US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Similar documents
2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Omaha s Complete Streets Policy

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Lawrence Avenue Streetscape Concepts August 30, 2011

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Broad Street Bicycle Boulevard Design Guidelines

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

5 Circulation & Parking

Transportation Planning Division

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

DEKALB COUNTY. 22. Priority Projects for DeKalb County

C C C

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Lynchburg District Update

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Commercial-Vista Corridor Plan Project Management Team. Judith Johnduff, AICP, Associate Transportation Planner Public Works Department

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

5. RUNNINGWAY GUIDELINES

Washington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd.

OCALA/MARION TPO CITY OF BELLEVIEW CORRIDOR PLAN STUDY PRESENTATION TO THE BELLEVIEW CITY COMMISSION JANUARY 25, :00 PM

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

City of Wausau Wausau Center Urban Design and Transportation Master Plan. Design Workshop // October 18, 2018

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Active Transportation Facility Glossary

The DC Pedestrian Master Plan

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Ottawa Beach Road Study

Chapter 3: Multi-Modal Circulation and Streetscapes

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Cycle Track Design Best Practices Cycle Track Sections

Blair/Williamson Intersection Expressed Needs

Seattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Bicycle Facilities Planning

Physical Implications of Complete Streets Policies

Sandwich Pedestrian/Bicycle Planning

PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS

NJDOT Complete Streets Checklist

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Designing Complete Streets: What you need to know

Complete Streets Training. Georgia Municipal Association June 27, 2016

Geary Bus Rapid Transit Project

Feasibility Study. Expo-Downtown Bicycle Connector

Road Diets FDOT Process

54 th Avenue North Complete Streets Concept Plan

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Dra Design and Land Use Op ons Booklet

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Executive Summary Route 30 Corridor Master Plan

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

COMMUNITY MEETING AGENDA

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

COMPLETE STREETS PLANNER S PORTFOLIO

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Draft North Industrial Area-Wide Traffic Plan

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Bay to Bay Boulevard Complete Streets Project

Chapter 5. Complete Streets and Walkable Communities.

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Figure 1: Vicinity Map of the Study Area

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Pedestrian & Bicycle Safety Innovations & Applications

Albany Shaker Road Corridor Study Public Meeting # 2

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Frequently Asked Questions

Monroe Street Reconstruction

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Bellevue Downtown Association Downtown Bike Series

6.4 RECOMMENDED IMPROVEMENTS

Multi-Modal Traffic Analysis. Parisi and Associates

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Public Workshop #2. September 14, 2016

Public Information Centre

Freeway ramp intersection study

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

ITE Northeastern District Meeting

PUBLIC REALM MASTER PLAN

Bicycle & Pedestrian Advisory Committee

Transcription:

US 278 Corridor Concept Presentation Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Thanks to our Partners Atlanta Regional Commission Georgia Department of Transportation DeKalb County Traffic Engineering Thanks to our Local Support Board of Mayor and Commissioners Administration Associates Community Resident Volunteers and Participants

The feasibility study A follow-up to the downtown master plan Explores road diet, crosswalk and intersection treatment recommendations in more detail Prepares a Concept Report to formally launch a project with GDOT

Sequence of Events N D J F M A M J J A S O N D J F M A M 2013 2014 2015 Today s meeting: Presenting details of an emerging concept design Incorporating feedback Understanding partner agency responses Discussing options for moving forward

December Design Day Understand the feasibility study Learn more about street and intersection design options (road diets, roundabouts) Set up a demonstration project outside

December Design Day

December Design Day

December Design Day

December Design Day

Recommendations

The Road Diet Master Plan s principal recommendation Uses existing ROW and converts five-lane cross section to three lanes Bike lanes throughout corridor; expanded buffers and sidewalks on north side

Pedestrian Refuge Islands Complements the roundabout for safer midblock crossings Proposed near Maple and Oak Additional crossings/medians may be possible given driveway locations and key pedestrian desire lines

US 278/Clarendon Avenue Roundabout Places roundabout at main N Clarendon/278 intersection, with partial closures to South Avondale Road and Plaza

The roundabout at Clarendon Options: Larger Circle A single-circle roundabout with two lanes in the roadway can handle traffic however, this has a substantially greater impact on historic property.

The road diet and traffic Today s Traffic Intersection Levels of Service (PM) C A A A A C Sams Crossing Lvingston/Maple Twin Oaks Shopping Center/Pine/ South Avondale Rd Oak Clarendon

The road diet and traffic Road Diet Installed Intersection Levels of Service (PM) C C A B A C Sams Crossing Lvingston/Maple Twin Oaks Shopping Center/Pine/ South Avondale Rd Oak Clarendon

The road diet and traffic Road Diet and Future Traffic Intersection Levels of Service (PM) D D C D B C Sams Crossing Lvingston/Maple Twin Oaks Shopping Center/Pine/ South Avondale Rd Oak Clarendon

The road diet and traffic How does the corridor really work for you? AM Peak (westbound is peak direction) Eastbound Travel Time Westbound Travel Time Today s road and traffic 1.9 min 4 min Today s traffic with the road diet 1.9 min 3.6 min 2024 traffic and road diet 1.95 min 5.2 min

The road diet and traffic How does the corridor really work for you?

The road diet and traffic How does the corridor really work for you? Outside of Avondale Estates and eastern Decatur, the corridor is already 2 lanes

The road diet and traffic How does the corridor really work for you? PM Peak (eastbound is peak direction) Eastbound Travel Time Westbound Travel Time Today s road and traffic 2.2 min 2.3 min Today s traffic with the road diet 2.9 min 3 min 2024 traffic and road diet 4 min 3.6 min

The road diet and traffic How does the corridor really work for you? Worst-case estimated changes, compared to today s commute times Road diet with today s traffic Road diet with future traffic Morning peak-hour travel 25 seconds less 1 min, 5 sec Afternoon peak-hour travel 45 seconds 1 min, 50 sec

The road diet and traffic How does the corridor really work for you? Worst-case estimated changes, compared to today s commute times Road diet with today s traffic Road diet with future traffic Morning peak-hour travel 25 seconds less 1 min, 5 sec Afternoon peak-hour travel 45 seconds 1 min, 50 sec Is this a worthwhile tradeoff for a safer, more attractive street?

Concerns we incorporated Community concerns: What about new development? Will intersection changes at Clarendon cause too much queuing? GDOT constraints: Generally not inclined to accept lower levels of service Lack of good alternative routes in statewide system Sams Crossing intersection remains a significant challenge, as does Candler Street (in Decatur)

Options

Corridor Design Options Three-lane section: Works if the traffic can be accommodated Some intersections may need spot capacity improvements Other options may be considered (traffic signals, rethinking driveway access Four-lane section: Addresses capacity concerns Typical section may continue to include bicycle lanes and medians for mid-block crossing Turn lanes restored where needed at intersections

Clarendon Avenue Intersection Three-lane section: Keeps angled parking, introduces bike lanes Potential added crossing at Center

Clarendon Avenue Intersection Four-lane section: Keeps angled parking, similar to today s design Potentially straightens eastbound/westbound paths

Oak Street Intersection Three-lane section: Introduces short medians to help crossings Expands planter strip area

Oak Street Intersection Four-lane section: Longer median easier with two lanes Mid-block crossing less likely to interfere with queues

3-Lane Typical Section Hedge Row Three-lane section: Introduces short medians to help crossings Expands planter strip area

3-Lane Typical Section Crossings Rectangular Rapid Flashing Beacon: Can be used with lower volumes Accepted on two-lane street crossings (one lane per direction)

3-Lane Typical Section Crossings Image source: Sprinkle Consulting

3-Lane Typical Section Crossings

3-Lane Typical Section Crossings

4-Lane Typical Section Hedge Row Medians can be longer with sufficient clear width Within same ROW, planter strip may be narrower

4-Lane Typical Section Crossings Pedestrian Hybrid Beacon: Typically what is used for higher-volume, multi-lane streets Traffic comes to a full stop at a red light not only when the pedestrian is in their path

4-Lane Typical Section Crossings

Pine Street Intersection Three-lane section: Introduces short medians to help an Olive crossing Continues bicycle lanes

Pine Street Intersection Four-lane section: Lengthens median on approach to Olive Allows additional storage capacity at Pine/S. Avondale

Twin Oaks Apartments Three-lane section: Introduces short medians to help the signalized crossing Provides additional space for north-side landscaping

Twin Oaks Apartments Four-lane section: Can keep short median and protected crossing May be able to expand sidewalk without added ROW

3-Lane Typical Section West of Olive Short medians also used at crossings South sidewalk added; at least one planter strip in existing ROW

4-Lane Typical Section West of Olive Medians not used as frequently until access management approaches implemented Planter strips and sidewalks may mean additional ROW

Sams Crossing/Arcadia Avenue Three-lane section: Transitions back to five lanes to add storage capacity Eastbound lane merges prior to Dalerose

Sams Crossing/Arcadia Avenue Four/Five-lane section: No change from current design, although sidewalks added along north side of corridor

Potential Strategies for Traffic Remove Oak Street Signal Pros: One less signal for stopping Crossing can remain Cons: Signal likely to be important for future development

Potential Strategies for Traffic Pine/South Avondale/Shopping Center Pros: Gives more green to 278 Addresses design Cons: No easy alternatives for shopping center, S. Avondale

Next Steps Consensus on corridor concept Complete ARC project funding application Continue exploring alternatives for pursuing road diet Begin access management strategy with GDOT partnership