Projects in bold are in the Development Area. Projects in bold and in italics are new on this year's priority list

Similar documents
ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report September, 2011

Route 29 Solutions Projects

Appendix A: Grouped Projects Projects by Grouping (FHWA Format)

Secondary System Albemarle County Construction Program Estimated Allocations

Chapter 5 Future Transportation

Memorandum. From: Jakob zumfelde, Transportation Planner Date: November 7, 2018 Reference: Long Range Transportation Plan

PRELUDES VISIT HANDBOOK (updated December 2015)

PRELUDES VISIT HANDBOOK (updated September 2016)

Bicycle and Pedestrian Master Plan Status Update (as of Dec. 2017)

Secondary System Albemarle County Construction Program Estimated Allocations

Memorandum. Purpose: To update the MPO CTAC on the status of the LRTP scenario evaluation process.

Crozet Community Advisory Committee Crozet Library Wednesday, January 16, 2019 from 7:00 PM to 8:45 PM

Charlottesville - Albemarle Rescue Squad

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE

Regional Goals. The UnJAM process also developed regional mobility goals including:

REDISTRICTING ADVISORY COMMITTEE September 22, 2015 Committee Meeting #7

2012 Capital Budget Capital Improvement Program

TRASBURG RANSPORTATION

! " Land Use/Green Infrastructure Questions:

5 th & Avon Community Brainstorm

COST (1000s) NEW INTERSTATE FACILITY FROM MISSOURI STATE LINE TO I-24 AT PADUCAH. SEE CONVENTIONAL INTERSTATE DESIGN A0066 BALLARD

RIDE III PROPOSED PROJECTS. April 2015

The Year Ahead: Virginia Department of Transportation Northern Virginia District

MONTGOMERY METROPOLITAN PLANNING ORGANIZATION (MPO) BICYCLE AND PEDESTRIAN PLAN

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Transportation Committee Project Priority List

STUDY ADVISORY COMMITTEE. October 8, 2015

Technical Memorandum TO: Joel DeNunzio, P.E. Residency Administrator Charlottesville Residency FROM:

2017 (FY 21,22,23) Ohio CMAQ Project Selection

Engineering - Bicycle and Pedestrian

VIII. Project Prioritization & Implementation

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Charlottesville Regional Chamber of Commerce. October 28, 2014

Agenda Item No. 6C ATTACHMENT 1

PURCHASE ADD KYTC UNSCHEDULED PROJECTS LIST DECEMBER 2010

SHENANDOAH FARMS SANITARY DISTRICT

2019 Federal Transportation Improvement Program

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Pedestrian Improvements Prepared by Neighborhood Development Services November 2012

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Rio Mills Rd/Berkmar Dr Extended Connection

Rio Intersection Traffic Restrictions Begin Monday

CHAPTER 5 TRANSPORTATION GOAL

2017 (FY 21,22,23) Ohio CMAQ Prioritization

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

2015 Data review. Capturing Ready Lane NEXUS vehicles

Bridges and Arizona Crossings

West End Connectivity Master Plan

PRESS RELEASE San Joaquin Council of Governments

The Richland County Transportation Penny Program. September 21, 2015

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

Freeway ramp intersection study

Urban Planning and Land Use

3.0 Future Conditions

Short and Long Term Needs

Duwamish Way-finding and CTR Report

Route 15 Congestion Report Findings

Planned Improvements from Sector & Area Plans that have been added to the MTP

State Highway 44/State Street High Capacity Corridor

St. Francis Drive through the City of Santa Fe Corridor Study

Swamp Road Residents Study

Carbondale to Murphysboro Bike Route JACKSON COUNTY

CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 2017

Detailed Descriptions and Maps of Woodside s Nature Trails

Connectivity. Tier I (0-5 yrs) 44 Issues, Recommendations & Priorities. LENGTH (ft) APPROX COST NO. NAME & DESCRIPTION. Shared Use Path/ Urban Trail

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

OTO BIKE/PED PLAN REPORT

section 4 Existing Conditions, Issues, and Options

FDOT Treasure Coast Traffic Report

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009

Multi-Modal Transportation Improvement Projects Identified by Neighborhood for the 20-year Planning Period

Parks, Open Space, Trails and Recreation Master Plan

FY 2005 TRANSPORTATION CAPITAL PROGRAM

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

TRANSPORTATIO N. Albemarle s transportation network will be increasingly multimodal, environmentally sound, well maintained, safe, and reliable.

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

Pantops Master Plan 2018 Update Focus Area Topic Meeting: Traffic & Transportation 3/26/2018 Community Feedback

STREET AND HIGHWAY PLAN

Transportation Planning Division

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

MnPASS System Today and the Future

Albemarle County. Existing Conditions. Bicycle

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

THE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS. Integrating Transportation Planning, Project Development, and Project Programming

Transcription:

ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS 2004-05 Through 2009-10 [SOME PROJECTS MAY NOT BE COMPLETED AS PRIORITIZED DUE TO PROJECT COMPLEXITY AND/OR AVAILABLE FUNDING] APPROVED BY THE BOARD OF SUPERVISORS MARCH 17, 2004 VDOT's County's Route Number and Name Location Estimated Estimated Description/Comments Secondary Proposed From - To Advertisement Cost Plan Ranking Date =============================================================================================================================================================================== Month-Year 0 0 County wide County wide Jun-10 $750,000 signs,pipe,plant mix projects, same funding 0 0 County wide Traffic mgmt. Program Jun-10 $300,000 Staff working with VDOT and Whippoorwill, Hollymead, Forest Lakes fo 1 1 625 Hatton Ferry Hatton Ferry Jun-10 $120,000 operation of ferry 2 Corville Farm Road Rt. 691-Greenwood Rd-D.E. Nov-03 $150,000 rural addition, project complete, VDOT requires it to remain on list until a 3 2 Meadow Creek Parkway Melbourne Rd to Rio Road Jun-08 $17,161,852 two lane design approved by County and Comm. Transport. Bd., in 3 2 Meadow Creek Parkway Bridge over Meadow Creek Jun-08 $2,204,500 (associated with project above) 4 3 649 Airport Road Route 29 to Route 606 Dec-03 $12,271,456 widen to four lanes, bike lanes,sidewalks,rs98/99 [13,411]/ under c 5 4 651 Free State Road Free State Road $3,350,000 construct road from Rio Rd to Free St Rd to replace substandard b 6 5 Northern Free State Road Route 631 to Route 29 $4,200,000 north/south conn. rd concept/alternatives. to be studied in conj w/ the proposed ea 7 6 691 Jarmans Gap Road Route 240 to Route 684 Dec-08 $10,500,000 serve increased traf w/ min widening, ped/bike access,rs 1999/00 8 7 649 Proffit Road Rt 29 to 1.6 miles east Jun-12 $9,500,000 improve alignment, urban x-section with bike/sidewalk,rs 2004/200 9 8 656 Georgetown Road Route 654 to Route 743 $3,200,000 spot improvement, pedestrain access,urban cross-section, RS 97/9 *** 9 Southern Parkway Avon Str. to Fifth Str. Extend to 5th St., with pedestrian/bike facility, and Neighborhood s 10 10 601 Old Ivy Road Ivy Road to 250/29 Byp $7,200,000 widen, improve alignment bike/sidewalk access,rs 2000/01 [4,800] 11 679 Grassmere Road.25 miles south of Rt 738 Jun-04 $100,000 Railroad crossing with no lights or gate [485] 12 781 Sunset Avenue NCL to Fifth St Extended spot and inter. Improve., urban x-sect, upgrade 2 lane.rs 2005/06, 13 631 Old Lynchburg Road 1.35 MI. S. I-64 to Rt.708 spot improvements at various locations,rs 2001/02 [2,100] 14 726 James River Road Route 795 to Route 1302 spot improvement to improve sight distance,rs 2002/03 [2000] - Soctts 15 Hillsdale Drive Greenbrier Dr. to Seminole Sq. new connector road between Hillsdale Rd and Hydraulic Rd, to be cons 16 795 Blenheim Road Intersection of Route 790 intersection improvement. [670] 17 Eastern Avenue Route 240 to Route 250 interconnect future neighborhoods str, proj. to include RR underpass and 18 631 Rio Road Rio Rd @ Pen Park Lane Inter. improve. requested by City, to be funded from private source 19 708 Dry Bridge Road Railroad overpass school transp. Dept. request, low weight limit *** Currently not eligible for full VDOT funding. Staff is working with VDOT to qualify road for full funding. Projects in bold are in the Development Area. Projects in bold and in italics are new on this year's priority list

VDOT's County's Route Number and Name Location Estimated Estimated Description/Comments Secondary Proposed From - To Advertisement Cost Plan Ranking Date =============================================================================================================================================================================== Month-Year 20 643 Polo Grounds Road Route 29 to Route 649 public req. to improv align, spot improv. safety related, RS 2004/05 [100 21 743 Hydraulic Road Intersection with Rt. 29 (29H250) improvements recommended from 29H250 Phase 2 Study 22 866 Greenbrier Drive Intersection with Rt. 29 (29H250) improvements recommended from 29H250 Phase 2 Study 23 676 Tilman Road Road Intersection of Route 250 intersection improvement,rs 2003/04 [4,800] 24 614 Garth Road Intersection of Rt. 676 intersection improvement, public request [3400] 25 601 Garth Road Intersection of Route 658 add turning lane at Barracks Farm Road, CATS recomm. 26 738 Morgantown Road at Route 250 close west ramp and construct tapered turn lane [1200] 27 676 Woodlands Road Intersection of Route 601 intersection improvement 28 616 Union Mill Road FCL to Route 759 improve alignment 29 606 Dickerson Road Route 649 to Route 743 improve to handle projected traffic, CHART recommendation, RS 2002/0 30 654 Barracks Road Intersection of Route 1001 intersection improvement 31 1403 Berkmar Extension Hilton Heights Rd to Town Center Rd new road to serve as parallel road to Rt. 29 32 Main Street Crozet Avenue to Eastern Avenue new road as recommended in the Crozet Master Plan 33 Town Center Rd Extended end of Town Center Rd to Airport Road new road to serve Hollymead development area 34 1520 Hollymead Dr Ext Route 29 to Rt. 743 new road to serve hollymead development area 35 Meadows Road Rt. 691 to Rt. 250 new road as recommended in the Crozet Master Plan 36 678 Owensville Road Intersection of Route 250 intersection improvement [3,400] 37 732 Milton Road Intersection of 762 spot improvement, requested by public 38 810 White Hall Road Intersection of Route 789 Intersection improvement. RS 2003/04.[1,800] 39 795 James Monroe Pky Intersection of Route 53 recommended from CATS, intersection improvement.rs 2005/06 [3,00 641 Frays Mill Road Rt. 641 @ Jacob Run install box culvert,rs 2005/06, not a County priority,a VDOT recommen 641 Frays Mill Road Rt. 641 @ Jacob Run install box culvert, no County Priority,a VDOT recommended safety proj 40 Fifth St Connector Rd Fifth Street to Avon Street connector road NORTH of I-64, urban cross section 41 Rt. 29 parallel road Polo Grounds Rd to Hollymead Dr. new road 42 743 Earlysville Road Rivanna River to Rt 643 public request to improv align, spot improv. safety related.rs 2004/05 [8 43 729 Milton Road Rt. 53 to Rt. 1120 improve road geometrics, two lane rural section [ 44 663 Simmons Gap Rd at int. of Rt. 604 - Buffalo River Rd site distance improvement 45 684 Half Mile Branch Road Rt. 691 to Rt. 797 spot/safety improvement to serve increased traffic w/ minimum widenin 46 702 Reservoir Road Fontaine Ave. Ext to Dead end paving and spot improvements at most dangerous locations Projects in bold are in the Development Area. Projects in bold and in italics are new on this year's priority list

VDOT's County's Route Number and Name Location Estimated Estimated Description/Comments Secondary Proposed From - To Advertisement Cost Plan Ranking Date =============================================================================================================================================================================== Month-Year 47 641 Burnley Station Road Norfolk Southern RR bridge project with low sufficiency rating 48 602 Howardsville Tnpk.01 miles south Route 626 Railroad crossing with no lights or gate [410 49 640 Gilbert Station Road Norfolk Southern RR bridge project with low sufficiency rating 50 642 Red Hill Depot Road.28 miles northeast Rt.708 Railroad crossing with no gate 51 671 Millington Road Intersection of Route 665 intersection improvement 52 692 Plank Road Route 29 to Route 712 spot improvements, safety related [1, 53 708 Red Hill Road Route 20 to Route 29 improve alignment [1,70 54 676 Woodlands Road Route 614 to Route 1050 spot improvements at several points, CATS recommendation [ 55 691 Park Road Park Road to Route 250 extend to eastern 240/250 street system 56 678 Decca Lane Intersection of Route 676 improve intersection, located near school, CATS recommendation 57 743 Advance Mills Road At Jacobs Run improve approach to bridge 58 795 Hardware Street Near inter. with Rt. 20 spot improvement, requested by Scottsville 59 732 Milton Road at Rt. 53 intersection improvement, public request 60 622 Albevanna Springs Rd Intersection of Route 795 intersection improvement 61 622 Albevanna Springs Rd Intersection of Route 773 intersection improvement 62 680 Browns Gap Tnpk Rt. 240 to Rt. 810 spot improvements, public request [70 63 611 Jarmans Gap Road Off Route 691 Railroad crossing with no gate 64 1310 Ferry Street.05 miles south of Rt. 6 Railroad crossing with no gate 65 601 Free Union at Tasmania Drive install culvert to prevent requent flooding 66 682 Broadaxe Road Off Dick Woods Road spot improvements, public request 67 813 Starlight Road Off Route 712 school request,needs turn-around space 68 654 Barracks/ Garth Road Georgetown Rd. to Rt. 601 pave shoulders and/or off road trail 69 631 Rio Road Meadow Creek Pwy to Stonehenge upgrade to urban x-section, sidewalk and bikelanes 70 742 Avon Street Ext. City limits to Mill Creek South improve to urban cross section All projects below Priority #70 are unpaved requests. The County has established two separate list for unpaved roads: Regular Paving and Rural Rustic Roads paving.

ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS FOR UNPAVED ROADS 2004-05 Through 2009-10 [SOME PROJECTS MAY NOT BE COMPLETED AS PRIORITIZED DUE TO PROJECT COMPLEXITY AND/OR AVAILABLE FUNDING] APPROVED BY THE BOARD OF SUPERVISORS MARCH 17, 2004 Route Number and Name Location Estimated Estimated Most escription/comments From - To Advertisement Cost Current Date Regular/RRR Traffic Count =============================================================================================================================================================================== PROJECTS THAT QUALIFY FOR RURAL RUSTIC ROAD PAVING IN PRIORITY RANKING 640 Gilbert Station Road Route 784 to Route 20 Aug-04 $400,000/$230,000 [260] Public request. At current ranking due to traffic count. Pilot RRR project to be complete in 666 Allen Road Route 664 to Dead end Jul-06 RRR - $100,000 [270] Public request. At current ranking due to traffic count. 633 Heards Mtn Rd Nelson CL to Rt. 634 (Heard) Jul-05 RRR - $50,000 [60] Nelson County request. Identified as a need by Rescue Squad. Has moved to current rankin 623 Woods Edge Rd Route 616 to dead end Jul-05 $100,000 [420] Public request. At current ranking due to traffic count. 744 Hacktown Road Rt. 250 to Rt. 731 Jul-06 RRR - $100,000 [380] Public request. At current ranking due to traffic count. 769 Rocky Hollow Road Rt. 20 to Dead end (about 1.4 miles) ** RRR - $150,000 [330] Public request. At current ranking due to traffic count. 685 Bunker Hill Road Route 616 to Dead end Jul-07 RRR - $85,000 [210] Public request. At current ranking due to traffic count. 790 Holly Road Rt. 795 to dead end Jul-08 RRR - $40,000 [230] Scottsville request. At current ranking due to traffic count. 734 Bishop Hill Road Route 795 to Rt. 1807 Jul-09 RRR - $150,000 [170] Public request. At current ranking due to traffic count. 760 Red Hill School Road Route 29 to Rt. 712 Jul-10 RRR - $150,000 [160] Public request. At current ranking due to traffic count. 722 Old Green Mtn Road Rt. 6 to 602 (may be two proj., Rt.6-723 & Rt.723-602) Jul 2011 RRR - $220,000 [150] Public request. At current ranking due to traffic count. 806 Estes Ridge Road 663-Dead End RRR - $40,000 [140] Scottsville request. At current ranking due to traffic count. 668 Walnut Level Road Rt. 810 to dead end RRR - $150,000 [140] Public request. At current ranking due to traffic count. 762 Rose Hill Church Ln Rt. 732 to Dead End RRR - $75,000 [130] Public request. At current ranking due to traffic count. 704 Fortune Lane Rt. 715 to Dead End RRR - $160,000 [120] Public request. At current ranking due to traffic count. 672 Blufton Road Rt. 810 to Dead end RRR - $200,000 [120] Public request. At current ranking due to traffic count. 608 Happy Creek Road Route 645 to Route 646 RRR - $150,000 [110] Public request. At current ranking due to traffic count. 774 Bear Creek Road NCL to dead end RRR - $400,000 [100] Public request. At current ranking due to traffic count. 747 Preddy Creek Road Rt. 600 to Rt. 640 RRR - $150,000 [80] Shool request. At current ranking due to traffic count. 600 Stony Point Pass 2.5 miles east to Rt. 231 RRR - $250,000 [50] Public request. At current ranking due to traffic count. Unpaved roads with dailly traffic volumes below 20 are not eligible for VDOT paving improvements (regular or rural rustic roads). Staff will keep these projects on the list because the daily traffic volume may increase by the time it is time to pave the road. 769 Beam Road Rt. 1484 to dead end $200,000/$40,000 [20] Public request, due to confusion with another section of Rt. 769 (west of Rt. 20) this project h 637 Dick Woods Road Rt. 691 to Rt. 692 RRR - $200,000 [20] Public request. At current ranking due to traffic count. 735 Mt. Alto Road Rt. 602 to Rt. 626 RRR - $250,000 [20] Shool request. At current ranking due to traffic count.

Projects in bold and in italics are new on this year's priority list. ** VDOT is re-evaluating this project for RRR eligibility. RRR- Eligible for Rural Rustic Road program. The cost estimates are based on unit cost of $100,000 per mile. When staff and VDOT further, the cost may decrease and increase or the road may be determined not eligible for the Rural Rustic Road Progr The Right-of-Way for all unpaved road requests is undetermined until two or three years before estimated advertisement date. ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS FOR UNPAVED ROADS 2004-05 Through 2009-10 [SOME PROJECTS MAY NOT BE COMPLETED AS PRIORITIZED DUE TO PROJECT COMPLEXITY AND/OR AVAILABLE FUNDING] APPROVED BY THE BOARD OF SUPERVISORS MARCH 17, 2004 Route Number and Name Location Estimated Estimated Most escription/comments From - To Advertisement Cost Current Date Regular/RRR Traffic Count =============================================================================================================================================================================== PROJECTS THAT QUALIFY FOR REGULAR PAVING IN PRIORITY RANKING 737 Mountain Vista Road Route 6 to Route 726 Completed $650,000 project completed 708 Secretarys Road Route 795 to Route 620 Feb-04 $1,250,000 construction to begin Spring 2004 640 Gilbert Station Road Route 641 to Route 747 Completed completed in Fall 2003 with private resources in conjunction with adjacent development 606 Dickerson Road Rt 850 to Rt. 1575 (paved sect.) Dec-06 $1,400,000 [360] Public request. At current ranking due to traffic count. 643 Rio Mills Road Rt. 29 to port. paved-(due to length, may be two projects)12/1/07 $800,000 [1900] Staff request. At current ranking due to traffic count. 647 Maxfield Road Rt. 22 to Dead End Dec-08 $500,000 [470] Public request. At current ranking due to traffic count. 784 Doctors Crossing Route 600 to Route 640 May-10 $1,350,000 [360] Public request. At current ranking due to traffic count. 688 Midway Road Rt. 635 to Rt. 824 Aug-10 $200,000 [360] Public request. At current ranking due to traffic count. 787 Gillums Ridge Rd. Route 682 to Route 708 Dec-11 $350,000 [360] Public request. At current ranking due to traffic count. 689 Pounding Creek Rd Rt. 250 to Rt. 635 $350,000 [340] Public request. At current ranking due to traffic count. 712 North Garden Lane Rt. 692 to Rt. 29 $450,000 [200] Public request. At current ranking due to traffic count. 736 White Mtn Road Rt. 636 to Rt. 635 (the sect. btwn Rt. 635 and 636 does not meet VDOT require.at this time) [200] Public request. At current ranking due to traffic count. 640 Gilbert Station Road Rt. 747 to 784(could be 2 proj.) Jul-08 $200,000 [260] Public request. At current ranking due to traffic count. 712 Coles Crossing Rd Rt. 713 to Rt. 795 $1,250,000 [160] Public request. At current ranking due to traffic count. 645 Magnolia Rd Rt. 608 to Orange CL [140] Public request. At current ranking due to traffic count. 682 Broad Axe Road Rt. 637 to to current paved sections [140] Public request. At current ranking due to traffic count. 678 Decca Lane Route 676 to Route 614 [140] Public request. At current ranking due to traffic count. 712 North Garden Lane Rt. 29 to Rt. 760 This project will be paved as part Rt. 712 -btwn Rt. 713 to Rt. 795 605 Durrett Ridge Road Rt. 743 to Swift Run (including bridge) [120] Public request. At current ranking due to traffic count. 723 Sharon Road Route 6 to Route 626 [100] Public request. At current ranking due to traffic count.

674 Sugar Ridge Road Route 614 to Route 673 [100] Public request. At current ranking due to traffic count. 707 Blair Park Road Rt. 691 to Dead end [70] Public request. At current ranking due to traffic count. 600 Stony Point Pass 2.5 mileswest to Rt. 20 [50] Public request. At current ranking due to traffic count. Projects in bold and in italics are new on this year's priority list. VDOT has not determined cost estimates for all unpaved road projects.

===== r traffic calming improvements all funding is complete. ncludes bridge over CSX RR construction bridge [420 on Free State Road] astern conn. rd as recom.in the proposed CHART. [2,400] 05 [2273] 98 [17,000] street design/speed ] ped/bike access[1,100] sville request structed with urban funds d bridge over Lickinghole Crk e [23,000]

===== 00] [20,000] [8,800] [6,300] [1200] [5400] [5,000] /03 [6,700] [6400] [1,100] 00] ndedsafety project ject 8,400] [4400] [1000] ng [680] [1900]

===== [340] 0] [170] [80] [370],400] 00] [2,600] [640] [140] [1,000] [710] [1100] [1000] [1000] 00] [210] [80] [1000] [140] [60] [22,000] [24,000] [1200]

==================================================================== Summer or Fall 2004 ng over time. had been prioritized higher.

ram ====================================================================