Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015

Similar documents
Transportation Planning Division

City of Vestavia Hills Traffic Calming Policy for Residential Streets

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Richmond-Adelaide Cycle Tracks

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

City of Memphis On-Street Parking Modification Guidelines

Prince George s County plans, policies, and projects

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Thank you for attending

122 Avenue: 107 Street to Fort Road

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

City of Wilsonville 5 th Street to Kinsman Road Extension Project

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Broad Street Bicycle Boulevard Design Guidelines

Chapter 2: Standards for Access, Non-Motorized, and Transit

Tonight is for you. Learn everything you can. Share all your ideas.

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Southside Pilot Proposal

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Public Information Centre

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

CITY OF NEW ORLEANS. Department of Public Works. Baronne Street Bike Lane

Simulation Analysis of Intersection Treatments for Cycle Tracks

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Neighborhood Pedestrian Safety and Traffic Calming Study

Improve the livability of our streets by

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Transportation Planning Division

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

Downtown Davidson Pedestrian and Bicycle Safety Plan

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Bicycle Network. Vision Zero San Francisco The City and County of San

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

County of Spartanburg South Carolina

Freeway ramp intersection study

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

Traffic Calming Policy

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Complete Streets Chicago: Data Driven Design. Luann Hamilton Deputy Commissioner

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Active Transportation Facility Glossary

Military Road Safety Improvements

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

City of Memphis. To: John E. Cameron, PE City Engineer. From: Kyle Wagenschutz. Cc: Manny Belen, Randall Tatum. Date: November 5, 2015

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

Community Transportation Plan

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Appendix A: Crosswalk Policy

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Broadway Complete Streets Project

PETITION AND LETTER WRITING BEST PRACTICES

Draft North Industrial Area-Wide Traffic Plan

Borough of Danville, PA Traffic Calming Program Guidelines

St. Francis Drive through the City of Santa Fe Corridor Study

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO.

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

5. RUNNINGWAY GUIDELINES

WELCOME Public Information Centre

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

WELCOME Mission-Geneva Transportation Study

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Recommendations. Central Salem Mobility Study

Route 79/Davol Street Corridor Study

Hospital Link Project Project Update September 2017

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

VT15 / Allen Martin Drive Intersection Scoping Study

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Zlatko Krstulich, P.Eng. City of O9awa

PROJECT FACT SHEET May 25, 2018

Brief Outline of the Neighborhood Traffic Management Program (NTMP)

Display Boards Including Five Refined Design Concepts

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Highway 93 South Corridor. Planning

Public Workshop #2. September 14, 2016

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

PEDESTRIAN ACTION PLAN

Downey Road. Transportation Improvement Study

Plant City Bicycle and Pedestrian Master Plan. Project Update March 2, 2017

Pennsylvania Avenue (CR 484) Design Alternatives Study

Physical Implications of Complete Streets Policies

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

Transcription:

Riverside Drive Complete Streets Project 3 rd Community Meeting March 26, 2015

Providing Feedback Sign-In with contact information for future updates Complete questionnaire provided tonight Complete comment card to request time to speak or ask a question following the presentation

Purpose of the Project Improve safety and accessibility for residents traveling by bicycle or by foot to reach the riverfront and its attractions.

Reasons for the Pilot Project Assess feasibility of alternative roadway configuration Measure impacts to automobile traffic flows Consider design alternatives presented by public feedback and comments

Evaluating the Pilot Project Maintain the same roadway configuration as Memphis In May for 12-18 months Traffic data analysis designed to inform on the feasibility Public comments and feedback used to refine design options and address concerns not evident in traffic data

DATA COLLECTION & ANALYSIS

Summary of Traffic Data Traffic volumes along Riverside Drive remain constant during the pilot phase. No significant shifting of traffic volumes to parallel streets in downtown Traffic speeds reduced slightly compared to measures before pilot implementation, but remain well above the posted speed limit Recorded crash incidents are higher during the pilot phase than in previous periods of time

Traffic Volumes Riverside: Between Georgia & Beale Year Measured AADT 2013 13,356 Fall 2014 14,010 Winter 2015 13,166 SOURCE: CITY OF MEMPHIS DIVISION OF ENGINEERING, TRAFFIC ENGINEERING, INTERSECTION & RADAR COUNTS

Traffic Speeds Vehicle Speed (85th%) YEAR REGULATORY MEASURED 2006 40mph 47mph June 2014 (Pilot) 35mph 44mph Sept 2014 (Pilot) 35mph 38mph Jan 2015 (Pilot) 35mph 44mph SOURCE: CITY OF MEMPHIS DIVISION OF ENGINEERING, TRAFFIC ENGINEERING, INTERSECTION & RADAR COUNTS

Crash Incidents REPORTED CRASH HISTORY QTY. 2013 2014 2015 JAN 1 1 8 FEB 1 2 0 MAR 0 2 3 APR 2 2 MAY 2 0 JUNE 1 6 JULY 2 1 AUG 2 0 SEPT 1 3 OCT 2 3 NOV 2 1 DEC 2 4 TOTAL 18 25 SOURCE: MEMPHIS POLICE DEPARTMENT (MPD), Crash Reports 2013-2015

SHAPING DESIGN THROUGH PUBLIC FEEDBACK

Design Options Considered Go back to the recommendation of Mr. Speck! This is a fabulous pilot project. One bike lane on each side is the only alternative that makes any sense. A better idea is to create a dedicated bike path in the park.

On PARKING Multiple recommendations received on the best way to handle accessibility of parking near Tom Lee Park and Beale Street Landing There were some supporters of Mr. Speck s recommendation that all surface parking lots should be closed and moved to on-street parallel parking Many more comments were received, however, that emphasized the high level of current use at these parking lots, and the difficulty in function and design that onstreet parking would pose along Riverside Drive Final design considerations do not propose the closure of parking lots at Tom Lee Park or Beale St. Landing Southerners hate parallel parking. I urge you not to remove the existing parking lots associated with Tom Lee Park and Beale Street Landing. The parking lot at Tom Lee Park is used extensively. Any alternative eliminating this parking lot would be a death blow to these park users! Any scenario that closes the parking lot, or reduces it's size, would surely make the Park less accessible to the citizens of Memphis. I support reducing surface parking in Tom Lee Park and Beale Street Landing.

On THE MEDIAN Concerns were raised about the perceived danger of two-way traffic existing solely on the east side of the existing landscaped median Multiple recommendations were received about how to situate the traffic lanes and bike lanes around the median that would best serve all roadway users The current division of automobile traffic on one side of the median and bicycle & pedestrian traffic on the other side were most popular with those that indicated they were using the new bike/ped lanes Final design considerations return automobile traffic divided between the landscaped median Traffic is too fast with no median to divide traffic Re-divide north/south traffic. One bike lane on each side is the only alternative that makes any sense. When leaving my River Tower residence, it is difficult to see south bound traffic. When the street was divided you could clearly see the south and north bound. Keep [bike lanes] on the west side of Riverside. The fact that [the bike lanes] are separated by a median enhances safety and is a wonderful idea.

On CONGESTION & CRASHES Feedback indicated that congestion did become a concern during certain periods of the day or as a result of specific circumstance Turning vehicles (into Tom Lee Park) or at any of the cross streets (Beale, Georgia, Carolina) all experienced backups during heavy peak periods of automobile travel Crashes that occurred between Beale and Georgia left no room for automobiles to move around the crash site and proceed ahead. This situation causes congestion until emergency responders can make the scene and remove the barriers to travel I believe adding designated left turn lanes at intersections would benefit greatly long delays waiting for cars to turn into the Tom Lee parking lot... cruisers tying up the only through lane Turning into park cause full traffic stop. Wrecks cause full traffic stop. there is no where for cars to go around a wreck. Final design considerations will address the addition of turn lanes at key intersections and provide clear access in case of crash

On PEDESTRIAN ACCESS Concerns were raised about the difficulty of crossing Riverside Drive as a pedestrian due to relocating automobile traffic to east side of landscaped median Even though the crossing distance was half of its original configuration, pedestrians noted that the frequency of automobiles left little time for breaks in traffic, resulting in increased time waiting to cross Few pedestrians used the designated pedestrian lane finding the park trails more attractive and preferred for use Final design considerations return automobile traffic divided between the landscaped median and do not contain any designated pedestrian space within the roadway width the lack of use by pedestrians is extremely low even on weekends. No one uses the pedestrian lane. You can go out on any given day and find people running/walking/biking on the sidewalk through the park. People choose to use that instead. I think it is a really good idea to give pedestrians a chance to pause between the lanes it would make me less nervous to have to try to gauge both directions at the same time to cross with my two dogs.

On BEALE STREET Transition to the pilot configuration at the Beale Street intersection was a cause of concern for all roadway users Crash incidents at this intersection increased during the pilot phase as drivers sought to jockey for position within the transition area Despite its origin as a pilot configuration, many users urged for future improvements that would enhance its connectivity and access for bicycle and pedestrian use recommend a turn signal to be installed for south bound traffic turning [east] onto Beale Street. Need a crosswalk at Beale Street like the one on the south end of Riverside. I would like to see the bike lane extended to the Welcome Center. Final design considerations will include continuation of all lanes and access north to Jefferson Ave/Bass Pro Drive.

On I-55, CAROLINA, & GEORGIA Concerns related to turning vehicles, pedestrian crossings, and traffic speeds at this intersection existed prior to the pilot configuration Multiple users provided feedback related to the continuation of these problems under the pilot despite increased measures to bring visibility to the I-55 transition area Under the current conditions, there are not enough vehicles to warrant a traffic signal, but the conditions will continue to change as TDOT begins work on the Crump/I-55 interchange. Final design considerations will seek to minimize the negative impacts to travel at these intersections while TDOT s Crump/I-55 interchange project in constructed turning left from Georgia and Carolina onto 55 is a nightmare during rush hour...motorists coming off the interstate with traffic immediately narrowing to one lane (thus backing up traffic on the interstate during busy times) Access to I-55 from Georgia or Carolina are nearly impossible due to the traffic change. I believe there should be some solution for traffic coming off 55 entering residential traffic at Georgia..

On FRONT STREET Concerns were raised about pedestrian activity along Front Street as it relates to residents accessing Riverside Drive via the Riverwalk and stairways from Huling Multiple recommendations were received on raising visibility of pedestrian activities in this area including crosswalks, warning signs, and curb extensions Crossing S. Front Street is dangerous. Residents should not have to run for their lives crossing the street. [Huling and Front Street] is a very active intersection due to the access to the popular Riverwalk We'd like to see better crosswalks on Riverside and on Front Street. Final design considerations for curb extensions and crosswalks at Front/Huling are being prepared for installation

FINAL DESIGN CONSIDERATIONS

ALTERNATIVE A

ALTERNATIVE B

FRONT ST - FINAL DESIGN

TIMELINE FOR COMPLETION

Final Project Timeline Pilot configuration will remain in place until the end of Memphis In May Median modifications will occur prior to Beale Street Music Festival Following the end of Memphis In May, city crews will work to repave and restripe the roadway south of Beale Street Any necessary signal modifications at Beale Street or other transitional striping or signage will be installed following repaving work Repaving north of Beale Street will occur sometime in early 2016 in accordance with already planned paving program TDOT s I-55/Crump Interchange project is currently scheduled to bid in December 2015. Under that timeframe, construction would begin around this time next year.

Providing Feedback

Providing Feedback Sign-In with contact information for future updates Complete questionnaire provided tonight Offer additional comments in writing in comments section or through email, mail, telephone, etc.

Providing Feeback

Providing Feeback Visit Website - www.memphistn.gov/riversidedrive Email - engineering@memphistn.gov Mail - City of Memphis Traffic Engineering 125 North Main Street, Suite 668 Memphis, TN 38103 Telephone - (901) 576-6710