February 26, 2013 Presentation Overview of Proposed Roadway Network and Intersection Improvements Bond Program

Similar documents
I-10 AT SCENIC LOOP RD. Open House

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

Diamond Springs Parkway Project

Knox Street Complete Streets Project

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study. Second Public Meeting February 6, 2018

Frequently Asked Questions

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

SIDEWALK ASSESSMENT PHASE TWO

Readington Road (C.R. 637) Construction

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

US 19 PEDESTRIAN AND BICYCLE SAFE ACCESS

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

CSAH 101 Preliminary Design

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Legislative Update Williamsburg Residency

Henderson Ave. Complete Streets Project

Southcote Road Improvements Class Environmental Assessment Study

PROPOSAL: Review of Alaska DOT&PF project 68471, Glacier Highway reconstruction and pedestrian improvements from

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 21, 2017

CTH M Reconstruction

Traffic Calming Policy

2016 Neighborhood Street Fund Application

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

122 Avenue: 107 Street to Fort Road

Reams Road RCA Study. Board of County Commissioners Public Hearing

a 20 year period. separate phases of development with staggered years)

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

5 Transit & Traffic. Overview

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Souder, Miller & Associates 401 W. Broadway Farmington, NM

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

Designing with the Railroad

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Technical Advisory Committee Meeting

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

MASTER BICYCLE AND PEDESTRIAN PLAN

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Carmel, Indiana Illinois Street and 126th Street Westfield Boulevard and 96th Street Arts and Design District RAB

HIGHWAY 401 WIDENING SECOND LINE WEST STRUCTURE

Bicycle and Pedestrian Plans and Improvements

Bikeways Network and Facilities

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

RM 620 FEASIBILITY STUDY

Designing for Pedestrian Safety

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

This page intentionally left blank.

3.0 Future Conditions

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

Fleur Drive Reconstruction

APPENDIX D COST SUMMARY TABLES

2016 MOBILITY BOND PROGRAM

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Bradford s Landing. Preliminary Plan Abandonment AB753 & AB754 MONTGOMERY COUNTY PLANNING DEPARTMENT

City of Fairfax, Virginia City Council Work Session

CONTENTS EXECUTIVE SUMMARY 1

Short and Long Term Needs

Bonners Ferry US 95 South Hill Report

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Shore Drive Safety Task Force. Report to the SDAC

Improve the livability of our streets by

WELCOME TO OPEN HOUSE # 1 June 14, 2017

CASTLE CREEK CORRIDOR PLANNING PUBLIC OPEN HOUSE

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

West LRT Workshop Session Welcome Stony Plain Road from 149 Street to 124 Street May 12, 2010

Safety Impacts: Presentation Overview

TABLE OF CONTENTS. Executive Summary

Cincinnati Dayton Rd Widening

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

REPORT OF MEETING DOWNTOWN CROSSING PHASE 2 PUBLIC INFORMATION MEETING. Ives Main Library 133 Elm Street, New Haven, Connecticut September 29, 2014

Community Workshop on the Benefits of a Walkable & Bikeable Community

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

SRTS IMPLEMENTATION COSTS

Building Great Neighbourhoods BONNIE DOON

Transcription:

February 26, 2013 Presentation Overview of Proposed Roadway Network and Intersection Improvements Bond Program Excellence - Integrity - Service - Creativity - Communication

TRANSPORTATION BOND PROGRAM ADVISORY COMMITTEE LAMAR STREET PECAN STREET and OLIVE STREET Description: With removal of Couplet (March 2012), consider improving roads to provide better traffic circulation, more on-street parking, sidewalks, street lighting and traffic signalization. Install concrete streets in accordance with the Old Town Keller typical street cross section (31-foot wide roadway with 18.5-foot perpendicular parking on both sides) for all streets. Costs include engineering, 6-foot wide sidewalks on both sides of street, street lighting, drainage improvements for all streets, and a traffic signal on US Hwy 377 at Pecan Street. Est. Total Project Cost: $1,484,000 Est. Cost Breakdown: Lamar St (Golden Triangle to Pecan) = $1,006,000; Pecan St (remainder) = $97,000; Olive St (Lamar to US 377) = $156,000; (Traffic Signal on US Hwy 377 at Pecan St = $225,000, included) Eng. Contract Length: 6 months ROW Acquisition: None required Estimated Construction Time: 9 months

LAMAR STREET PECAN STREET OLIVE STREET TRAFFIC SIGNAL AT US HWY 377 & PECAN STREET

TRANSPORTATION BOND PROGRAM ADVISORY COMMITTEE ELM STREET and PECAN STREET Description: With removal of Couplet (March 2012), consider improving roads to provide better traffic circulation, more on-street parking, sidewalks, and street lighting. Install concrete streets in accordance with the Old Town Keller typical street cross section (31-foot wide roadway with 18.5-foot perpendicular parking on both sides) for both streets. Costs include engineering, 6-foot wide sidewalks on both sides of street, street lighting, and drainage improvements for both streets. Est. Total Project Cost: $1,345,000 Est. Cost Breakdown: Elm St (FM 1709 to Pecan) = $1,006,000; Pecan St (Elm to US 377) = $339,000 Eng. Contract Length: 6 months ROW Acquisition: None required Estimated Construction Time: 9 months Comments: If warranted, intersection improvements may be needed at Elm St. and Pecan St. The design and traffic signals costs may be approximately $225,000, not included in above project costs.

ELM STREET PECAN STREET

Intersection Improvements for Consideration

TRANSPORTATION BOND PROGRAM ADVISORY COMMITTEE BEAR CREEK PARKWAY at ELM STREET / WHITLEY ROAD Description: Proposed traffic signal installation at intersection. Est. Total Traffic Circle Project Cost: $506,250 Est. Cost Breakdown: Design = $75,000; Construction = $431,250 Eng. Contract Length: 6 months Est. ROW Acquisition: 6 months Estimated Construction Time: 10 months 2012 Total Traffic Movements: 32,830 Estimated Total Traffic Circle Project Cost: $932,000 Design = $125,000; ROW = $88,000; Construction = $719,000 Proposed single lane concrete traffic circle in 180 diameter ROW with sidewalks.

TRANSPORTATION BOND PROGRAM ADVISORY COMMITTEE BEAR CREEK PARKWAY at ELM STREET / WHITLEY ROAD BEAR CREEK PARKWAY at ELM STREET / WHITLEY ROAD INTERSECTION Proposed traffic signals.

Intersection Improvements: Bear Creek Pkwy. at Elm St./Whitley Rd. Intersection City of Keller Intersection Accident Report 11/1/10 11/29/12 Major Accidents Minor Accidents Bear Creek @ Elm/Whitley 1 3

Questions from the Committee

How many parking spaces are existing on Elm Street and Pecan Street? How many will be created? How many single family residences front Elm Street? There are 26 existing parking spaces on Elm Street; 265 will be created. There are 10 single family residences that front Elm Street between the intersection of FM 1709 and Pecan Street. There are 74 parking spaces on Pecan Street.

How many parking spaces are existing along Lamar St./west of US 377? How many will be created with the proposed improvements? Existing parking spaces in Old Town on the west side of US 377, including all existing parking lots, is 265. Total proposed parking spaces with proposed extension of Lamar Street from Hill Street south to Pecan Street, then on Pecan Street and on Olive Street extension will be 451. This equals 451 total spaces.

Response from TXDOT regarding a pedestrian crossing if a traffic signal is installed at Pecan St. TXDOT stated a pedestrian crossings on US 377 is possible at a signalized intersection. They would consider an underpass or overpass pedestrian crossing at the city s cost and city s long term maintenance.

QUESTIONS? All meetings of the Transportation Bond Program Advisory Committee are open to the public, who are invited to listen, observe and provide feedback. For more information regarding the Transportation Bond Program Advisory Committee, the projects it is considering and its upcoming meeting times, please visit the following link: www.cityofkeller.com/transportationbondcommittee Questions regarding the Transportation Bond Program Advisory Committee and/or requests for more information should be directed to: Chris Fuller, Deputy City Manager Steve Polasek, City Manager Phone: 817 743 4003 Phone: 817 743 4002 Email: cfuller@cityofkeller.com Email: spolasek@cityofkeller.com Greg Dickens, Public Works Director Phone: 817 743 4081 Email: gdickens@cityofkeller.com