Table 3. Summary of Proposed Roadway and Intersection Improvements. Suggested Sponsoring Agency Township Deficiency Noted

Similar documents
May 4, Dear Mr. Thomas and Mr. Snyder,

Appendix C: Comments

2016 IHDA Opportunity Areas (October 2015) County Census Tract (if Applicable) Expiration Year COOK

Improved bike routes coming to Chicago suburbs

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Transportation Improvement Plan SECTION2

Village of Downers Grove Bicycle and Pedestrian Plan

Planned Improvements from Sector & Area Plans that have been added to the MTP

DUPAGE COUNTY ON-ROAD BICYCLE CONNECTION GUIDELINES

Neighborhood Traffic Study Area Number 5

Regional trends in walking and biking Transport Chicago conference. June 9, 2017

Appendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP

(In)Complete Streets

Existing Data. City of Mauston. Legend " 58 " 82 " 16. ù ù. ù Pedestrian. Miles !G!G. !G ù. Sidewalk Location. Crash Type ( )

2012 Capital Budget Capital Improvement Program

Modest Improvements for More Bicycle-Friendly Road Projects

BICYCLE PLAN for WAYNE TOWNSHIP

West End Connectivity Master Plan

MASTER BICYCLE AND PEDESTRIAN PLAN

Non-Motorized Transportation 7-1

IDOT Suspends Non-Emergency Road Work for Memorial Day Holiday Weekend Lanes Opened to Improve Traffic Flow

ESCC VARSITY GIRLS TENNIS CHAMPIONSHIPS October 8 & 9, 2010 (Revised 9/30/10)

Bicycle and Pedestrian Level of Service Measures

Suburban Bikeways for All

US Bicycle Route 1 Summary Report: Selection of Preferred Route

Bicycle Plan. introduction table of contents 1

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

I-10 Bypass Project Banning to Cabazon

APPENDIX M FOR THE JEFFERSON COUNTY PORTION OF THE VISION 2050 PLAN RECOMMENDATIONS MILWAUKEE URBANIZED AREA INTRODUCTION

Bicycle & Pedestrian Plan

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

NOTICE OF PUBLIC HEARING

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Duwamish Way-finding and CTR Report

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

Act 47 Exception Application Process (Permitting Bicycle Travel on Freeways)

Agenda Item No. 6C ATTACHMENT 1

3.9 Recreational Trails and Natural Areas

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

2.0 Existing Conditions

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Central Harlem Avenue Corridor Study

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

ARLINGTON COUNTY, VIRGINIA

MONTGOMERY METROPOLITAN PLANNING ORGANIZATION (MPO) BICYCLE AND PEDESTRIAN PLAN

U.S. Route 45 (IL 132 to IL 173 and Millburn Bypass) Frequently Asked Questions

5 CIRCULATION AND STREET DESIGN

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

CITY OF SOUTH DAYTONA

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Chapter 7 Nonmotorized Facilities

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Carbondale to Murphysboro Bike Route JACKSON COUNTY

Beyond the Highway. Tale of the Trails. Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Bicycle/Pedestrian System Master Plan

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Route 28 Critical Locations Bicycling Network Connectivity November 2017

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

The Richland County Transportation Penny Program. September 21, 2015

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Lynchburg District Update

Sponsored By: Support From:

Project Description Form 8EE

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Color your stress away

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

IL Route 71 Construction Update

Chicago Department of Transportation Bikeways - Year in Review

Prince George s County plans, policies, and projects

KANE COUNTY BICYCLE AND PEDESTRIAN PLAN

Chapter 3 DESIGN SPECIFICATIONS

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Chapter 5 Future Transportation

Roadway Network Development Plan FINAL

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

Objective: Coordinate with agencies affected by the implementation of this plan.

IDOT Highway District 2:

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

MIAMI & ERIE CANAL SHARED USE TRAIL

Basalt Creek Transportation Refinement Plan Recommendations

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of October 20, 2018

FY 2006 TRANSPORTATION CAPITAL PROGRAM

APPENDIX I-A Kings County Regional Transportation Plan. Appendix A Page A-1 STATE ROUTES

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO.

ACTIVE TRANSPORTATION

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Committed to Service

Board of Supervisors February 27, 2017

A copy of the draft plan is available at:

PRESS RELEASE San Joaquin Council of Governments

Route 7 Corridor Study

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

3.0 PROJECT DESCRIPTION

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Transcription:

22nd 22nd 55th and Holmes Intersection s 1 Table 3 Summary of Proposed way and Intersection s Sponsoring Agency Deficiency Noted Briarcliffe Boulevard to Park Wheaton, Glen Ellyn MIL Poor roadway Glen Ellyn improvement Boulevard 1997-1999 North Lake to Vista Oakbrook Terrace YRK 12' right lane w/no shoulder; Hazardous Intersection DuDOT 3 DGN N/A 79 th Greene to Wherli Lisle LIS 12' right lane w/no shoulder; 83 rd /Montgomery Frontenac to Book Naperville, Aurora NAP 12' right lane w/no shoulder; 1995-2005 87 th Book to Modaff Naperville NAP 12' right lane w/no shoulder; 97 th Jackson to Madison Burr Ridge, Darien DGS 10' right lane w/no shoulder; Arlington Heights Devon to Theodore DuDOT 3, Itasca ADD 11' right lane w/no shoulder; Lane Army Trail Boulevard Lombard to Mill Addison ADD 11' right lane w/no shoulder; Bloomingdale Edgewater to Raven DuDOT 3 BLM Posted speed 0 w/no (Bloomingdale) Lane shoulder Bloomingdale (Itasca) West of Lombard to Walnut Itasca ADD 10' right lane w/no shoulder Bloomingdale /CCP Bridge a Barrier for DuDOT 3 (PTZ872) BLM N/A Bridge Bicycle/Pedestrian Travel Bluff Bikeway Cass to Jackson Downers Grove DGS 11' right lane w/no shoulder; accommodation Book Rickert to County Line Naperville NAP 11' right lane w/no shoulder; 1995-2000 Butterfield Shoulder s I Kautz to EJ & ERR IDOT WIN N/A 1

Summary of Proposed way and Intersection s Deficiency Noted Sponsoring Agency Cass Burlington to Quincy Westmont DGN 11' right lane in commercial area; railroad crossing Clarendon Hills 79 th to 87 th Downers Grove DGN 12' right lane w/no shoulder; 3osted speed 35 Commercial Grove to Wood Dale Wood Dale ADD Poor crossing at Wood Dale; truck traffic; non-residential area County Farm Army Trail to Schick DuDOT 3 WAY 12' right lane w/no shoulder; 1996-2000 County Farm Stearns to Ontarioville County Farm Bicycle Geneva to Founders Accommodation 1 Park (Winfield) County Line 77 th to Plainfield 3osted speed 35 DuDOT 3 WAY 12' right lane w/no shoulder; 3osted speed 0 DuDOT 3 WIN 11' right lane w/no shoulder; Cook County DGN 10-13' right lane w/no shoulder; ; expy. ramps 1996-2000 Crescent Boulevard Riford to 1-355 DuDOT 3, Glen Ellyn MIL 11' right lane w/no shoulder; Diehl Mill to West DuDOT 3 NAP 11' right lane w/no shoulder; 1995-2005 Diehl Illinois Prairie Path to Bond Naperville NAP 12' right lane w/no shoulder; 1995-2005 Eola East New York to DuDOT 3 NAP way under Illinois Prairie Path construction Foster Illinois 83 to York Bensenville ADD Hazardous conditions present (pavements, trucks, railroad) FY-1997 Galusha way Winfield to Herrick Warrenville WIN N/A 1 Gary's Mill Purnell to Winfield West Chicago, Winfield WIN 10' right lane w/no shoulder; Glen Ellyn Windy Point to North DuDOT 3 BLM 12' right lane w/no shoulder; 2

Summary of Proposed way and Intersection s Sponsoring Agency i Deficiency Noted Greene 75 th to 79 th Lisle LIS 11' right lane w/no shoulder; Hawthorne Lane 2 lngalton west to Wayne, Winfield WAY 11' right lane w/no shoulder; proposed trail, West Hawthorne Widening and Sidewalk Addition Chicago Wheaton (Hawthorne Elementary School Wheaton) DuDOT 3 WIN 10' right lane w/no shoulder; FY-1996 MIL N/A High Lake Winfield to Sunset High Ridge Westmore to Lombard YRK Poor pavement Ardmore Hobson (Shoulder Oleson and Oxford s DuDOT 3 LIS 10' right lane without a paved improvement) 1 shoulder Indian Knoll Illinois Prairie Path to Winfield WIN 10' right lane w/no shoulder; Hawthorne Lane Jewell Illinois Prairie Path to Gary DuDOT 3 MIL 10' right lane w/no shoulder; Joliet Oldfield to Cass Darien DGS 10' right lane w/no shoulder; Joliet Madison to County Burr Ridge DGN 12' right lane w/no shoulder; Line Kautz Roosevelt to North West Chicago WAY, WIN Posted speed 0 w/no shoulder Leask Lane (Shoulder Regency Woods to Wheaton MIL Poor shoulder ) 1 Danada Forest Preserve Lemont Beller Lane to Central DuDOT 3 DGN 12' right lane with no shoulder; Liberty County line to Illinois Route Aurora, Naperville NAP 10' right lane w/no shoulder; 59! Mack Illinois 59 to Shaffner Wheaton, Winfield WIN 11' right lane w/no shoulder; 3

Table 3 Summary of Proposed way and Intersection s Sponsoring Agency Deficiency Noted Madison 97 th to 91 st Burr Ridge DGS 9' right lane w/no shoulder; poor pavement Main (Glen Ellyn) North to St. Charles DuDOT 3 MIL 12' right lane w/no shoulder; Bicycle Accommodation Manchester Winfield to County Farm Wheaton, Winfield WIN 11' right lane w/no shoulder; poor pavement Maple Steeple Run to DuDOT 3 LIS 12' right lane w/no shoulder Cascade Mayo Paula to Westhaven Wheaton MIL Poor pavement Montgomery Frontenac to Walcott Aurora NAP 12' right lane w/no shoulder; Court Morton From Birchbark Trail to Lies Carol Stream/Wayne WAY 12' right lane w/no shoulder; Morton From Pawnee to St. Carol Stream/Wayne WAY 12' right lane w/no shoulder; Charles Old Plank Columbia to Tuthill Naperville LIS 12' right lane w/no shoulder; 1995-2005 Orchard Red Maple Lane to Illinois Wheaton MIL 10' right lane w/no shoulder; Prairie Path Patterman Prairie to Webster Warrenville WIN 13' roadway; poor pavement 1999-2005 Paula Mayo to Westhaven Wheaton MIL Poor pavement Pleasant Hill Great Western Trail to Winfield, Milton MIL 11' right lane w/no shoulder; Jewell Purnell Gary's Mill to Winfield Winfield WIN 11' right lane w/no shoulder; Rickert River to 75 th Naperville NAP 12' right lane w/no shoulder; Rickert Book to Sanctuary Lane Naperville NAP 12' right lane w/no shoulder; River 1 Ogden to Raymond DuDOT 3 NAP 11' right lane w/no shoulder; 1995-2005

Summary of Proposed way and Intersection s Sponsoring Agency Deficiency Noted Roosevelt 1 Winfield to Shaffner IDOT WIN N/A Roselle Foster to Picton DuDOT 3 BLM Posted speed 5 w/no shoulder Schick Thorn to Cardinal DuDOT 3, BLM 12' right lane w/no Bloomingdale shoulder; Schick Carriage Way to Bartlett, West Chicago WAY 12' right lane w/no Woodlake shoulder; Spring Adams to Glendale Oak Brook YRK Poor sight lines; grade choices Springfield Lake to Butterfield Bloomingdale BLM 11' right lane w/no shoulder; St. Charles (Shoulder Newton to Western Av. DuDOT 3 (PTZ88) MIL N/A 1995-2005 ) 1 Summit 1 th to Morningside DuDOT 3 YRK 12' right lane w/no Warrrenville (Shoulder ) 1 Washington Shoulder installation on segments where deficient Iroquois to Warrenville DuDOT 3 shoulder; N/A NAP, LIS, DGN Naperville LIS 11' right lane w/no shoulder; FY-1996 Wehrli Lisson to Culpepper Naperville LIS 12' right lane w/no shoulder; Wehrli way 1 77 th to Hobson DuDOT 3, Naperville LIS N/A Winfield Wood Dale Wood and CNW Railroad X-ing Gary's Mill to Manchester 3rd to Sherwood Hazardous Crossing Winfield WIN 12' right lane w/no shoulder; DuDOT 3 ADD 11' right lane w/3' shoulder; West Chicago (PTZ925) 3osted speed 0 WIN N/A Woodward 75 th to 71 st Woodridge DGN 12' right lane w/no shoulder; 5

Summary of Proposed way and Intersection s Sponsoring Agency Deficiency Noted York Fuller to Glendale Hinsdale DGN 12' right lane w/no shoulder; York /I-290 Hazard Hazardous Intersection IDOT (Churchville ADD N/A J.H.S. - Elmhurst) York /Lake Hazard Hazardous Intersection IDOT (Churchville J.H.S.- Elmhurst) ADD N/A N/A = not available 1 Potential project suggested by the public 2 Winfield portion of this road rated Class A for suitability. 3 Specifically in reference to those projects involving county roadways under the jurisdiction of DuPage County Division of Transportation (DuDOT), it is the position of DuDOT that existing facilities (e.g., sidewalks, gravel paths, etc.) which already exist may not be replaced because of cost and right-of-way considerations. It is also possible that many of the suggested improvements recommended in the plan may not be constructed because of cost and right-of-way requirements. Probable bicycle improvements made by DuDOT may range from sidewalks to gravel paths with some meeting AASHTO recommended standards. DuDOT estimates that 50% of the proposed linkages may be added within the next 10 years and that the entire plan of linkages may not be feasible to implement in less than 20 years. Abbreviations for townships ADD = Addison BLM = Bloomingdale DGN = Downers Grove North DGS = Downers Grove South LIS = Lisle MIL = Milton NAP = Naperville WAY = Wayne WIN = Winfield YRK = York 6