TXDOT DESIGNATION: TEX-922-K

Similar documents
TXDOT DESIGNATION: TEX-922-K

TEST FOR STABILOMETER VALUE OF BITUMINOUS MIXTURES

DETERMINING OPTIMUM RESIDUAL ASPHALT CONTENT (RAC) FOR POLYMER-MODIFIED SLURRY SEAL (MICROSURFACING) MIXTURES

Tex-914-K, Calibrating Motorized Gyratory-Shear Molding Asphalt Press

Tex-616-J, Construction Fabrics

Tex-414-A, Air Content of Freshly Mixed Concrete by the Volumetric Method

Method of Test for Flat & Elongated Particles

Chapter 37 Tex-241-F, Superpave Gyratory Compacting of Test Specimens of Bituminous Mixtures

Advanced Test Equipment Rentals ATEC (2832)

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Use Part II for absorptive mixtures that have more than 2.0 percent water absorption.

OPERATING INERTIAL PROFILERS AND EVALUATING PAVEMENT PROFILES

An exploration of how the height of a rebound is related to the height a ball is dropped from. An exploration of the elasticity of rubber balls.

Aug 17, 2001 LAB MANUAL MAXIMUM SPECIFIC GRAVITY (RICE VOIDS TEST) OF PAVING MIXTURES AASHTO Designation T 209 (Mn/DOT Modified))

DETERMINING DENSITY OF COMPACTED BITUMINOUS MIXTURES

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Tex-206-F, Compacting Specimens Using the Texas Gyratory Compactor (TGC)

COMPACTING SPECIMENS USING THE TEXAS GYRATORY COMPACTOR (TGC) PART I COMPACTING SPECIMENS USING THE TGC. Test Procedure for

Tex-416-A, Air Content of Freshly-Mixed Concrete by the Pressure Method

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST

MET 335W Fluid Mechanics Laboratory. Lab 1: Bourdon Tube Calibration. Nick Peak

HEATEC TEC-NOTE. Setting Siemens Pressure Transmitter. Used on Heatec Vertical Asphalt Tanks. Publication No , Revised

Density of Granular Material by Modified Sand-Cone Method for Thin Layers

Chapter 3 Tex-1001-S, Operating Inertial Profilers and Evaluating Pavement Profiles

DETERMINING DENSITY OF COMPACTED BITUMINOUS MIXTURES

EVALUATING AND INTERPRETING APPLICATION UNIFORMITY OF CENTER PIVOT IRRIGATION SYSTEMS

Tex-1001-S, Operating Inertial Profilers and Evaluating Pavement Profiles. Chapter 10 Special Procedures. Overview

BULK SPECIFIC GRAVITY AND UNIT WEIGHT OF COMPACTED HOT MIX ASPHALT (HMA) (Kansas Test Method KT-15)

Density of Soils and/or Granular Material In-place by the Sand-Cone Method

Supplementary Certificate of Approval. No S433

Tex-207, Determining Density of Compacted Bituminous Mixtures

IN-PLACE DENSITY WAQTC FOP AASHTO T 209 (16)

Specific Accreditation Criteria Calibration ISO IEC Annex. Mass and related quantities

STANDARD FOR CONTROL VALVE SEAT LEAKAGE

Commonwealth of Pennsylvania PA Test Method No. 742 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

DLA TROOP SUPPORT SUBSISTENCE INSPECTION MANUAL DLA Troop Support SUBSECTION 218.7

Cover Page for Lab Report Group Portion. Head Losses in Pipes

Cover Page for Lab Report Group Portion. Pump Performance

COMPACTING SPECIMENS USING THE TEXAS GYRATORY COMPACTOR (TGC) PART I COMPACTING SPECIMENS USING THE TGC. Test Procedure for

Snails Versus Humans Comparing Relative Strength of Snails and Humans

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

Smart Water Application Technologies (SWAT)

TxDOT Project : Material Design and Testing Methods for Home Made and Containerized Cold Mix

SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS

State of Nevada Department of Transportation Materials Division METHOD OF TEST FOR DETERMINING THE LIQUID LIMIT OF SOIL

OHD L-47. Guidelines for Resolving Differences in Test Results

Experiment. THE RELATIONSHIP BETWEEN VOLUME AND TEMPERATURE, i.e.,charles Law. By Dale A. Hammond, PhD, Brigham Young University Hawaii

AIR CONTENT OF FRESHLY MIXED CONCRETE BY THE PRESSURE METHOD (Kansas Test Method KT-18)

Type Testing Procedure for Crankcase Explosion Relief Valves

Tex-207-F, Determining Density of Compacted Bituminous Mixtures

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method

6000 SERIES OF PNEUMATIC DEADWEIGHT TESTERS

Operating Instructions

OPERATING AND MAINTENANCE MANUAL

Tex-227-F, Theoretical Maximum Specific Gravity of Bituminous Mixtures

THE FUNDAMENTALS OF THE AIR SAMPLER CALIBRATION-VERIFICATION PROCESS

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1055 ASPHALT MAT DENSITY BY GAUGE TESTING. January 15, 2016

Pumping Apparatus Driver/Operator Apparatus Testing. Chapter Test. Directions: Write the correct letter on the blank before each question.

ASPHALT PAVING LEVEL 1

EN400 LAB #2 PRELAB. ARCHIMEDES & CENTER of FLOTATION

METHOD OF TEST FOR THEORETICAL MAXIMUM RELATIVE DENSITY OF BITUMINOUS PAVING MIXTURES LS-264 R27 ASTM D2041/D2041M

INSPECTION FOCUS ON:

NZQA registered unit standard version 3 Page 1 of 7. Demonstrate knowledge of bitumen gangbar sprayers and operations

Item 585 Ride Quality for Pavement Surfaces

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

MEMORANDUM. Investigation of Variability of Bourdon Gauge Sets in the Chemical Engineering Transport Laboratory

In Place Density Determination of Asphalt Concrete by the Coring Method

Standard Recommended Practice. Field Measurement of Surface Profile of Abrasive Blast-Cleaned Steel Surfaces Using a Replica Tape

CONTRACTOR MIX DESIGN GUIDELINES ASPHALT CONCRETE

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

Powers Controls RC 195 Multiple Input Receiver- Controller

State of Nevada Department of Transportation Materials Division

We agree the CGA publication more adequately reflects the equipment accuracy requirements for performing a pressure test on cylinders.

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

Bubble Tube Installations

Calibrating Equipment for Aquatic Herbicide Application 1

HCMTCB ASPHALT CERTIFICATION KEY ELEMENTS LIST

Technical Procedure for Instrument Calibration and Maintenance

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices

Predicted Dispense Volume vs. Gravimetric Measurement for the MICROLAB 600. November 2010

WIKA INSTRUMENT CORPORATION

TECHNICAL DATA. than the water inlet pressure to the concentrate

INSTRUMENT INSTRUMENTAL ERROR (of full scale) INSTRUMENTAL RESOLUTION. Tutorial simulation. Tutorial simulation

Pipettor. User Manual

Preferred Instruments Danbury, CT USA

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310

POLYURETHANE SPRAY FOAM REFILL SYSTEM QUICK START GUIDE

ATT-59, Part I. ATT-59/99, SMOOTHNESS OF PAVEMENTS Part I, Manual Profilograph. b) Determining the Profile Index from profilograms

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

#LZ400 LEAKALYZER. Water Loss Sensor INSTRUCTION MANUAL Country Dr. #190 St. Paul, MN

American Weigh Scales, Inc. BLADE Series D i g i t a l P o c k e t S c a l e BLADE-550. User Manual BLADE-400 BLADE-1000

Geotechnical Engineering Laboratory CIVIL ENGINEERING VIRTUAL LABORATORY Experiment no 8 Standard Penetration Test

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

OP CHECKLIST FOR 1D CONSOLIDATION LABORATORY TEST

with O 2 Controller Instruction Manual

DPC-30 DPC-100. Reference Manual

Ez Flo Impact Flow Scale graduates from weighing Baghouse Dust out of an Auger to RAS out of a Feeder Bin.

Instruction Manual 742 5/1/2009. Eclipse Ratio Regulators ES Series Version 1

Technical Procedure for General Laboratory Equipment

Transcription:

Test Procedure for CALIBRATING ASPHALT DISTRIBUTION EQUIPMENT Texas Department of Transportation TxDOT Designation: Tex-922-K Effective Dates: November 2004 April 2009. 1. SCOPE 1.1 This three-part procedure is a method for calibrating asphalt distributor tanks, verifying asphalt distributor tank calibrations, and ensuring uniform distribution across a spray bar. 1.2 The values given in parentheses (if provided) are not standard and may not be exact mathematical conversions. Use each system of units separately. Combining values from the two systems may result in nonconformance with the standard. PART I ASPHALT DISTRIBUTOR TANK CALIBRATION 2. SCOPE 2.1 The following method describes calibrating asphalt distribution tanks. 3. APPARATUS 3.1 Water meter, calibrated annually, readable to within 4 L (1 gal.). If a water meter is not available, use a calibrated 19 L (5 gal.) bucket to perform the distributor tank calibration. 3.2 Bucket, calibrated to measure 19 L (5 gal.) 3.3 Strapping rod. 3.4 Tape measure, or ruler. 3.5 Water-finding paste (optional). 3.6 Spirit level. 4. PROCEDURES 4.1 Verifying Water Meter: 4.1.1 Fill a container with a known volume using the water meter. CONSTRUCTION DIVISION 1 5 11/04 04/09

4.1.2 Compare the meter reading to the known volume. 4.1.3 Reject if error is greater than 1.0%. 4.2 Calibrating Asphalt Distributor Tanks: 4.2.1 Be certain the tank is reasonably clean. 4.2.2 Park the distributor tank on a level surface. 4.2.3 Level the tank longitudinally and transversely with a spirit level. The tank may need releveling during the procedure if differential settlement occurs while filling the tank. 4.2.4 Close the valve between the distributor tank and the spray bar. 4.2.5 Use the calibrated water meter to pump water into the tank in the following increments: no more than 76 L (20 gal.) increments for a tank with a capacity of 9464 L (2,500 gal.) or less no more than 95 L (25 gal.) increments for a tank with a capacity between 9464 L (2,500 gal.) and 15,142 L (4,000 gal.) no more than 189 L (50 gal.) increments for tanks with a capacity of greater than 15,142 L (4,000 gal.). Note 1 Use approximately 1.0% of tank capacity for calibration increments. 4.2.6 Allow the water surface to become still after pumping each increment of water into the tank. 4.2.7 Hold the strapping rod vertically in the center of the tank. 4.2.8 Measure the depth of water on the strapping rod to the nearest 3 mm (1/8 in.) with a tape measure or ruler. Water-finding paste will assist in accurately determining the water level. 4.2.9 Record the depth measurement and the corresponding volume. 4.2.10 Continue this procedure until the tank is full. 4.2.11 Prepare the depth vs. volume data plus the identification and description of the distributor. The calibration report must be signed by, and display the seal of, the Registered Professional Engineer, who is required to witness the calibration. 4.2.12 Make a new calibration stick based on the depth vs. volume data. 4.2.13 Stamp the serial number of the tank on the stick. 4.2.14 Check this calibration stick for accuracy immediately after fabrication. 4.2.15 Mount the stick on the side of the distributor tank. CONSTRUCTION DIVISION 2 5 11/04 04/09

4.2.16 File a copy of the calibration papers in the contract file. 4.2.17 Give the original to the contractor to carry with the distributor tank. CAUTION: Remove all water after calibrating the distributor tank or spray bar. Adding 'hot' asphalt (in excess of 100 C [212 F]) will cause water in the tank to boil in an explosive manner, which could result in serious injury. PART II ASPHALT DISTRIBUTOR TANK VERIFICAION TEST 5. SCOPE 5.1 The following method describes verifying asphalt distributor tank calibrations. 6. PROCEDURE 6.1 Obtain a copy of the most current calibration report from the contractor, relating the depth of material in the tank to its volume. 6.2 Check the report to verify that the tank matches the description, serial number, etc., shown on the report. 6.3 Check the depths on the calibration stick against the depths recorded on the calibration report. 6.4 Check the number of points necessary to verify that the calibration is correct. Since the vast majority of measurements are generally taken in the bottom 10% and the top 10% of the volume of the tank, these are the areas of most concern. 6.4.1 Accept the calibration verification if the difference between each actual volume and the measurement obtained from the calibration report is within 1.5% of the total capacity of the tank. 6.4.2 If the percent error exceeds 1.5%, recalibrate the distributor tank according to Part I. 6.5 If the tank does not meet the requirements of the verification test, prepare documentation of the findings for future references. PART III CALIBRATING SPRAY-BAR 7. SCOPE 7.1 The following method describes preparing, calibrating, and ensuring uniform distribution across a spray-bar. CONSTRUCTION DIVISION 3 5 11/04 04/09

8. APPARATUS 8.1 Scale, capable of reading up to approximately 4000 g. 8.2 Elliptical buckets, approximately 216 mm (8.5 in.) deep, with an opening of 254 x 89 mm (10 x 3.5 in.). These can be fabricated from old triaxial cells. 8.3 Plastic bags, 292 x 318 mm (11.5 x 12.5 in.). 8.4 Large rubber bands. 9. PROCEDURES 9.1 Preparing Spray-Bar for Calibration: 9.1.1 Fill the distributor tank with water so the level is above the flues (approximately 757 L [200 gal.]). 9.1.1.1 Asphalt can be used instead of water to perform this procedure; however, AC asphalts are not recommended due to the high temperature required to make them flow freely. 9.1.1.2 If emulsified or cutback asphalts are used instead of water, they must be heated to a temperature that will allow the asphalt to flow freely. 9.1.2 Heat the water to 54.4 to 65.6 C (130 to 150 F). 9.1.3 Turn all nozzles so that the V-groove is 90 degrees to spray-bar. 9.1.4 Open all the valves. 9.1.5 Check to see that water is spraying freely from nozzle. 9.1.6 Clean or replace clogged nozzles. 9.2 Calibrating Spray-Bar: 9.2.1 Place plastic bags inside elliptical buckets. 9.2.2 Fill each bucket (and bag) with dry aggregate or sand to prevent entrapment of air. 9.2.3 Secure each bag with a rubber band. Note 2 Omit bags if using AC asphalt for calibration. 9.2.4 Obtain a tare weight for each bucket, bag, and rubber band. 9.2.5 Place a bucket under each nozzle to catch all the flow from that nozzle. 9.2.6 Set pump speed, etc. to settings used during construction. CONSTRUCTION DIVISION 4 5 11/04 04/09

9.2.7 Open the spray-bar and fill the buckets 2/3 to 3/4 full. 9.2.8 Weigh each bucket and record the weight. 9.2.9 Calculate the percentage of deviation for each nozzle. This deviation must not exceed ± 10.0%. 9.2.10 Make a plot with the bucket number versus percentage deviation. This will show the spray bar distribution and may assist in correcting deviations in nozzle outputs, suggesting that a linkage may need adjustment, or a nozzle may need replacement. 9.2.11 Record all data (tare weight, gross weight, net weight, and percentage deviation) with the identification and description of the distributor. 9.2.12 File the spray-bar calibration report in the contract files. CAUTION: Remove all water from the distributor tank after calibrating the spray-bar. Adding 'hot' asphalt (in excess of 100 C [212 F]) will cause water in the tank to boil in an explosive manner, which could result in serious injury. 10. ARCHIVED VERSIONS 10.1 Archived versions are available. CONSTRUCTION DIVISION 5 5 11/04 04/09