High Pressure Washer Safe Work Procedure PTES_HSE_SWP_006. Name Date Signature. Author John Nulty 12/05/2015. Reviewed Jarred Hearle 12/05/2015

Similar documents
Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014

Processing Fire Extinguishers Safe Work Procedure PTES_HSE_SWP_038. Name Date Signature. Author Jarred Hearle 21/09/2015

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/

Hazard Identification and Risk Assessment Form. Risk Assessment

SAFE WORK METHOD STATEMENT Part B

Meuangvang Development Co.LTD Standard Working Procedure 058 Use of Hydraulic Torqueing Devices

SAFE WORK METHOD STATEMENT

Manual Handling Procedure

SAFE WORK METHOD STATEMENT

Removing Frozen Clips

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

CENTRAL PLANT HEATING/CHILLED WATER OPERATOR Ref. Code: C-WO-4

PPE and Tools PPE and Tools

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

JACKHAMMER SAFETY TRAINING

Task/Step Potential Hazards Recommended Safe Job Procedures

SAFETY MANAGEMENT SYSTEM

Appendix 4C - Sample SWMS Trenching

ESSENTIAL SAFETY RESOURCES

SAFETY MANAGEMENT SYSTEM

Powerplay Paintball Brighouse Risk Assessment

Job Hazard/Safety Analysis For the Electrician

Job Hazard Analysis. JHA No. FBP-JHA Revision No. Draft General or Job-Specific Description of Work

NEVADA STATE RAILROAD MUSEUM

SAFE WORK METHOD STATEMENT SWMS No Version

Hazard Identification and Risk Assessment Form. Risk Assessment

HEALTH AND SAFETY MANUAL

Job Hazard Analysis Analysis by:

Vacuum Excavation in the vicinity of the Wellington Electricity Network

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

SAFETY/RISK/HAZARD ASSESSMENT

WATER BROOM. operation manual

Safe Work Method Statements (SWMS)

Safe Work Method Statement

Safety Powder Spray Systems

Job Hazard Analysis Form (JHA)

Battery-powered Micro Cutters

Grounds Equipment Operation Contest Guidelines

SAFETY MANAGEMENT SYSTEM

HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD

DEPARTMENT OF THEATRE AND DANCE CALIFORNIA STATE UNIVERSITY, FULLERTON

20 Ton SD Shop Press Operating Instructions

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

University College Dublin Machinery/Equipment Risk Assessment Template

Hazard Identification and Risk Assessment Form. Risk Assessment

Job Hazard/Safety Analysis For the Carpenter

Tailgate Topic Review

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

WORK METHOD STATEMENT STRUCTURAL STEEL

Model No.: SFC-ED Torque Tool Serial No.: SFC Ref No.:

"SAFETY HOUSEKEEPING AND ACCIDENT PREVENTION"

Recognition, Evaluation, and Control of Hazards

ERI Safety Videos Videos for Safety Meetings POWER SAW SAFETY. Leader s Guide 2001, SAFETY SOURCE PRODUCTIONS

Hazard Identification and Risk Assessment Form. Risk Assessment

Western Sydney University Safety Inspection Checklist - Laboratory Environments

Activity Hazard Analysis. Final Review: Dr. R. Von Burg

A Health & Safety Risk Management Tool that you can use today. Scott Norman, CIH, CSP Health & Safety Program Manager Bay West LLC

Instructions: Use this format to prepare the security plans for ACP contracts. EVERY point has to be covered; if they do not apply, write N/A.

techconnect CARPENTRY Objectives Unit 2 Workplace Safety TechConnect - STUDENT WORKBOOK 2-1 Workplace Safety - Unit 2

PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA)

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

SAFETY/RISK/HAZARD ASSESSMENT

Completed by: Anthony Jones (BE Design Laboratory Manager) Staff/Student number: School/Unit: BE Design Laboratory. Current version: V_01

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

New Hire Safety Orientation. Welcome to Flexicrew, our number one priority is you and your safety.

SAFETY MANAGEMENT SYSTEM

Date Issued: November 2011 Revision Date: December 2012 Review Date: December 2015 Revision #

CHAPTER 26 WELDING AND CUTTING

REL-510H WARNING NOTICE 12 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD

WORK METHOD STATEMENT CARPET LAYING

Machine Shop Manual. Minerals & Materials Engineering Building #12, Room 119 M & M. Table of Contents

CHAPTER 37: EQUIPMENT TRAINING CERTIFICATION

SAFE WORK METHOD STATEMENT

Collision Repair Shop Inspection Checklist

How severely could the risk hurt someone? Low/Insignificant First aid

Potential hazards People at risk and how? Actions already in place Further action required Action by

Valley View Copy Shop: POLICIES & PROCEDURES

Title: Recreational Facilities 3 - Athletic Facilities

Hotspotter. Model WB-100 Professional Series. Assembly, Testing & Operating Instructions. Safety Information:

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Job Hazard Analysis

HAZARDS AND RISKS ASSOCIATED WITH THE USE OF RIDE ON MOWERS

Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation

Steam Locomotive Operating Procedures SVLS Locomotive 1973 Steam Up

The Sample Company Pty Ltd

RulesforLaborers,Oilers, andtheplacingcrew VERSION7.0.1

PPE HAZARD ASSESSMENT GUIDE

JOB HAZARD ANALYSIS FOR PPE

Doc No: WELDHOT Midland Engineering Co., Inc. Initial Issue Date 12/14/15 Safety Management System

Method Statement: Testing Dry Riser System

Laboratory Personal Protective Equipment & Hazard Assessment Tool

REL-46 WARNING NOTICE 15 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD. Compatible with RELIABLE R15 and P Style dies. REL-46 Manual

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

LP Gas BBQ Work Method Statement

75 Ton SD Shop Press Operating Instructions

Transcription:

High Pressure Washer Safe Work Procedure PTES_HSE_SWP_006 Name Date Signature Author John Nulty 12/05/2015 Reviewed Jarred Hearle 12/05/2015 Approved Geoff Selfe 12/05/2015

Key Safety Acts Complete a 5 Step prior to commencing any work Gloves shall be worn for all manual tasks Always use correct manual handling techniques Maintain good housekeeping at all times. Stow away unused gear. Be aware of your surroundings Qualifications Required to Operate N/A PTES_HSE_SWP_006 High Pressure Washer Safe Work Procedure Rev 0 12/05/2015 Page 2 of 11

Shall - the instruction is compulsory. Should - the instruction is preferred but allows for initiative to be exercised. A JHA should be written for any variation in procedure or for the control of any new hazards that are identified. Correct manual handling technique: Utilise suitable Personnel appropriate for the task- consider age, special skills, capabilities and knowledge. Determine a lifting leader who will provide verbal instructions during the manual handling task. Definitions Ensure all Personnel involved are warm and stretched prior to undertaking any manual handling tasks. Ensure lifting point, path and set down points are free from obstacles and that the floor surfaces are not slippery. Remember to keep your spine in a neutral posture throughout the manual handling task. Consider the use of any manual handling aids, such as trolleys or hoists to minimize the weight lifted by Personnel. Avoid jerky movements, side bending or twisting during the manual handling process. Ensure the load is kept as close to the body as possible with the load sustained below your shoulders but above your mid-thigh. PTES_HSE_SWP_006 High Pressure Washer Safe Work Procedure Rev 0 12/05/2015 Page 3 of 11

PPE PPE requirements for this task are: high visibility reflective long sleeved shirt and long pants, safety glasses, gloves, safety boots and hard hat, hearing protection.(consider disposable overalls), face shield Take 5 Complete a Take 5 prior to commencing a prestart inspection, cleaning operations or any other hazardous task. PTES_HSE_SWP_006 High Pressure Washer Safe Work Procedure Rev 0 12/05/2015 Page 4 of 11

JHA Complete a JHA prior to commencing, if the scope of work has changed. Stored energy Isolate(remove key) Slips, trip and falls Maintain housekeeping at all times. Be aware of surroundings at all times. Prestart Visually check pressure cleaner for damage, cracks, and loose components also check the level of engine oil, pump oil, diesel as per operational manual. Check that hose and spray gun are connected correctly. Enough water to complete task Pinch Points Take care when handling pressure cleaner, hoses. Wear gloves. Environmental Spills Ensure oily rags are disposed of correctly. If a spill occurs, use the spill kit. Burns If engine is warm, conduct a visual check of the engine. PTES_HSE_SWP_006 High Pressure Washer Safe Work Procedure Rev 0 12/05/2015 Page 5 of 11

Starting Pressure washer Open the fuel cock Open water supply valve (to pump) Set the speed governor lever to Run position. Pull trigger on gun to relieve pressure. Turn on the start switch toward clockwise Start position If the engine is started, take your hand away from key switch immediately. If the engine does not start after 10 seconds return key to off position wait 15 seconds and then start again. Do not overrun starter motor, damage to starter and battery may occur. Refer to operating instructions for alternative starting method if pull start is to be used Fuel Spill Pinch points Noise Fumes Kick back from water pressure Observe fuel lines/clamps PPE, Gloves Hearing protection Start in well ventilated area. Brace position PTES_HSE_SWP_006 High Pressure Washer Safe Work Procedure Rev 0 12/05/2015 Page 6 of 11

PTES_HSE_SWP_006 High Pressure Washer Safe Work Procedure Rev 0 12/05/2015 Page 7 of 11

PTES_HSE_SWP_006 High Pressure Washer Safe Work Procedure Rev 0 12/05/2015 Page 8 of 11

Fumes Operate in well vented area Running of engine Allow engine to warm up 3 minutes Set the speed governor lever to the required speed position. Noise Stored energy Hearing protection must be worn Be aware that pressure washer has now stored pressure in hoses and spray gun. Depress trigger on gun to start water flow Release trigger to stop water flow Adjust spray for task being performed by changing quick-fix nozzles(see CHANGING NOZZLES section of manual) Burns Kick back from water pressure Avoid contact with exhaust. Stand on a stable surface and grip gun with both hands expect the gun to kick when triggered High Pressure Cleaning The high pressure gun must never be pointed at other personnel or sprayed directly at Electrical cabinets or components. Safety glasses, face shield and gloves must be worn at times when operating the pressure cleaning gun. Never leave equipment running and unattended. Flying objects/particles Fluid injection PPE Never point lance at people or animals PTES_HSE_SWP_006 High Pressure Washer Safe Work Procedure Rev 0 12/05/2015 Page 9 of 11

Fumes Operate in well vented area Noise Hearing protection must be worn Stop of the engine Set the speed governor lever at low speed position before stopping the engine and then run the engine at no load for 3 minutes. Set the speed governor lever at stop position. Set the fuel cock at S stop position. Turn the key starter to the OFF position Turn off water valve (IBC) Stored energy Burns Be aware that pressure washer has now stored pressure in hoses and spray gun. Avoid contact with exhaust PTES_HSE_SWP_006 High Pressure Washer Safe Work Procedure Rev 0 12/05/2015 Page 10 of 11

Operator Sign on Sheet By signing on to this sheet I agree that I have read the required Safe Work Procedure in relation to operating the high pressure washer cleaner and understand all elements of the task that I will be performing. I agree to ensure I undertake a Take 5 prior to performing the task and will ensure I complete a prestart on the piece of equipment I will be operating. Date Operator Name Operator Signature Supervisor Name Supervisor Signature PTES_HSE_SWP_006 High Pressure Washer Safe Work Procedure Rev 0 12/05/2015 Page 11 of 11