Broad Street Bicycle Boulevard City Council Study Session Summary

Similar documents
CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18)

Community Design Charrette Meeting Summary

Broad Street Bicycle Boulevard Design Guidelines

Lincoln Avenue Road Diet Trial

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Welcome! San Jose Avenue Open House August 25, 2015

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Monterey Road Complete Streets

Major Bike Routes 102 Avenue Workshop April 21, 2015

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Draft Traffic Calming Policy Paper

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Welcome! Public Open House on UBC s Transportation Plan

Cycle Track Design Best Practices Cycle Track Sections

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

Glebe Neighbourhood Cycling Plan

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Living Streets Policy

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Capital Metro Downtown Multimodal Station

Welcome. If you have any questions or comments on the project, please contact:

Engineering - Bicycle and Pedestrian

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Dowling/Beaty Cycling Route

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Bellevue Downtown Association Downtown Bike Series

RiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017

City of Vestavia Hills Traffic Calming Policy for Residential Streets

Pennsylvania Avenue (CR 484) Design Alternatives Study

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Traffic Calming Policy

City of Madison: 2017 Capital Budget Capital Improvement Plan

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

City of Fairfax, Virginia City Council Work Session

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Simulation Analysis of Intersection Treatments for Cycle Tracks

Public Information Centre

Safe Routes to School (SRTS) Improvements for Bishop s Peak & Pacheco Elementary Meeting #2 Summary

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

City of Seattle Edward B. Murray, Mayor

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

122 Avenue: 107 Street to Fort Road

Downey Road. Transportation Improvement Study

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

SPEED MANAGEMENT FOR VISION ZERO

Executive Summary Route 30 Corridor Master Plan

Item No Halifax Regional Council January 16, 2018 January 30, 2018

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Town of Southwest Ranches Neighborhood Traffic Calming Program

WELCOME Public Information Centre

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Roundabouts and Bikes: Like Oil and Water or Peanut Butter and Bananas?

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015

MTP BICYCLE ELEMENT UPDATE. November 2017

FHWA Resources for Pedestrian and Bicycle Professionals

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

Borough of Danville, PA Traffic Calming Program Guidelines

BIKE PLAN CONTENTS GATEWAY

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Display Boards Including Five Refined Design Concepts

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

Neighborhood Traffic Calming Policy & Guidelines

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Bobbie Walthall. Hi Bobby, please include these comments in tonight s CC packet. Thanks for your consideration, Phil Collison Lawrence Resident

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Proposed White Flint Separated Bike Lane Network September 2015

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Laurier Segregated Bike Lane Pilot Project July 2013 update

EXECUTIVE SUMMARY. Vision

City of Wilsonville 5 th Street to Kinsman Road Extension Project

North Shore Transportation Improvement Strategy

Transcription:

Broad Street Bicycle Boulevard City Council Study Session Summary Overview: On August 15 th, 2017, a City Council Study Session was held to invite community input and request City Council guidance on a preferred alternative to carry forward for the Broad Street Bicycle Boulevard project. Specifically, regarding the most challenging portion of the proposed route, the segment between Lincoln Street and Ramona Drive. City staff, Jake Hudson (Transportation Manager) and Luke Schwartz (Transportation Planner-Engineer), provided an introductory presentation summarizing the project background, purpose and need for improvements, and an overview of three primary concept alternatives, as well as other variants of these alternatives open for consideration. Staff identified the unique benefits and significant trade-offs associated with each project alternative and variant. Staff acknowledged that ultimately, the solution that best balances the priorities of the project (improve safety and mobility for pedestrians and bicyclists) with the priorities of the neighborhood (retain traffic circulation and neighborhood quality) may reflect one of the three primary concept alternatives, a variant of these three options, or a combination of elements not yet considered. Concluding the presentation, staff requested input from meeting attendees and Council. Following the staff presentation, the Study Session was opened to public comment. The meeting was well-attended, with a sizable contingent of Anholm District residents, business owners, active transportation advocates and other interested community stakeholders. A significant portion of the public comments reflected general concern regarding the Broad Street Bicycle Boulevard project. The comments predominantly focused on concerns about potential impacts to neighborhood livability, particularly impacts to traffic access, circulation, parking and emergency services. Several attendees disputed the need for significant street improvements at all, favoring minor bicycle signage/marking enhancements and more focused police enforcement of unsafe bicycling behavior as a preferred course of action. Other attendees affirmed the need for infrastructure investments in this area to support the City s goals to improve multimodal safety & mobility, and to make tangible progress in achieving the City s public health and circulation goals to increase mode share for active forms of transportation. Even amongst those in support of the project, there was not a clear consensus for one specific concept alternative. Council Direction: Following public comment, the City Council deliberated the project elements and asked staff to confirm information regarding on-street parking utilization and the potential benefits/trade-offs of providing dedicated bicycle facilities on Chorro vs. creating a less-direct bicycle route on Lincoln Street east of Chorro using markings/signage only. Ultimately, Council directed staff to take the following actions: Continue with refinement of a Recommended Alternative that retains current property access and traffic circulation: 1

o o o Provide dedicated bicycle facilities on Chorro Street with removal of onstreet parking on one side of Chorro to provide width for a two-way protected bikeway from Lincoln to Mission. Route bicyclists from Chorro to Broad Street via Mission Street, using pavement markings and signage. No parking removal on Mission Street. Provide dedicated bicycle facilities on Broad Street from Mission to Ramona with removal of on-street parking on one or both sides of Broad to provide width for buffered or protected bicycle lanes. Consider a Secondary Alternative as a fallback option that limits removal of on-street parking: o o Establish a bicycle boulevard with treatments such as pavement markings, signage and low-impact traffic calming measures that require little-to-no modifications to traffic circulation or parking. The recommended route should utilize Lincoln Street parallel to Chorro north to Mission; Mission Street from Chorro to Broad; and Broad north of Mission to Ramona. For final alternatives, consider low-impact traffic calming elements, pedestrian crossing improvements and safety lighting enhancements that do not significantly impact circulation or parking to improve safety and neighborhood livability along Broad and Chorro Streets. Collect additional parking data once local schools and Cal Poly students return to session to further study existing on-street parking utilization and evaluate potential impacts associated with on-street parking removal, as proposed under the Recommended Alternative. Once the refined concepts are developed and analyzed, staff will present the updated plans to the public via an additional community meeting in fall of 2017. Staff will then return to the City Bicycle Advisory Committee and City Council for present the final plan for consideration, and potential adoption likely in early 2018. Meeting minutes from the August 15 th Council Study Session will be posted on the City s website when available. The primary features of the Recommended Alternative and Secondary Alternative are provided in Attachment A. A copy of the staff PowerPoint presentation is included in this document as Attachment B. Please visit the Project Website (https://www.peakdemocracy.com/3444) for past meeting summaries, project documents and meeting updates. Contact Project Managers Luke Schwartz (lschwartz@slocity.org) or Jennifer Rice (jrice@slocity.org) with any questions. 2

ATTACHMENT A

ATTACHMENT A Recommended Project Typical Cross Section: Chorro Street (Lincoln to Mission) Note: Form of physical protection between bicycle lanes and traffic lanes will be determined when project enters detailed design phase. Example treatments to be considered are illustrated below:

ATTACHMENT A Recommended Project Typical Cross Section: Mission Street (Chorro to Broad)

ATTACHMENT A Recommended Project Typical Cross Section: Broad Street (Mission to Meinecke) Note: Detailed parking studies to be conducted to guide selection of recommended configuration for Broad Street

ATTACHMENT A

ATTACHMENT A Secondary Alternative Typical Cross Section: Chorro/Lincoln/Broad Note: On street parking and travel lane widths remain as exist currently, with addition of pavement marking & signage. Broad Street section has narrower parking & travel lanes than shown in example graphic above.

Broad Street Bicycle Boulevard Project Alternatives Study Session City Council, August 15 th, 2017 Presenters: Jake Hudson, Transportation Manager Luke Schwartz, Transportation Planner-Engineer Introductions & Background Present 3 Alternatives for Northern Segment (Lincoln to Ramona) Discuss Other Project Options Community Feedback Open Discussion

Focus Areas: Northern Segment Foothill to Hwy 101 Southern Segment Hwy 101 to Monterey Bike/Ped Crossing of Hwy 101

What is a Bicycle Boulevard & what makes a low-stress bicycle street? Bicycle Boulevard o Shared Street o Low auto volumes/speeds o Prioritizes bikes/peds, accommodates cars o Branded signs & pavement markings Low Stress Bicycling Environment o Separation from vehicle lanes o Low traffic volumes & speeds o Existing Broad/Chorro volumes & speeds exceed recommended levels for bike blvd. o Comfortable for users of varying ages & ability levels

Public Outreach Activities 3 community meetings Including interactive design charrette 45 people attended each meeting Online Forum 1,000+ visitors to project site 120+ comments Community Survey Mailed to 1,200+ residents in project area 239 responses Online survey available community-wide 240 responses Social Media Platforms Press Releases City Website E-Blasts Tribune KSBY Neighborhood Mailers

Three Concept Alternatives Alternative 1: Bicycle boulevard with traffic diversion along Broad Street Alternative 2: One-way couplet : Broad southbound, Chorro northbound Alternative 3: Traffic calming on Broad and Chorro without traffic diversion *Final solution may be variant of these options or other strategies*

Alternative 1: Bicycle Boulevard with Traffic Diversion Along Broad PROS Significant speed reduction on Broad. Decreases traffic volume on Broad to provide a comfortable biking & pedestrian environment. Strong potential to establish a low-stress, convenient bicycle route on Broad. Can be installed for interim testing with lowcost temporary materials. Most favorable option for emergency response providers CONS With traffic diversion, increased traffic volumes on Chorro, Meinecke and Lincoln exceed established maximum neighborhood traffic thresholds. Less convenient access to properties on Broad. Degraded conditions for residents, drivers, bicyclists and pedestrians on Chorro with traffic diversion. Loss of on-street parking: 16 on Broad ; 0 on Chorro

Alternative 1: Bicycle Boulevard with Traffic Diversion Along Broad

Alternative 1: Bicycle Boulevard with Traffic Diversion Along Broad AVERAGE DAILY TRAFFIC VOLUME 12,000 10,000 8,000 6,000 4,000 2,000 0 SPEED AND VOLUME THRESHOLDS FOR SHARED BICYCLE STREET Maximum Preferred MAX NEIGHBORHOOD TRAFFIC THRESHOLD 0 5 10 15 20 25 30 35 40 MOTOR VEHICLE SPEED (MPH) BROAD ST (ALT 1) CHORRO ST (ALT 1) CHORRO ST (EXISTING) BROAD ST (EXISTING)

Alternative 2: Broad/Chorro One-Way Couplet System PROS Moderate speed reduction on Broad. Traffic volumes more evenly distributed between Broad/Chorro. Bicycles fully separated from auto traffic. Significant potential to establish low-stress, convenient bicycle route for users of varying ages & ability levels. Most potential to attract new bicycle ridership. CONS Meinecke and Lincoln volumes exceed neighborhood traffic thresholds, although lower than with Alt. 1. Less convenient access to properties on Broad and Chorro. Higher cost & more challenging to test/install with interim treatments. Loss of on-street parking: 9 on Broad; 22 on Chorro. Least-desirable option for emergency response providers. Modifies primary response route Response time to DT increased by apx. 60 sec.; but not beyond minimum Limits use of ladder truck & available space for crew to operate in Expectation that Fire will occupy cycle track lanes during a response

Alternative 2: Broad/Chorro One-Way Couplet System PROTECTED BIKEWAY (CYCLE TRACK) BUFFERED BIKE LANES

Alternative 3: Bicycle Boulevard with out Traffic Diversion on Broad Street PROS Significant speed reduction on Broad and moderate speed reduction on Chorro with traffic calming. No impact to circulation or property access. Moderate potential to establish a low-stress, convenient bicycle route on Broad Can be installed for interim testing with low-cost, temporary materials. Little impact to emergency response CONS Near-term volumes on Broad and Chorro remain above level for low-stress bicycle boulevard. Long-term closure of Highway 101 ramps would reduce Broad volumes into acceptable range, but timeframe TBD. No new impact, but Chorro volumes continue to exceed max neighborhood traffic thresholds. Loss of on-street parking: 20 on Broad ; 0 on Chorro. Least potential to attract new bicycle ridership.

Alternative 3: Bicycle Boulevard with out Traffic Diversion on Broad Street

Alternative 3: Bicycle Boulevard with out Traffic Diversion on Broad Street 12,000 SPEED AND VOLUME THRESHOLDS FOR SHARED BICYCLE STREET AVERAGE DAILY TRAFFIC VOLUME 10,000 8,000 6,000 4,000 2,000 Maximum Preferred CHORRO ST (ALT 3) MAX NEIGHBORHOOD TRAFFIC THRESHOLD BROAD ST (ALT 3) CHORRO ST (EXISTING) BROAD ST (EXISTING) 0 0 5 10 15 20 25 30 35 40 MOTOR VEHICLE SPEED (MPH)

Other Variations Considered & Suggestions from Public Comment: On-Street Parking Removal on One Side of Chorro and/or Broad to provide protected bikeway in-lieu of one-way couplet conversion

Other Variations Considered & Suggestions from Public Comment: Example Chorro Street Two-Way Circulation with Protected Bikeway Example Broad Street Two-Way Circulation with One- Example Example Broad Broad Street Street Two-Way w/ Shared Circulation Lanes with (Existing) Way Protected Bikeway (Parking Removal One Side) Protected Bikeway (Parking Removal Both Sides)

Other Variations Considered & Suggestions from Public Comment: Lincoln Street Alignment 30+% longer trip Broad St

Other Variations Considered & Suggestions from Public Comment: Pre-emptive Cut-Through Mitigation on Lincoln St. Alt 2. (One-Way Couplet): Reverse couplet direction and/or reverse Broad one-way bike lane Align route so cyclists avoid difficult uphill grades: Broad (NB Mountain View to Mission) Chorro (SB/NB approaching Murray & Meinecke) Replace existing speed humps on Broad w/ Speed Cushions Replace existing stop signs on Chorro w/ Traffic Circles Consideration for Aesthetics

Interim vs. Permanent Features

Interim vs. Permanent Features

Interim vs. Permanent Features

BAC Feedback SLO Bicycle Advisory Committee (BAC) received presentation and public input at 7/20 meeting. BAC deliberation focused on challenging balance between improving bicycling vs. neighborhood trade-offs Formal BAC recommendation to pursue Alternative 2 (Broad/Chorro One-Way Couplet) for further development to promote highest potential to increase bike safety & mode share

Community Feedback

Funding Included as CIP Project in 2017-19 Financial Plan FY2017/18 Phase 1 installation: $105k FY 2018/19 Phase 2 installation: $180k FY 2019/20 Phase 2 installation: $270k TOTAL $555k Funding Source: General Fund 36% from SB1 Transportation Funding 64% from General Capital Outlay

Where to Go From Here Council Study Session on Alternatives (8/15): Invite questions & additional public input Request Council guidance on preferred direction Plan Refinement Refine designs & analysis for preferred concept Prepare plan documenting process and final recommendations Final Community Meeting (4 th Quarter 2017) Present refined concept and analysis for preferred alternative Final Plan (early 2018) Present Final Plan to BAC & Council for adoption Phase 1 rollout 2018

Staff Recommendation: Receive presentation and public input on project alternatives; and Provide guidance to staff regarding Council s preferred alternative; and Direct staff to complete Broad Street Bicycle Plan.