Transcription:

SAFE STREETS FOR ALL A Report to Land Use Committee on Street widths in Hunters Point Shipyard and Candlestick Point Developments

Background: Candlestick Point Hunters Point Shipyard Redevelopment Project One of San Francisco s largest development projects Candlestick Point 280 acres Hunters Point Shipyard Phase 1 and 2 500 Acres Total Area 780 acres

Multiple Phases : Hunters Point Shipyard - Phase I 75 Acres (under construction) Alice Griffith Housing - Phase I 10 Acres (in design phase) The balance of the 780 acres project area will be designed and built in multiple phases between now and Year 2039 depending on market forces.

Project Map :

Background: CP and HPSY 800 Acre Development include: Residential, New Housing, Multi Story, Mixed Use Units 10,500 Units Commercial, Retail, Office Units 3,000,000 Units Open Space, Parks, other amenities 300 Acres Hundreds of miles of new infrastructure must be built to support the new neighborhoods including: A network of new roads and sidewalks Above-and-below ground utilities: water, sewer, recycled water, AWSS, power, gas, cables, telecommunications, streetlights, traffic signal systems, etc. Streetscape Improvements: eco-friendly bioretention systems, trees, landscaping, street furniture, etc.

Detailed Project Map:

Candlestick Point 2010 Infrastructure Plan The Infrastructure Plan provides guidance on best practices and is the guiding document for implementation of the goals, which include : multi-modal street design environmental planning incorporation of sustainable water management techniques 2010 CP & HPSY Plan did not set or approve a 20 feet street as an across-theboard standard but rather, provided this as one possibility among many other street cross sections Adopted by the Board on December 7, 2010

Candlestick Point 2010 Infrastructure Plan Infrastructure descriptions apply generally to streets in the CP area May vary slightly from street to street based on particular requirements Shall be determined during the review of the applicable subdivision improvement plans and in accordance with the procedure for granting exceptions as set forth in the CP/HPS2 Subdivision Code and the Project DDA SFFD s acceptance of the SFFD Infrastructure Caveat that the SFFD consent to the Infrastructure Plan per the ICA was not intended to, in any way limit the authority of the SFFD as set forth in Section 4.108 and 4.128 of the Charter.

Project Timeline 2010 DDA w/ SFRA February : OCII Succeeds June : SFRA Dissolved 2011 Interagency Cooperative Agreement (ICA): Streets widths under 34 considered substandard Infrastructure Plan Subdivision Code CPHP Sec. 1633 agreement to submit architectural drawings with vesting map application 2012 April : SUR maps submitted for Street Vacations June : Surveys of Development submitted CCSF + Developer begins discussion on subdivision process and regulations 2013 October : Alice Griffith Application Submitted December : Mayor announces directive for new housing initiative February : VTSM Submitted 30 days by state law for review March 13 : Street Vacation Ordinance Approved Application submitted no architectural drawings submitted 50 days by state law to approve/disapprove 2014 April : Approved Alice Griffith phase May : Mylars submitted for recording May 5 : SMA requires decision applicant requests extension until May 20 CCSF accepts application as complete (won t reject) Agrees to defer architectural drawings with conditions of approval May 7 : Compromise tentatively reached June : Trust parcel & state lands exchange 2015 October : Alice Griffith break ground 2016 2017 June : VTSM break ground 4 Major Phases thru 2039 18 Sub-phases 2039

Infrastructure network must also be engineered to meet the needs and safety of: Pedestrians People with disabilities Bicyclists Public transportation (including Bus Rapid Transit) On-street parking/loading, including for persons with disabilities Passenger, commercial, maintenance, utility vehicles EMERGENCY VEHICLES with consideration to obstructions, turning radii, passing lanes, parking, outrigger support, etc.

Turn Radius Template

Emergency vehicles need to move safely through intersections without having to travel or make turning movements that bring them into conflict with pedestrians. POLICE MEDICAL FIRE

Operational Issues Ladder placement Hose leads Collapse zone Hydrants Aerial operations

Montrose (Houston Area), 2014

Montrose (Houston area), 2014 Salt Lake City, 2014 Construction Fires : 2014 San Francisco, 2014 San Jose, 2002

ADA Accessibility and Pedestrian Safety In lieu of narrow streets, an effective means to make crosswalks more accessible to persons with disabilities is to provide refuge islands. Proximity of pedestrians to vehicles too close especially turning commercial trucks Increase reaction time to avoid collision for pedestrian and drivers by allowing buffer space Tolerance for error (by drivers and pedestrians) is key for accessibility and safety Toolbox of techniques for traffic calming available instead of simply narrowing streets

The City s Collective Goals The City Family will continue to collaborate with the Developer in order to ensure that the street system is functional and safe for all uses in order to protect the public and that it operates efficiently for its expected life. We will continue to consider narrower roadway design proposals, on a case by case basis, when design details are provided which demonstrate that the safety of all users of the Public Right of Way can be achieved. City Agencies are committed to these goals as the City implements the Candlestick Point/Hunters Point Shipyard project over the next few decades.