Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Similar documents
Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

Clackamas County Comprehensive Plan

5.0 Roadway System Plan

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Albany Shaker Road Corridor Study Public Meeting # 2

Project Kickoff Meeting February 15, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

Route 7 Corridor Study

Executive Summary June 2015

Performance Criteria for 2035 Long Range Transportation Plan

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Planning Guidance in the 2012 AASHTO Bike Guide

TRAFFIC IMPACT ANALYSIS

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

Classification Criteria

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Access Management Regulations and Standards

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Chapter 5 Future Transportation

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Report. Typical Sections. City of Middleton, WI

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

RETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE

Preliminary Transportation Analysis

Prince George s County plans, policies, and projects

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

VT15 / Allen Martin Drive Intersection Scoping Study

Preliminary Engineering Study

Highway 217 Corridor Study. Phase I Overview Report

POLICY: TRAFFIC CALMING

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Angie Silva Kitsap County Commissioners Office Stef Herzstein, PE, PTOE Transpo Group Jessica Lambert Transpo Group

Freeway System Considerations

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

What Is a Complete Street?

TECHNICAL MEMO #1 EXISTING CONDITIONS

This chapter describes the proposed circulation system and transportation alternatives associated with

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Front and Myrtle Improvement Project

Regional Transportation Needs Within Southeastern Wisconsin

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Reams Road RCA Study. Board of County Commissioners Public Hearing

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Design Public Hearing MassDOT Project # February 19, 2015 Chatham Town Hall Annex 7:00 P.M.

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

7 Complete Streets & Roadway Aesthetics

Solana Beach Comprehensive Active Transportation Strategy (CATS)

COMMUNITY MEETING AGENDA

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Living Streets Policy

Welcome to the Open House

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

Executive Summary Route 30 Corridor Master Plan

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

North Coast Corridor:

City of Bartow Comprehensive Plan. Transportation Element

San Jose Transportation Policy

Route 4 Corridor Study

TRASBURG RANSPORTATION

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

TRAFFIC STUDY GUIDELINES Clarksville Street Department

CONTENTS EXECUTIVE SUMMARY 1

Basalt Creek Transportation Refinement Plan Recommendations

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

2. TRANSPORTATION ELEMENT.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Development of Arlington County s Marked Crosswalk Guidelines. Jon Lawler, P.E. Design Engineer Arlington County, VA

I-105 Corridor Sustainability Study (CSS)

Giles Run Connector Road

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Dewey Avenue Corridor Traffic Calming Study Town of Greece and City of Rochester, NY Executive Summary, September 2010

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Route 29 Corridor Assessment Update. Development of Possible Solutions

TRANSPORTATION & MOBILITY

Transcription:

Town of Bethlehem US 9W Corridor Transportation Planning Assessment Presented e to: Bethlehem Town Board June 2009

Overview Study Background Route 9W Corridor Conditions and Improvements Selkirk Bypass Options and Recommendation Costs, Financing, Next Steps

US 9W Study Background Introduction: Identified as Tier 1 priority in 2005 Comprehensive Plan Cooperative effort between T. of Bethlehem and CDTC Funded under CDTC s Linkage Study Program Participants: Route 9W Study Advisory Committee - Residents, NYSDOT, CDRPC, CDTA, ACDPW Wilbur Smith Associates

US 9W Study Background Purpose: Identify US 9W transportation improvements needed to implement 2005 Comprehensive Plan Identify transportation and land use actions needed to support planned development in corridor Improve US 9W visual environment Review feasibility of Northern Selkirk Bypass Alignment Work toward development of financial plan for recommended improvements

US 9W Study Background Guiding Principles: Transportation systems are important to the local and regional economy, and quality of life Transportation plans should not focus solely on the automobile, but should also promote other travel modes Transportation planning is also about creating attractive and livable communities Land use decisions are important in building workable transportation systems & quality communities Funding is a significant constraint Environmental protection is an important component

US 9W Study Background Study Area: Hanney Lane in the north to Cottage Lane in the south Six miles

US 9W Existing Conditions Natural Features: Topography Wetlands Soils Water Features Floodplains Steep Slopes

US 9W Existing Conditions Cultural Features: Land Use Zoning Development Activity Historic Properties Agricultural Resources Visual Environment Municipal Services

US 9W Transportation Conditions Transportation Features: Road Network / Traffic Arterial Access Pedestrian Circulation Bicycle Circulation Safety Transit Service Truck Traffic

US 9W Transportation Conditions 9W Traffic Conditions: 8,000 to 16,000 vehicles/day 40% traffic increase since 1990 54% trip generation increase Analysis (pm peak) shows: - Signalized intersections = LOS D or better - Unsignalized intersections = LOS D or better - 9W mainline well below its capacity Exceptions - WB left at Farm Family = LOS F - WB at Magee Drive = LOS F - EB at Creble Road = LOS E - Mainline between Feura Bush Rd. & Rte. 32

US 9W Transportation Conditions 9W Safety Conditions: Analyzed 3-year crash data 65% at mid-block locations 25% at signalized intersections High crash segments: - 9W from Feura Bush to Beacon Road - 9W from Wemple Road to Hague Blvd High crash intersections: - 9W at Bender Lane/Farm Family - 9W at Maple Avenue/Bridge Street

US 9W Transportation Conditions Highway Access: 200+ access points - Interrupts traffic flow, reduces capacity, contributes to congestion - Increases vehicle hil conflicts, flit contributes tibt to crashes Pedestrian & Bicycle Circulation: Limited sidewalks, pedestrian signals, crosswalks - Discontinuous sidewalks north of Feura Bush Road - Absence of facilities south of Feura Bush Road - Few linkages to area neighborhoods No facilities designed specifically for bicycles - Limited, narrow or no shoulders - High traffic volumes and travel speeds -Bicycle LOS E for most segments

US 9W Transportation Conditions Public Transit: CDTA Route 7 - Service along 9W north of Feura Bush Road - 450% increase in ridership since 2003 Truck Traffic Issues: Maple Avenue truck traffic - Residential nature of street through Selkirk -Links 9W and industrial area with Thruway Exit 23 - Carries 525 trucks per day (20% of volume) - Creates safety / quality of life issues for residents

US 9W Transportation Conditions 9W Traffic Forecast: 20 year growth scenario - Based on current zoning, development activity, it past growth trends, development constraints - 3.7 million S.F. of nonresidential space - 2,300 housing units Traffic forecast - Conducted d for PM peak hour - 9,000 new PM trips - Increase from 5,600 to 14,700

US 9W Transportation Conditions 20 Year Traffic Impacts: Summary - Traffic volumes increase significantly but conditions remain tolerable and acceptable for most of the day and at most locations - Major corridor-wide improvements are not necessary Projected 2026 deficiencies - Mainline exceeds maximum capacity From Feura Bush Road to Route 32 - Intersections experience LOS F North Town Center Drive Feura Bush Road Bender Lane Wemple Road

US 9W Transportation Conditions 20 Year Traffic Impacts (continued): Other deficiencies - Increased traffic volumes exacerbate pedestrian and bicycle facility deficiencies - Higher traffic volumes increase likelihood of additional crashes at high h crash locations

US 9W Recommended Actions Route 32 to Feura Bush Road: Travel Lanes Raised Center Median Roundabouts Sidewalks Bike Lanes Bus Stops / Circulation Right in Right out Shared Driveways Shared Use Path Streetscape Enhancements

US 9W Recommended Actions Feura Bush Road to Beacon Road: Raised Center Median Flush Center Median Possible Roundabout Potential Roadway Sidewalks Bike Lanes Shared Access or Right in Right out Plaza Driveways Shared Use Path Streetscape Enhancements

US 9W Recommended Actions Beacon Road to Wemple Road: Median at Intersections Roundabout Shared Access or Right in Right out Sidewalks (one side) 5 Shoulder Street Trees Hamlet Zoning

US 9W Recommended Actions Wemple Road to Creble Road: New Collector Roads Median at Intersections Roundabout Shared Access or Right in Right out Sidewalks to Jericho 5 Shoulder Street Trees Hague Traffic Calming

US 9W Recommended Actions Creble Road to Maple Avenue: Selkirk Bypass Corridor Roundabout Median at Intersections Sidewalks to School Off-Road Connection 5 Shoulder Street Trees Zoning Amendment

Selkirk Bypass Evaluation History: Dates to 1989 Route 9W Study Placed on regional TIP in 1993 Stalled over alignment issues Purpose: Review feasibility of Creble Road area alignment Evaluate relative merits of northern, central and southern alignments

Selkirk Bypass Evaluation Guiding Principles / Goals: Improve quality of life by removing trucks from Rt. 396 Establish economic development opportunities Reduce 9W traffic burden and improvement needs Minimize residential, business & environmental impacts Create opportunities for private sector participation p in funding the new roadway

Selkirk Bypass Evaluation Alignment Options: Northern - near Wemple Road Central -near Creble Road Southern - south of Maple Ave

Selkirk Bypass Evaluation Recommended Alignment: Central alignment near Creble Road - Removes substantial truck volume from Maple Avenue - Satisfies quality of life and safety objectives - Provides direct route from Thruway to industrial area - Removes trucks from 9W and allows turn-free access - Provides access to hundreds of acres of developable land - Creates significant economic development opportunities - Creates significant opportunity for private sector participation in capital improvements and construction of road - Provides reduced travel time, distance and cost benefits to truckers

Selkirk Bypass Evaluation Roadway Design: Two travel lanes 35-40 mph design speed Street trees, shoulders Pedestrian and bicycle Sensitivity to environment and existing residences Access management

Costs & Funding Costs: $27 40 million 9W Improvements $24.7 million Bypass to Thruway $11.1 million Bypass to Rt. 396 Funding: $ 12 million on Regional TIP

Costs & Funding Public Funding Sources: CDTC Spot Improvement Program Transportation Enhancement Program CMAQ Program Transportation, Community and System Preservation Recreation Trails Program Safe Routes to School Private/Public Funding Sources: GEIS Mitigation Fees Project Specific SEQR Mitigation Transportation Development District

Town of Bethlehem US 9W Corridor Transportation Planning Assessment Thank you!