Old Woodward Ave & W Maple Road. Streetscape Design Presentation February 2, 2017

Similar documents
FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Lawrence Avenue Streetscape Concepts August 30, 2011

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

UDC Street Cross Sections

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

PUBLIC REALM MASTER PLAN

Ocean Park Boulevard Green Street Project Community Workshop

Bicycle + Pedestrian Connectivity Gap Analysis

Transportation Planning Division

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Observations and Ideas: Toomer s Corner Streetscape Improvements

INTERCHANGES. Module 7

APPENDIX 1 CIMA RECOMMENDED TREATMENTS

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Tonight is for you. Learn everything you can. Share all your ideas.

PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS

TRANSPORTATION STANDARDS

York Boulevard Streetscape Master Plan

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

E Grand Complete Street Pilot Project

S. Broadway Improvements Council has made a total of $533,000 available to fund streetscape improvements, mainly to the 3400 block of S Broadway

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening


MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

6.4 RECOMMENDED IMPROVEMENTS

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

10.0 CURB EXTENSIONS GUIDELINE

1.3 Pedestrian Environments

Plainfield Gateway. Plainfield Context

CURBSIDE ACTIVITY DESIGN

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Access Management in the Vicinity of Intersections

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Complete Streets. Designing Streets for Everyone. Sarnia

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

A. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Transportation Planning Division

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Hospital Link Project Project Update September 2017

North Avenue Corridor Study

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Street Design Workshop. Existing cross section Traffic volumes Examine adjacent land uses You design future improvements

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Omaha s Complete Streets Policy

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Why invest in the 1 Street S.W. Corridor?

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

CITY OF BIRMINGHAM PLANNING BOARD ACTION ITEMS OF WEDNESDAY, MAY 22, 2013

Derby Street. Project Updates. Salem, Massachusetts

Option W: N. Washington Street Project

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

METROLINA PARK CHARLOTTE, NORTH CAROLINA

McLean Main Street Public Forum Follow-up

Active Transportation Facility Glossary

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Designing Complete Streets: What you need to know

Flatbush Avenue

WELCOME. Traffic & Parking Commission Special Meeting May 30, Iteris, Inc. All rights reserved.

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Henderson Ave. Complete Streets Project

Town Hall Meeting. June 13, 2018 PianoForte 1335 S. Michigan Ave.

Prince George s County plans, policies, and projects

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Zlatko Krstulich, P.Eng. City of O9awa

East Burke Transportation, Safety and Capacity Improvements

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

LAKE-TO-LAKES TRAIL. City Planning Commission October 7, 2014

STREETSCAPE CONCEPT PLAN

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use

Lincoln Neighborhood Corridor Plan The LiNC

Enhancing Downtown

City of Wilsonville 5 th Street to Kinsman Road Extension Project

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

What Is a Complete Street?

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

PROJECT KEY TYPICAL SECTION 1 =60

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

Physical Implications of Complete Streets Policies

NCHRP Superelevation Criteria for Sharp Horizontal Curves on Steep Grades. Research Team: MRIGlobal Pennsylvania State University

Station 1: Street & Sidewalk Upgrades

Transcription:

Old Woodward Ave & W Maple Road Streetscape esign Presentation February 2, 2017

Revisions To The esign Concept Per The City Commission 2 Add planted medians to Old Woodward Ave center turn lane; Hamilton Row & Old Woodward Ave, Merrill Street & Old Woodward Ave Add protective median islands where possible at crossings to protect pedestrians; Maple Road & Pierce Street (alley access) Relocate mid-block pedestrian crossing at East Maple to the Cafe Via passage»» Study the possibilities of narrowing Old Woodward mid-block crossing to add parking

Recommended Street Section Phase I Center Medians I Old Woodward Ave 3 R WA O W MAPLE ROA PIERCE ST PROVIE planted median TO PROTECT CROSSWALK N E AV WO L O M HA ON ILT W RO Provide rolled curb and unit pavers to minimize the OCCASIONAL impact of larger turning motion conflicts WA O Provide rolled curb and unit pavers to minimize the OCCASIONAL impact of larger turning motion conflicts WO L SO ILL RR ME ST PROVIE planted median TO PROTECT CROSSWALK E AV E MAPLE ROA R

Recommended Street Section Phase I Center Medians I Old Woodward Ave & Merrill Street 4 planted median with signage mid-block crossing signage PASSAGE ENTRY mid-block crossing seating area MI-BLOCK CROSSING UNIT PAVERS ROLLE CURB limit of turning radii conflict CROSSWALK

Recommended Street Section Phase I Center Medians I Old Woodward Ave & Hamilton Row 5 left turn lane planted median ANGLE parking UNIT PAVERS ROLLE CURB limit of turning radii conflict CROSSWALK

Recommended Street Section Phase II Alley Access I Maple Road 6 RIGHT TURN ONLY R ONE WAY Restrict service vehicle access off MAPLE ROA; SERVICE VEHICLE ACCESS PROVIE OFF OF WILLITS ALLEY PIERCE ST NO SERVICE ACCESS N ON LT MI HA W MAPLE ROA 27 maple road crosswalk 10-0 wide A W O O W W RO WA O WO L SO E AV LL I RR ME E MAPLE ROA R OL E AV ST

Recommended Street Section Phase II Alley Access I Maple Road 7 PLANTE MEIAN ALLEY EXIT APRON ROLLE CURB 27 maple road crosswalk

Recommended Street Section Phase II Mid-Block Crossing I Maple Road 8 PASSAGE ENTRY 8 12 12 8 40 curb-to-curb e maple road mid-block crossing 10-0 wide SEATING AREA S OL WOOWAR AVE N OL WOOWAR AVE E MAPLE ROA HAMILTON ROW RELOCATE mid-block crossing TO ALIGN WITH PASSAGE CROSSING IS 10-0 WIE (8-0 MIN WITH) PER MULTI-MOAL STANARS PROPOSAL CANNOT REUCE CROSSING WITH UE TO a) VISIBILITY ISSUES WITH CROSSING BETWEEN CARS AN b) REUCING CROSSING WITH WILL NOT ALLOW ENOUGH SPACE TO ACCOMMOATE AITIONAL PARKING 4 TOTAL PARKING SPACES REMOVE

Recommended Street Section Phase II Mid-Block Crossing I Maple Road 9 PASSAGE ENTRY MI-BLOCK CROSSING MI-BLOCK CROSSING SIGNAGE SEATING AREA

E MAPLE ROA Recommended Street Section Phase I Mid-Block Crossing I Old Woodward Ave 10 N OL WOOWAR AVE HAMILTON ROW MI-BLOCK CROSSING 12-0 WIE; ALIGNE WITH PASSAGE MERRILL STREET SEATING AREA OL WOOWAR AVE midblock crossing 12-0 S OL WOOWAR AVE 14 14 SEATING AREA CROSSING IS 12-0 WIE (10-0 MIN WITH) PER MULTI-MOAL STANARS PROPOSAL CANNOT REUCE CROSSING WITH UE TO a) VISIBILITY ISSUES WITH ON COMING TRAFFIC AN b) REUCING CROSSING WITH WILL NOT ALLOW ENOUGH SPACE TO ACCOMMOATE AITIONAL PARKING PASSAGE ENTRY 4 TOTAL PARKING SPACES REMOVE

Recommended Street Section Phase I Mid-Block Crossing I Old Woodward Ave 11 PASSAGE ENTRY PLANTE MEIAN MI-BLOCK CROSSING ROLLE CURB MI-BLOCK CROSSING SIGNAGE SEATING AREA

Conclusion 12 Next Steps > > esign Study irects Final Engineering Process > esign Adjusted to accurate site survey, not changed > > ocumentation for Bidding (with alternates) & construction > > The evil is in the etails - many fine-grain items still need to be resolved (i.e. paving markings, signage location, construction details & specifications) > > Many Landscape Architecture Elements to be Fully eveloped (i.e. hardscape material selection & details, plant selection & soils, fine grading & site furniture locations)