Troyer s Gourd Rack 8 unit F R H O P

Similar documents
Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

GATE INSTALLATION INSTRUCTIONS

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

American Flagpole & Flag Co. 1(800)

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.

BALL STOP INSTALLTION GUIDE

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

Santa Fe Cycles Assembly Guide Introduction

NEXT GENERATION FLEX FENCE

First Team Sports, Inc. Stellar Recreational Volleyball System

OUTDOOR BACKSTOP WITH 5'-0" EXTENSION

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Tripod Setup Guide (M-TPx)

Side-of-Pole Mount for 1 Module (SPM1) For Module Type C

CHAPTER 5 REWIND STARTERS

RS Important Notes. Contact. Bicycle Maintenance Stand instructions manual. Warranty Period : 1 year (from the date of your purchase)

VERSA BIKE RACK INSTRUCTIONS

First Team Sports, Inc. Blast Recreational Volleyball System

Assembly Guide ST200 FUNCTIONAL TRAINER

Installation Instructions

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

Disassembling and assembling APP and APP 16-22

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

Side-of-Pole Mount for 1 Modules (SPM1) For Module Types E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Bladerider X8 Assembly Help Notes

APP pumps APP and APP Disassembling and assembling

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

Assembly Instructions. -Cantilever Boat Lifts

Parts List. 7. Handlebars 8. Grips 9. Handlebar Stem 10. Front Brake 11. Front Wheel 12. Crank 13. Chain

Installation Instructions for the AlphaDeck Staging System

BELT DRIVE PREMIUM INDOOR CYCLING BIKE SF-B1509 USER MANUAL

Introduction to Evolutionary Hoof Care s New Hoof Care Work Stations TM and Evo Hoof Stands TM Also see Video Instructions at

STADIUM GLASS OWNER S MANUAL BASKETBALL GOAL SYSTEM

Falcon 3 145, 170, 195 and Tandem Owner / Service Manual

Boat Boat Loader Fitting Instructions

FNFB-30 (30 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM) Installation Instructions

8. Carefully layout all the parts of the reservoir setup and clean any dirt, grime or dust from the parts. ( image 8 ) 8

Model: 5100 OmniSteel Volleyball System

Swing Set. Sheffield Model 22-PS320

RehabPro Standard Pulley (M30, M50, M70, M30F, M50F, M70F)

TRAILMATE METEOR ASSEMBLY MANUAL

3547 Meeks Farm Rd. A1 Charleston, SC 29455, Instructions Table of Contents

Final Assembly Instructions Bikes with Quill Stems

Booster Pump PB4-60 Replacement Kits

RehabPro Speed Pulley (M100S & M100FS) User Manual

MAGNETIC INDOOR CYCLING BIKE

Lock-N-Load. Bullet Feeder

Assembly Instructions

No ' Long No ' Long

CamRT Sun Top Bimini Installation Instructions

Final Assembly Instructions Bikes with 16 Wheel Size

DIY Shallow Water Anchor Assembly Instructions for Rods, T-grips, Stainless Tips, Stainless Couplers, and the 4-in-1 Paddle

Supplementary Operation, Assembly, Maintenance Manual for F3-42 model and optional attachments

Instructions. Follow All Instructions Before Assembling Or Using This Product

BackCountry ebikes 2019 MULE Assembly

ORNAMENTAL CANTILEVER GATE INSTRUCTIONS

Retractable Security Cover for a Swim Spa

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

Marine 6-Boat Free-Standing Racks SKU: Updated November 2011

IMPORTANT SAFETY NOTICE

Beach Dolly with cradle & keel pad Assembly Instructions

THOR 10 HAMMER CAGE INSTRUCTIONS

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

SEADUCER BOATS GAS MONO COME VISIT US ON THE WEB AT

20', 15', AND 12' BALL STOPS ASSEMBLY INSTRUCTIONS

Row Marker OEM /

3M Liqui-Cel EXF-10x28 Series Membrane Contactor with ANSI or JIS Connections with Integrated End Caps

IMPORTANT: RECEIVING INSTRUCTIONS:

Final Assembly Instructions Bikes with Threaded Headsets

A-FRAME RESIN IN & OUT FLIP UP LADDER

Trike-Bike Assembly Manual

SANTANA STOWAWAY TANDEM WITH AIRLINER SAFECASE AND FTS FOAM TRAY SYSTEM ASSEMBLY AND DISASSEMBLY

Backboard and Rim Owners Manual

BELT DRIVE PREMIUM INDOOR CYCLING BIKE SF-B1509 USER MANUAL

KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS

Model: 7200 Collegiate Volleyball System

User s Manual. Model SWTC800. CAUTION: Adult Assembly Required

A. TO PREPARE THE MACHINE FOR USE.

E-trike Li Assembly Guide

Item # in1 Rotating Table. Inch BILLIARDS AIR HOCKEY TABLE TENNIS

Installation Guide Wall Mounted Angled Flagpole

Foos 300 Assembly Instructions

Array Solutions 350 Gloria Rd Sunnyvale, TX Phone FAX

Methylethycetone (MEC) - PMS 60 polyurethane glue - Grease - White silicone

1.0 - OPENING AND CLOSING THE DOOR

CO V E R S TA R AU TO MAT I C S A F E T Y CO V E R INSTALLATION GUIDE

DM-RD (English) Dealer s Manual. ROAD Rear Derailleur RD-9000 RD-6800 RD-5800 RD-4700

PULLTARP INSTALLATION & OPERATORS MANUAL

U STAND INSTALLATION INSTRUCTIONS

In-Ground Basketball System Owners Manual

MAVERICK FOOSBALL TABLE

600 / 600FC OWNER'S MANUAL

Retrofitting Green SkiErg Handles

Transcription:

B E A D I M-N L Vertical Parts F R H O P Horizontal Parts C G J Updated 11/16 Parts List A: Top of Pole B: Bottom of Pole C: 48 Ground Stake D: Top Perch rods 48 long E: Hub F: Rope Winder w/ attached stainless steel hardware G: (2) 10-24 x 1/4 set screws and allen wrench H: Top Cap for pole I: 4 U shaped gourd hanging arms J: small angle piece attached to the 4 part rope and pulley with eyebolt M,N ¼ - 20 x ¾ bolts 16 total of each R: Braces (4) for hanging arms with 8 ¼ - 20 x ¾ bolts with nuts. P: 8 Stainless hitch pins For Vertical Starter: L 8 Vertical GMA s M 8 stainless bolts N 8 Stainless whiz nuts OR For Horizontal Starter M 8 stainless bolts N 8 Stainless whiz nuts O 8 Horizontal GMA s Tools Needed for Assembly 7/16 box wrench 9/16 box wrench Ruler, pencil Speed square 3 in 1 oil I M P O R T A N T The ground stake part C can be found inserted into the upper pole section (A). There is a stop plate (see circle) that keeps the ground stake from moving during shipping. This end should be placed into the ground. If you should accidentally install the ground stake upside down, the stop plate is removable. Simply unscrew the bolt and the plate will come off. A C 2007-2018 Questions or comments? Please contact SuperGourd.com or info@supergourd.com Page 1

Tools used for installing ground stake Post Hole Digger Shovels, flat and round Digging Bar Level Ruler The installation of a ground stake is as vital as the foundation of your home. Both need to be done correctly in order to support the housing. Please read and follow these directions. Your rack will only be as good as its foundation. If your purchased a ground sleeve follow the sleeve instructions, skip steps 1-7. Step 1 Installing the aluminum ground stake. Using a post hole digger, dig a hole with a minimum depth of 32-36 deep by 10 in diameter. Poor ground conditions may warrant a larger hole and more concrete. After your hole is dug place about 4 of pea gravel into the hole. Step 1 Step 2 Measure and mark all 4 sides of your ground stake 24 from the top down (note, the aluminum ground stake is universal, no need to worry which end you place in the ground). This will help keep your ground stake at the proper above ground height. Step 3 You will need at least 3 bags of Ready to Use Concrete Mix, 80 pounds each. Step 3-4 Step 4 Empty contents of the ready mix concrete into an old wheel barrow. Mix and handle the concrete according to the directions on the bag. Step 5 Shovel your wet concrete into your hole to the top of your hole. Step 5 Step 6 Insert your ground stake into the cement. Hold the ground stake vertically. You firmly PUSH down several inches then pull up a bit, then push downward, slowly sinking the aluminum stake into the cement. Stop when the cement meets the line drawn on your stake (see circle). Next fill the hollow tube of the stake with cement. To settle the cement in the tube, gently tap the sides of the stake. Finish by sloping the cement away from the stake so water will not puddle against it. Step 6 Step 7 Wipe off any concrete from the exterior of the ground stake, check for plumb and that your ground stake is the full 24 inches above ground. Periodically check your ground stake for plumb. For best Step 7 results wait at least 2 days for your concrete to cure. 2007-2018 Questions or comments? Please contact SuperGourd.com or info@supergourd.com Page 2

Step 8 Assemble the pole. Notice that your pole consists of a top piece, (A) which has a splice piece installed at one end of the pole and holes on the other end, and a bottom piece (B) which has 2 square cut ends. Upturn a 5 gallon bucket and lean the bottom section so that either end rests on top of the bucket. Insert the splice piece into the bottom end piece that has NO tapped holes. The splice should slide in with little force. The splice will remain in place due to gravity. Tip! Spray the splice with WD 40, it will aid in insertion of splice center and mark. This will be how far you will insert each rod. Insert one rod into the lower top perch hole first. Tighten the set screw and repeat for the upper top perch rod. Tip! When tightening your set screw use the shorter end of the allen wrench, it will give you more torque (tightening power). Step 10 Step 11 Insert the top cap. Insert the black pole cap, by gently tapping it into the top of your pole. Step 12B Repeat on the opposite side of the hub. You are now going to place the arm pieces on the side of hub where you see TWO glide buttons. One of these sides you will be attaching the small angle piece (J) with the attached rope and pulleys For ease of assembly, place the gourd arm that will not have the extra angle piece on first. Step 8 Step 9 Set your pole over the bucket so that you see 1 predrilled large hole in the upper right and one same size hole, approximately 2 lower and to the left. Step 9 Step 11 Step 12 Assemble the hub unit. You will need you angle arms (I) the 1/4-20/x 3/4 stainless bolts and whiz nuts, and the small angle piece (J) that has a hole in the center. Insert 2 of the bolts into the side of the hub which has ONE glide button (see photo 12A), align the arm so that the holes in the center of the gourd-hanging arm holes slips over the bolts on the hub. Thread the nuts on (12B) Last add the remaining gourd arm over the bolts, then place the small angle on with the attached rope and pulleys. Thread the nuts on and tighten. Step 12C Step 10 Install the top perch rods. You will need your 2, 10-24 x 1/4 set screws (G) and your 2 top perch rods (D) and the allen wrench (G). Locate the small tapped hole. Using your allen wrench thread the set screw in to the hole only deep enough to hold the set screw into place. Measure your top perch rods and find the Step 12A Step 13 Tighten all the nuts and make sure your arms are level by placing a speed square to the bottom of the gourd arm. Step 14 Its time to place the hub onto the pole. Slide the hub onto the pole from the BOTTOM of the 2007-2018 Questions or comments? Please contact SuperGourd.com or info@supergourd.com Page 3 Step 12C

tighten the lock nut. Make sure that you orient the eyebolt so that open end is facing up, and that the eyebolt is parallel to the pole. Step 13 Step 18 pole, upward. (The arms attached to the hub is the top of the hub). Align the hub so that the rope and pulleys will be on the same side as the pole seen in step 9 photo. Set your pole back over your bucket. Step 15 Remove the rubber bands from the pulleys and rope. Grasp the upper and lower pulleys and pull them apart about 6. It is very important to make sure that your rope is not twisted. Your rope should look exactly like the photo step 15. If it does not your rope is twisted. You will need to turn it counter or clock wise. Once your rope appears exactly like the photo continue with step 16 Step 15 Step 16 Step 17 Oil the pulleys with any quality oil such as 3 in 1 household oil. Oil the pulley shaft, inside and outside being sure to catch all 4 pulleys. Oiling should be done every year. Failure to oil the pulleys could cause squealing. Step 17 VERY IMPORTANT! OIL YOUR PULLEYS! It will prevent squealing Step 18 Step 19 Unfurl your rope and walk it out the full distance. Once rope is unfurled, run your hub down to the rope winder. Notice how the rope you unfurled is becoming shorter as the hub approaches the rope winder. Wrap the remainder of the rope loosely around the rope winder. Step 20 Stand your pole up an slide the pole over your ground stake. The pole can be installed by Step 16 Now we need to place the stem of the eyebolt into the hole in the pole. Again make sure your rope is not twisted. Remove the lock nut at the end of the eyebolt, insert it into the lowest hole, all the way thru the pole. Once the eyebolt is out the other side, thread the lock nut back on. Tighten the lock nut all the way up to the pole. This is easily accomplished by using a screwdriver or open end wrench on the eyebolt side, and using your 9/16 wrench Step 18 Install the rope winder (F). Measure from the bottom of the pole up, and mark the pole at 48 The rope winder came pre assembled. Undo 1 of the bolts by backing off the whiz nut, and remove the bolt. Slide the open section around your pole at your mark, reinsert the bolt and thread the whiz nut back on and tighten. Make sure your rope winder is square to the pole by using your speed square. 2007-2018 Questions or comments? Please contact SuperGourd.com or info@supergourd.com Page 4 Step 20

a single person, but please always have an extra pair of helping hands. Step 22 / Vertical predator guard. A climbing predator could use this rope to climb your pole and raid the nest. Step 21 Install the arm support braces (R). Each arm support brace is installed between the arms aligned to the corners of the hub. Install the braces by aligning the hole in the brace to the inner hole of the gourd arm as seen in the photo step 21 and use your ¼-20 x ¾ stainless bolt with nut to secure into place. Once all the braces have been installed tighten all the bolts and nuts. Step 21 Step 22 / Horizontal That s it, you did a great job! We hope you will enjoy your new rack and that it is the beginning of a great new hobby for you and your family! Maintenance: Remove gourds at end of season and clean out. If possible, remove and store your rack inside during the off season. If you remove your gourd rack and have an exposed ground stake or ground sleeve, cover the top of using duck tape (or like). This will keep water from entering (do this even if you filled your stake with concrete). Remove tape before you install the following season. Step 21 Step 22 It s time to install your gourd hanging brackets. If you choose the Vertical option you will have to enlarge the gourd hanging hole to ⅜ Each arm arm will hold a single GMA. For the vertical or horizontal choice you will need your 8 gourd mounting arms, 8 bolts and nuts and 8 hitch pins (M,N). Align the large hole in the flat part of the GMA with the hole at the end of each arm. Place a ¼ - 20 x ¾ bolt thru the GMA, flat hanging arm and out the opposite side, and thread the whiz nut on. Make sure the GMA is level and tighten. As seen in step 22 Horizontal. The pin of the GMA faces you. Be sure all the GMA s are level and tighten the from the bolt head. Next place all your gourds on your GMA s. Insert the hitch pin into the pre-drilled hole as seen in the vertical photo above. It s time to raise the gourds up. Wearing a pair of non slip gloves, unwrap your rope from around the winder. Stand about 3 feet from the pole and pull on your rope. Never stand directly under gourd rack while raising or lowering. The hub should raise with very little effort. When the hub reaches the top you will feel a stopping sensation as the pulleys meet. Holding tightly to your rope you will walk to your rope winder and wrap the excess rope around your winder. Be sure no rope is falling on the ground or that it is laying over a Check your rope for fraying. If your rope looks worn err on the side of caution and call us for a low cost replacement. You can wax your pole with any quality car wax. Oil your pulleys every year. 2007-2018 Questions or comments? Please contact SuperGourd.com or info@supergourd.com Page 5