Fairfax County Parkway Widening Fairfax County

Similar documents
Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Public Information Meeting

County of Fairfax, Virginia. Department of Transportation

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

I-395 Express Lanes Northern Extension Project Public Hearings

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

Giles Run Connector Road

Project Description Form 6V

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

City of Fairfax, Virginia City Council Work Session

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Route 29 Solutions Projects

Washington DC Section of ITE Project Briefing

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Project Description Form 8EE

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Legislative Update Williamsburg Residency

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Access Management Regulations and Standards

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Terwillegar Drive Expressway Draft Concept Plan

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Application of a Complete Street

WHANGAREI IMPROVEMENTS

I-95/Temple Avenue Improvements Project Colonial Heights, VA

Thank you for attending

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Access Management Regulations and Standards

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

City of Fairfax, Virginia City Council Work Session

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Appendix D: Concept Screening

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Golden s Plan. For the Highway 6 & 93 Corridor

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

INNOVATIVE INTERSECTION DESIGN

I-66 Corridor Improvements Route 15 to I-495. November 2014

Route 29 Corridor Assessment Update. Development of Possible Solutions

Viewing SMART SCALE Application

Foothill Expressway Improvements Between El Monte and San Antonio

Chapter 4 Traffic Analysis

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

Shockoe Bottom Preliminary Traffic and Parking Analysis

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Tysons-Old Meadow Road Bike/Ped Improvements

Project Description Form 8AA

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Welcome to the Quebec Alternatives Analysis Public Meeting

Joshua Jester, E.I., Florida Department of Transportation, District One

Truck Climbing Lane Traffic Justification Report

Lincoln Avenue Road Diet Trial

RM 620 FEASIBILITY STUDY

Financial Project ID No(s).: and ETDM No(s).: and 14181

Route 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015

Rio Intersection Traffic Restrictions Begin Monday

List of Display Boards

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Welcome to the Open House

7th Street Bridge Project. Public Presentation February 24, :30pm-8pm

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Arterial Management Plan for US Route 250 and State Route 623

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Huntington Station Metro Zone / North Kings Highway Concept Plan

Route 79/Davol Street Corridor Study

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

City of Moorhead Committee of the Whole Meeting

Route 1 and Harrison Road Intersection Improvements

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Transcription:

Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions. You may leave the sheet or any other written comments in the comment box, or mail/email your comments. Comments must be postmarked, emailed or delivered to VDOT by Oct. 15, 2018. Contact Information Primary Contact: Sitaram Kodali, P.E. sitaram.kodali@vdot.virginia.gov Andrew Beacher, P.E. andrew.beacher@vdot.virginia.gov Location & Design Preliminary Engineering Mail comments to Mr. Sitaram Kodali at the address below or email meetingcomments@vdot.virginia.gov. Please reference Fairfax County Parkway Widening in the subject line. Project information shared at this meeting will be available online at www.virginiadot.org/projects and at VDOT s Northern Virginia Office. 4975 Alliance Drive Fairfax, VA 22030 4975 Alliance Drive Fairfax, VA 22030 703-691-6710 703-259-2239 www.virginiadot.org Tuesday, Sept. 25, 2018 Willow Springs Elementary School 5400 Willow Springs School Road Fairfax, VA 22030 Public Information Meeting Welcome to the Virginia Department of Transportation s (VDOT) Public Information Meeting on proposed improvements to the Fairfax County Parkway (Route 286). The project will also include an interchange that will consolidate Popes Head Road and the future Shirley Gate Road extension, improvements to the existing trail in the Fairfax County right of way, and construction of a new shared-use path to make the trail continuous within the project limits. We look forward to your active participation. This public information meeting is being held to provide an opportunity for citizens and Project Overview Public Information Meeting Fairfax County Parkway Widening Fairfax County All meeting times are from 6:30 p.m. to 8:30 p.m., presentation starts at 7 p.m. Thursday, Sept. 27, 2018 Fairview Elementary School 5815 Ox Road Fairfax Station, VA 22039 Wednesday, Oct. 3, 2018 Oak View Elementary School 5004 Sideburn Road Fairfax, VA 22032 organizations to give VDOT comments and/or suggestions on the proposed project. VDOT strives to ensure that all members of the community have the opportunity to participate in public decisions on transportation projects and programs affecting them. VDOT representatives are present to discuss the project and answer your questions. A comment sheet is included in this brochure and your input is encouraged. All written comments received on this project will be reviewed by the design team. Brian Costello brian.costello@vdot.virginia.gov Right of Way & Utilities 4975 Alliance Drive Fairfax, VA 22030 703-259-2986 Purpose: Aims to relieve congestion and improve safety Jennifer McCord jennifer.mccord@vdot.virginia.gov Communications 4975 Alliance Drive Fairfax, VA 22030 703-259-1779 Project Length: About 5 miles from Ox Road (Route 123) to TTY/TDD Dial 711 just north of Lee Highway (Route 29) 2018 Commonwealth of Virginia Improvements: Widen the Fairfax County Parkway from four to six lanes from Route 29 to Route 123, build an interchange at Popes Head Road and the future Shirley Gate Road Extension, reconfigure intersections along project limits, improvements to the existing trail in the Fairfax County right of way, and build a new shared-use path to make the trail continuous within the project limits State Project: 0286-029-259, P101, UPC: 107937, Federal: STP-5A01 (775)

Project Description This project aims to reduce congestion and improve safety by widening the Fairfax County Parkway (Route 286) from four to six lanes between Route 29 (Lee Highway) and Route 123 (Ox Road). The project will also include an interchange that will consolidate Popes Head Road and the future Shirley Gate Road extension, improvements to the existing trail in the Fairfax County Parkway right of way and build a new shared-use path to make the trail continuous within the project limits. This project will be implemented as part of a phased approach based on funding availability. Phase 1: Popes Head Road and Shirley Gate Road Interchange Phase 2: Fairfax County Parkway Widening Tonight s meeting is being held to obtain feedback from the community about preliminary design options. Popes Head Road / Shirley Gate Road Extension Interchange Alternative Options Option 1/1A: Triple Roundabouts Direct access to Shirley Gate Road Extension with connections to realigned Popes Head Road Option 1A has additional ramps (highlighted in pink) Build two bridges over Fairfax County Parkway Estimated Project Cost Engineering Design: $14 million Right of Way Acquisition/Utility Relocation: $32 million Construction: Phase 1: $54.6 million Phase 2: $94 million Total Cost: $194.6 million These project costs are estimates and subject to change as the project design is further developed. The project is being financed with federal, state and local funds, including Smart Scale and Northern Virginia Transportation Authority funding. Civil Rights VDOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Mr. Sitaram Kodali at 703-691-6710 or TTY/TDD 711. Anticipated Schedule Public Information Meetings Sept. 25, Sept. 27 and Oct. 3, 2018 Comment Period Ends Oct. 15, 2018 Public Hearing Late 2018/Early 2019 Design Approval Mid 2019 Depending on the delivery method, Phase 1 construction could begin as early as late 2019. Phase 2 construction will be determined as additional funding becomes available. Option 2: Split Diamond Interchange Direct access to Popes Head Road and Shirley Gate Road Extension Similar to existing interchange at Fair Lakes Parkway and Monument Drive Option 2A/2D: Quadruple Roundabouts Direct access to realigned Popes Head Road and Shirley Gate Road Extension Option 2D has additional ramps (highlighted in pink) Build two bridges over Fairfax County Parkway Right of Way Preliminary right of way impacts presented on the displays are conceptual in nature and may change as the design is refined. The property owners will be informed of the exact location of the easements during the right of way acquisition process and prior to construction. Information about right of way purchase is discussed in VDOT s brochure, Right of Way and Utilities: Guide for Property Owners and Tenants. Copies of this brochure are available here from VDOT personnel. After this meeting, information regarding right of way may be obtained from the right of way contact listed on the back of this brochure. Environmental Review In cooperation with the Federal Highway Administration (FHWA) and in accordance with the National Environmental Policy Act (NEPA) and 23 CFR 771, VDOT will be initiating an environmental study to evaluate potential impacts from the project to socio-economic, natural and historic resources, including potential traffic noise impacts. VDOT will coordinate the appropriate federal, state and local agencies as part of the environmental review and approval process required during project design.

Public Information Meeting Fairfax County Parkway Widening Fairfax County www.virginiadot.org All meeting times are from 6:30 p.m. to 8:30 p.m. Presentation starts at 7 p.m. Tuesday, Sept. 25, 2018 Willow Springs Elementary School 5400 Willow Springs School Road Fairfax, VA 22030 Thursday, Sept. 27, 2018 Fairview Elementary School 5815 Ox Road Fairfax Station, VA 22039 Wednesday, Oct. 3, 2018 Oak View Elementary School 5004 Sideburn Road Fairfax, VA 22032 COMMENT SHEET Federal Project: STP-5A01 (775), State Project Number: 0286-029-259, P101, UPC: 107937 All comments are subject to public disclosure. Name (optional): Address (optional): Email (optional): 1. Which of the following best applies to you? I live on a street that intersects with Fairfax County Parkway. If so, where? I live in a neighborhood adjacent to Fairfax County Parkway. If so, where? I commute on Fairfax County Parkway. Other 2. Which interchange option do you prefer? Why do you prefer the option selected? Option 1: Triple Roundabouts Option 1A: Triple Roundabouts with Additional Ramps Option 2: Split Diamond Interchange Option 2A: Quadruple Roundabouts Option 2D: Quadruple Roundabouts with Additional Ramps Other 3. Please provide us with any additional information or suggestions that will assist in the completion of the project. 4. How did you hear about this meeting? Newspaper Social Media Website Other: Please leave this comment sheet at the designated location, mail your comments (postmarked October 15, 2018) to the addressee on the reverse side, or email to meetingcomments@vdot.virginia.gov. Please include Fairfax County Parkway Widening in the email subject line.

Fold Line Postal Service will not deliver without a stamp Virginia Department Of Transportation Northern Virginia District Sitaram Kodali, P.E. 4975 Alliance Drive Fairfax, VA 22030 Fold Line

Fairfax County Parkway (Route 286) Widening Project Route 29 (Lee Highway) to Route 123 (Ox Road) State Project No. 0286-029-259, P101; UPC 107937 September 25 th, 27 th, and October 3 rd, 2018 6:30 to 8:30 PM Public Information Meetings

Purpose of Tonight s Meeting Inform you of where we are in the project process and follow-up of community meetings Inform you of updated concepts developed for the proposed interchange with Popes Head Road/Shirley Gate Road Extension and other improvements along the corridor Discuss preliminary noise analysis findings Answer questions and hear your concerns Nick Roper, VDOT District Engineer for Project Development Andy Beacher, VDOT, Project Sponsor John Maddox, WRA, Design Consultant Alex Nies, MT, Noise Consultant Sitaram Kodali, VDOT, Design Project Manager

Project Objectives Reduce recurring congestion along the corridor Provide access to future Patriot Park development and the future extension of Shirley Gate Road Improve safety at crash hot-spots Provide multimodal accommodations for pedestrians and bicyclists Grass Median Median Barrier

Project Overview Widening Fairfax County Parkway (FCP) to provide third lane in each direction Improvements to intersections within project limits Interchange at Popes Head Road Includes access to future FCPA entrance at Patriot Park and the future extension of Shirley Gate Road Upgrades to shared use path Other Design Considerations Environmental: NEPA document, noise analysis Right-of-way impacts

Public Outreach

Route 123 (Ox Road) Interchange

Route 123 Interchange Traffic Operations Travel times compared along southbound Fairfax County Parkway from Burke Centre Parkway to southbound Route 123 at Chapel Road Key Findings 2046 Build condition travel times are similar to existing conditions Significant benefits with added turn/thru lanes SB FCP at Burke Centre Pkwy to SB Route 123 at Chapel Rd Minutes 10 8 6 4 2 0 8.6 min 3.6 min 4.0 min Existing 2046 No Build 2046 Build

Burke Centre Parkway Intersection Right-In/Right-Out Eliminates existing traffic signal Prohibits all left turn and U-turn movements at Burke Centre Parkway Requires grade separation of pedestrian crossing of Fairfax County Parkway

Shared Use Path Crossing Project Team is currently evaluating 3 options: Option A: Pedestrian Bridge Option B: Railroad Underpass Option C: Fairfax Station Underpass Construct new pedestrian bridge spanning Fairfax County Parkway (FCP) at Burke Centre Parkway At grade crossing required at Fairview Woods Drive Shared use path adjacent to Norfolk Southern Railroad (NSRR) track crossing underneath FCP New shared use path along east side of FCP and crosses Burke Centre Parkway at grade Requires approval and easements from NSRR Shared use path adjacent to Fairfax Station Road crossing underneath FCP New shared use path along east side of FCP and crosses Burke Centre Parkway at grade Requires widening of Fairfax Station/NSRR bridge

Ladues End Lane and Nomes Court Intersection Left-In with Restricted Crossing U-Turn (RCUT) Removes left turning movement exiting from Ladues End Lane and Nomes Court Current Ladues End Lane left out movement must turn right and use RCUT or Route 123 interchange to travel north Current Nomes Court left out movement must turn right and use the Popes Head Road interchange to travel south

Popes Head Road and Shirley Gate Road Extension Preliminary Interchange Options (April 2018) Option 1 Triple Roundabouts Option 2 Split Diamond Option 2A Quadruple Roundabouts

Popes Head Road and Shirley Gate Extension Interchange Option 1A: Triple Roundabouts with Additional Ramps Direct access from FCP to Popes Head Road and Shirley Gate Road Extension Popes Head Road and Shirley Gate Extension bridges spanning existing Fairfax County Parkway Estimated Construction Cost = $61M

Popes Head Road and Shirley Gate Extension Interchange Option 2: Split Diamond Direct access from FCP to Popes Head Road and Shirley Gate Road Extension Fairfax County Parkway to be below existing grade; access ramps and crossovers to match existing grade Estimated Construction Cost = $69M

Popes Head Road and Shirley Gate Extension Interchange Option 2D: Quadruple Roundabouts with Additional Ramps Direct access from FCP to Popes Head Road and Shirley Gate Road Extension Popes Head Road and Shirley Gate Extension bridges spanning existing Fairfax County Parkway Estimated Construction Cost = $67M

Popes Head Road and Shirley Gate Extension Interchange Options Comparison Criteria Option 1A: Triple Roundabouts Option 2: Split Diamond Option 2D: Quadruple Roundabouts Provides Direct Access between Fairfax County Parkway and Popes Head Road/Shirley Gate Extension Intersection Level of Service (LOS) and delays Constructability/Maintenance of Traffic Safety Improvements Bike and Pedestrian Accommodations Environmental/Patriot Park Impacts Increase in traffic noise levels Right of Way Impacts Estimated Construction Cost $61M* $69M* $67M* Legend Excellent Favorable Fair Unfavorable Poor *$54.6M in funding available for construction (includes $4M for design) **Design revisions will be investigated for each option

Interchange Option 1 and Option 1A Comparison Option 1 Estimated Construction Cost: $53 Million Option 1A Estimated Construction Cost: $61 Million Based on public input, features added in Option 1A: Ramp northbound Fairfax County Parkway to eastbound Popes Head Road Ramp westbound Popes Head Road to northbound Fairfax County Parkway Ramp eastbound Popes Head Road to southbound Fairfax County Parkway

Interchange Option 2A and Option 2D Comparison Option 2A Estimated Construction Cost: $58 Million Option 2D Estimated Construction Cost: $67 Million Additional features included in Option 2D: Direct ramp from Popes Head Road to northbound Fairfax County Parkway Direct ramp from westbound Shirley Gate Extension to southbound Fairfax County Parkway

Popes Head Road Interchange Traffic Operations Key Findings All five options have acceptable operating conditions Existing: Popes Head Road motorists have delays of up to 10 minutes to enter FCP (AM peak) 2046 Design Year: 2-3 minutes maximum to travel through the interchange No single option is preferred based on traffic operations Option 1 Option 1A Option 2 Option 2A Option 2D

Improvements to Northern Section Widening ties into existing 6- lane roadway section north of Route 29 Interchange Grass median south of Route 29 interchange; concrete median barrier from south of Route 29 interchange north Shared Use Path upgrades on east side of Fairfax County Parkway

Fairfax County Parkway Travel Times 2046 No Build Conditions No improvements along Fairfax County Parkway Southbound travel times are 12-13 minutes greater than existing conditions 2046 Build Conditions Includes: Fairfax County Parkway widening Popes Head Road interchange Burke Centre Parkway signal removal Northbound AM Peak 15 minute travel time savings Southbound PM Peak 18 minute travel time savings 45 50 mph travel speeds Minutes Minutes 30 25 20 15 10 5 0 30 25 20 15 10 5 0 Fairfax County Parkway South of Route 123 to US 29 AM Peak Hour 16.0 Northbound Southbound Northbound Southbound Northbound Southbound Existing 2046 No Build 2046 Build Fairfax County Parkway South of Route 123 to US 29 PM Peak Hour 8.4 8.0 13.7 22.8 9.4 20.1 26.5 Southbound Southbound Northbound Northbound Northbound Southbound 7.4 7.4 Existing 2046 No Build 2046 Build 7.6 8.3

Preliminary Noise Analysis Summary Slide Total of 4 new noise barriers considered feasible and reasonable One existing barrier replacement on the west side of Fairfax County Parkway between Route 123 and Clara Barton Drive considered feasible and reasonable Noise Analysis Process

Draft Preliminary Noise Analysis Fairfax County Parkway at Route 123 Interchange

Draft Preliminary Noise Analysis Fairfax County Parkway at Burke Centre Parkway

Draft Preliminary Noise Analysis Fairfax County Parkway at Ladues End Lane and Nomes Court

Draft Preliminary Noise Analysis Fairfax County Parkway at Popes Head Road and Shirley Gate Extension Interchange

Draft Preliminary Noise Analysis Fairfax County Parkway at Braddock Road Interchange

Draft Preliminary Noise Analysis Fairfax County Parkway at Route 29 Interchange

Project Schedule: Milestones Dates Public Information Meeting December 7, 2017 Begin Noise Study January 2018 Public Outreach Meetings January April 2018 Draft Preliminary Noise Study Completion Mid 2018 Public Information Meetings September October 2018 Public Hearing Late 2018/Early 2019 Design Approval Mid 2019 Phase 1 Construction Popes Head Road/Shirley Gate Road Interchange o Award Design Build Contract/Begin Construction o Completion of Construction Late 2019 Late 2022 Phase 2 Construction Fairfax County Parkway Widening To be determined as additional funding becomes available

Estimated Project Cost and Funding Project Estimate and Budget Project Popes Head Interchange and FCP Widening Current Funding Awarded Preliminary Engineering These project costs are estimates and subject to change as the project design is further developed. Project Amount Source Date Awarded Phase Phase 1: Popes Head Interchange $4M Fairfax County FY2016 Construction Phase 1: Popes Head Interchange $50.6M Smart Scale FY2018 Construction Phase 2: FCP Widening $25.5M NVTA & RSTP 7/14/2016 Right of Way & Design Popes Head Interchange and FCP Widening $67M NVTA 6/14/2018 Construction Total: Right of Way/ Utility Relocation $147.1M Construction Subtotal Total Phase 1: $9.7M Phase 1: $54.6M $64.3M Smart Scale Budget Phase 2: $14M Phase 2: $22.3M Phase 2: $94M $116.3M $194.6M

Summary Recommended Design Features Route 123 improvements Widening with grass median from Route 123 to Route 29 Burke Centre Parkway intersection Ladues End Lane and Nomes Court intersection Widening with concrete median barrier through Route 29 interchange Shared use path location Further Design Required Final configuration of interchange Shared use path crossing Final noise analysis

Questions? Contact Information Email Comments to: meetingcomments@vdot.virginia.gov Please include Fairfax County Parkway Widening in the subject line Project information for this meeting is available online at: www.virginiadot.org/projects VDOT s Northern Virginia Office

Comments and Questions?