WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

Similar documents
APPENDIX E Evaluation of Improvement Alternatives

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Blair/Williamson Intersection Expressed Needs

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

INNOVATIVE INTERSECTION DESIGN

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Capital Region Council of Governments

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

EXHIBIT R1. Neighborhood Cul-de-Sac Implementation

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Shockoe Bottom Preliminary Traffic and Parking Analysis

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

A-1 Arcadia with Signal

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

FINAL Albertville Business Park AUAR Update Traffic Study

West Circle Drive (CSAH 22) Traffic Operations Study

Albany Shaker Road Corridor Study Public Meeting # 2

Donahue Drive Corridor Traffic Operational Evaluation

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Delaware Avenue Corridor Study

Transportation Advisory Board

Gene Dillon Elementary School Traffic Study Division Street Site

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

THIS PAGE LEFT BLANK INTENTIONALLY

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

CONTENTS EXECUTIVE SUMMARY. 1 SUMMARY OF EXISTING CONDITIONS Issues and Observations Public Meeting (December 2005) 1

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Conversion of One-Way Couplet Streets to Two-Way

Glenn Avenue Corridor Traffic Operational Evaluation

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Forest Hills Improvement Initiative

King Soopers #116 Thornton, Colorado

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRAFFIC IMPACT ANALYSIS

Traffic Study North Shore School District 112

CONTENTS EXECUTIVE SUMMARY 1

WHANGAREI IMPROVEMENTS

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

City of Wausau Wausau Center Urban Design and Transportation Master Plan. Design Workshop // October 18, 2018

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Innovative Intersections Presentation by Andrew O Brien

Date: 09/22/2016 Subject: To: From: PennDOT Engineering District 5-0. Dear Applicant,

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY

Project Goals and Objectives

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Foothill Expressway Improvements Between El Monte and San Antonio

VT15 / Allen Martin Drive Intersection Scoping Study

Transportation Impacts: Toronto York Spadina Subway Extension

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

US-6 Spanish Fork Fact Finding Study. December 2017

Figure 1: Vicinity Map of the Study Area

PAT Meeting #2 Future Alternatives Meeting Agenda

Public Meeting #1 Comment Summary

Fairfax County Parkway Widening Fairfax County

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Chapter 16: Traffic and Parking A. INTRODUCTION

Committed to Service

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

A partnership of Christchurch City Council, New Zealand Transport Agency and Environment Canterbury Keeping Christchurch Moving

Paris on the Grand Residential Development TIS Response to City of Brant Comments APPROACH LEFT MOE LEFT THROUGH RIGHT

Boston Post Road Design Feasibility Study

APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Please find below the Town staff s responses to NCDOT s recommended roadway stipulations listed in a letter dated May 25, 2015.

Edgemont Village Traffic and Parking Technical Report January 2014

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Henderson Avenue Mixed-Use Development

Focused Traffic Analysis for the 200 Nellen Avenue Project

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

REDEVELOPMENT TRAFFIC IMPACT STUDY

Intersection Traffic Control Feasibility Study

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft North Industrial Area-Wide Traffic Plan

North Avenue Corridor Study

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

Preliminary Engineering Study

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

Giles Run Connector Road

ORANGE COUNTY TRAFFIC COMMITTEE. Intersection Control. Constituent. Deepthi Arabolu. Relocate Stop Sign

Transcription:

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING March 28, 2017

STUDY AREA N

MEETING AGENDA Introductions Study Background Alternatives Studied Recommended Alternative Discussion

STUDY BACKGROUND The Wisconsin Department of Transportation, based on traffic safety concerns, may in the future remove the Pilgrim Parkway traffic signals at Watertown Plank Road and restrict traffic movements to northbound and westbound right turns.

Ayres Associates Traffic Observations: 1. Eastbound Bluemound left turn to Pilgrim Parkway regularly backs into Bluemound intersection from Watertown Plank Road signals (up to 4 cars) 2. Southbound Pilgrim Parkway traffic sometimes backs into Watertown Plank Road intersection from Bluemound Road 3. Other Traffic Concerns 1. Traffic diversion on Terrace Drive 2. Terrace Drive right turn conflicts with eastbound Bluemound Road U-turns 3. Minor cut-through traffic observed in Bakers Square and Mobil parking lots

RELATED TRAFFIC DATA Selected Peak Hour Traffic Volumes: Watertown Plank Road westbound left turn = 350 vph North Shore Bank eastbound right turn = 100 vph Ace Hardware driveway (2-way volume) = 110 vph Pilgrim Parkway southbound left turn at Watertown Plank Road = 65 vph Pilgrim Parkway northbound right turn at Watertown Plank Road = 380 vph Bluemound Road eastbound left turn at Pilgrim Parkway = 645 vph Pilgrim Parkway = 2,410 vph Bluemound Road = 4,640 vph

RELATED TRAFFIC DATA Intersection Spacing: Bluemound to Watertown Plank Road = 325 feet Watertown Plank Road to Wisconsin Ave = 535 feet

WISCONSIN AVENUE ALTERNATIVES Scenario Description 1 Existing Condition (DO NOTHING) 2 Extension with 2-way stop signs 3 Extension with traffic signals 4 Extension with removal of Watertown signals but allow right turns and northbound left A with signals at Wisconsin Avenue B with roundabout at Wisconsin Avenue 5 Extension with realigned Watertown Plank Road and Watertown cul-de-sac A with signals at Wisconsin Avenue B with roundabout at Wisconsin Avenue, (removed from consideration based on comments from last open house)

Alternative 1 (Do Nothing) Not Acceptable due to safety and congestion

Alternative 2 (Wisconsin Ave Extension with Stop Sign Control) Not Acceptable due to safety and congestion

Alternative 2 Intersection Improvements

Alternative 3 (Wisconsin Ave Extension with Signals) Not Acceptable due to safety and congestion

Alternatives 4A & 4B (Wisconsin Ave Extension with No Westbound Left Turn and Stop Signs) Functionally Acceptable

Alternative 4A Signalized Intersection Design Concept North Shore Bank Watertown Plank Road Walgreen s

Alternative 4B Roundabout Design Concept (Removed from Consideration) Ace Hardware

Alternatives 5A & 5B (Wisconsin Ave Extension with Relocated Watertown Plank Road) Functionally Acceptable

Updated Alternative 5B Functionally /Acceptable

WISCONSIN AVENUE ALTERNATIVES 1-3 PROS/CONS Alternative Description 1 a. Bluemound queues extend into Watertown Plank Road intersection b. Cannot fit required turn lane lengths between intersections Not Acceptable due to safety and congestion 2 a. LOS F operation and delays exceeding 3-minutes Not Acceptable due to safety and congestion 3 a. Bluemound queues extend into Watertown Plank Road intersection b. Cannot fit required turn lane lengths between intersections Not Acceptable due to safety and congestion

WISCONSIN AVENUE ALTERNATIVE 4 PROS/CONS Option Description Signals a. Eliminates Watertown Plank Road left turn movement b. Creates northbound U-turn at Wisconsin Avenue extension c. Encourages traffic diversion to neighborhood streets d. Requires cut-through traffic mitigation on Terrace Drive e. Creates traffic gaps for Development north of Ace Hardware Functionally Acceptable Roundabout a. Larger environmental impacts than Signal option b. Does not provide traffic gaps for Development north of Ace Hardware c. Similar impacts to Signal option Functionally Acceptable (removed from consideration)

WISCONSIN AVENUE ALTERNATIVE 5 PROS/CONS Option Description Signals a. Maintains full Watertown Plank Road access to Pilgrim Parkway b. Creates traffic gaps for Development north of Ace Hardware c. Eliminates existing Watertown Plank Road left turn movements d. Eliminates direct access to Ace Hardware driveway e. Reduces North Shore access to right in/right out f. Requires right-of-way for realigned Watertown Plank Road Functionally Acceptable Roundabout a. Larger environmental impacts than Signal option b. Does not provide traffic gaps for Development north of Ace Hardware c. Similar impacts to Signal option Functionally Acceptable (Removed from consideration)

Terrace Drive Southbound Right Turn Traffic Diversion Impact Existing Peak Hour Volumes * Morning Peak = 70 vph * Evening Peak = 60 vph With Diversion Peak Hour Volumes * Morning Peak = 145 vph * Evening Peak = 140 vph

CUT-THROUGH TRAFFIC MITIGATION OPTIONS 1. Prohibit southbound right turns at Bluemound Road 2. Prohibit northbound left turns from Watertown Plank Road 3. Cul-de-sac Terrace Drive at Bluemound Road 4. Convert Terrace Drive to collector street and purchase adjacent properties 5. Construct Alternative 5 with a relocated Watertown Plank Road

DISCUSSION

ALTERNATIVE OPERATING STATISTICS

Alternative 1 Intersection Improvements

Alternative 2 Intersection Improvements

Alternative 3 Intersection Improvements

Alternative 4A & 4B Intersection Improvements

Alternative 5A & 5B Intersection Improvements

TRAFFIC SIGNALS VS ROUNDABOUT PROS/CONS Traffic Signals Creates traffic gaps for cars exiting driveways north of Wisconsin Avenue Potentially less environmental impacts Easier to use for sight-impaired pedestrians Serves as a southbound traffic metering tool to Bluemound Road intersection Requires eastbound Wisconsin Avenue No Turn on Red restriction to accommodate northbound U-turns Roundabouts Safer than traffic signals with less severe crashes Operates at a higher Level of Service with reduced queuing Does not provide metered traffic breaks