Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Similar documents
Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Cloudways

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Nottingham Cycle City Frequently Asked Questions

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Living Streets response to the Draft London Plan

Chelmsford City Growth Package

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

WHANGAREI IMPROVEMENTS

MARKHOUSE ROAD IMPROVEMENTS

2. Context. Existing framework. The context. The challenge. Transport Strategy

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised

Welcome! Public Open House on UBC s Transportation Plan

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

Bristol City Council has produced a draft Bristol Transport Strategy document.

Design Workshops Summary of all Feedback January 2017

Bulwell Cycling Consultation

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

9. Parking Supporting Statement

FAQ s Walsh Road / Ferguson Road Pilot Scheme

Why invest in the 1 Street S.W. Corridor?

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

MILTON ROAD LLF PROJECT UPDATE

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Chapter 5 Future Transportation

RESTRICTED ROADS (20 MPH SPEED LIMIT) (SCOTLAND) BILL. 1. Is reducing the speed limit to 20mph the best way of achieving the aims of the Bill?

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Active Travel Strategy Dumfries and Galloway

GETTING WHERE WE WANT TO BE

City of Waterloo Complete Streets Policy

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

CUERDEN TRANSPORT PROPOSALS

Maynooth Cycling. Presentation to Maynooth Community Council 14 December 2015

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

Martlesham Heath: January 23 rd 2014

C.A.R.S. Project Design Report.

KIGALI CITY, RWANDA MODERNIZATION OF TRANSPORT INFRASTRUCTURE AND SERVICES. Presentation to ITC, UTwente Enschede 13 June 2018

I write in response to the current consultation. I am copying this to Derrick Ashley and I will be posting this online.

Launceston's Transport Futures. Greater travel options for the people of Launceston

PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

Ajax: The Road to Complete Streets

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

CHAPTER 7.0 IMPLEMENTATION

Transportation Master Plan Advisory Task Force

Sevenways Roundabout, and the need for a Road Safety Scheme:

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

TRANSPORTATION NEEDS ASSESSMENT

ENFIELD TOWN THE REVISED DESIGN

Tonight is for you. Learn everything you can. Share all your ideas.

Mill Hill Broadway Capacity Improvement

Regional Bus Priority

Bicycle Master Plan Goals, Strategies, and Policies

to the Public Information Centre for the Downtown Traffic Study

The Bike Buzz in Richland. November 2017 Carl Berkowitz

Living Streets Policy

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

Appendix N(b): Portishead Station Outline Travel Plan

Dodder Greenway Emerging Preferred Route Consultation - October 2018

Building An Active Travel Future for Northern Ireland Consultation Response

Devonport City Cycling Network Strategy

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

Fitting Light Rail through Well-established Communities

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Maynooth Cycling Submission on North South Corridor

Community engagement guide May 2018

Cycle Network Background Paper

Cycle Superhighway 4 from Tower Bridge to Greenwich

North Coast Corridor:

Chelmsford City Growth Package

Reflections on our learning: active travel, transport and inequalities

Warfield Neighbourhood Plan: 4.4 Infrastructure

1.0 Introduction. Long standing options identified in the 2006 South Marston Village Report.

Durham Region Long Term Transit Strategy

Dowling/Beaty Cycling Route

PEDESTRIAN ACTION PLAN

A30 Chiverton to Carland Cross Moving forward: The application

ABERDEEN: CITY OF THE FUTURE

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

Transportation Assessment

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Building a Toronto that Moves

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Douglas Land Use and Transportation Study

Phone: Ref No: 06/2018/0884

NW Bicester Masterplan. Access and Travel Strategy Appendix 2 Walking and Cycling Linkages

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Transcription:

Overview of project: The Ladygrove Link will provide a modern, direct, off-road, active travel route from the new Didcot North East development and new leisure centre to the strategic Cow Lane Tunnel. The link will go through the Didcot North East development and use existing shared use paths through the Ladygrove to form a spine route. The Link has the potential to rival car journey times into the town centre, Didcot Parkway and beyond. The Didcot North East development is, for most people, too far to walk regularly to get to the town centre, secondary schools, Didcot Parkway etc. This link provides a credible transport alternative. Project Detail: From Cow Lane Tunnel, the route uses the existing, well used and popular Ladygrove cycle / pedestrian path network. Parts of the route may need to be upgraded or in places, parallel footpaths built to cope with increased cycle traffic as Didcot North East develops. In the Ladygrove the path only crosses two roads; Tyne Avenue and Blackwater Way. Currently at these crossing points road traffic has priority. They both have traffic calming that provide a level crossing surface for cyclists and pedestrians. New shared space Zebra crossings with cycle lanes would be built to change priority to cyclists and pedestrians. The cost of the crossings could be reduced by using the existing, level, crossing surface. This would not adversely affect traffic flow. The Northern Distributor Road is a main crossing point of the route into Didcot North East. The Didcot North East development and future road plans means that this stretch of road will become very much busier. A surface level crossing would not be suitable for this road, even with speed limits. Surface level crossings such as a Toucan crossing would do very little to remove the barrier of the road and integrate Didcot North East into the rest of the town and leave the development isolated. A surface level crossing would also affect the traffic flow of the road which, in itself, could cause congestion. To cross the Northern Distributor Road an active travel underpass is proposed. This would keep traffic flowing and not impede the active travel route, ensuring the travel time is still comparable or better than using motor transport. The underpass should be carefully designed so that it is not intimidating to use i.e. it is well lit, spacious, with graffiti resistant walls and clear lines of view, possibly with CCTV. Discussions with the developers of Didcot North East should start at an early stage of planning to ensure that the route continues into the development. The underpass should be built at a very early stage of the development. Page 1 of 6

Page 2 of 6

List of potential sub-projects: ( is an estimate of how easy / costly a sub-project is. Examples are; is there an existing right of way / landowner issues? Does it require significant design work? Does it need to wait for future development? Is it a case or re-surfacing / re-allocation of space? Modify two existing crossing points in the Ladygrove to shared use Zebra crossings. Existing level surfaces, minimal work needed for conversion. No known issues, could be carried out at any time Upgrade route through Ladygrove to increase capacity of cyclists and pedestrians. Widen whole path in some places. In other places build a parallel footpath. No known issues, could be carried out at any time. Northern Distributor Active Travel Underpass New tunnel under road. Needs to be carried out very early in Didcot North East development so that new residents are given the travel choice from the start. Needs developer co-operation due to land ownership. Will need to be funded. Will cause disruption on road during construction. May be issues with proximity of a stream at the proposed site of the underpass. Extension into Didcot North East Route needs to run through Didcot North East and connections to the route need to be made in the development. Needs co-operation of the developer and for them to build the route and connections. Need to guide developer to what is required. Will need to be built at an early stage so that new residents are given the travel choice from the start. Page 3 of 6

Assessment of project against the five requirements for good cycle infrastructure: Requirement Cohesion Directness Safety Comfort Attractiveness Information about how the requirement has been met. The route would be continuous from the end of Didcot North East through to Cow Lane Tunnel. The route should be signed as part of a Science Vale Cycle Network and be easily identified as such. The route is a very direct straight route to Didcot Parkway and Didcot Town Centre. The route only crosses two roads on the Ladygrove and will run under the Northern Distributor Road. The route is very safe and will feel safe. The existing part of the route is already a good level surface and clear of any obstructions. There may need to be widen the path in places. The route is off road throughout, running at the edge of Ladygrove Park and lakes. It is suitable for all cyclists and will ensure all new residents in Didcot North East have active travel as a real option. Page 4 of 6

Does the project meet the goals of LTP4? Goal To support jobs, housing growth and economic vitality. To support the transition to a low Carbon future To support social inclusion and equality of opportunity. To protect and where possible enhance Oxfordshire s environment. To improve public health, safety and individual wellbeing. Goal Met? Information about how the goal has or has not been met. This project directly supports housing growth at Didcot North East. It ensures that that residents have a real transport alternative to employment sites, Didcot Parkway and town centre. Offering this alternative could reduce congestion on Didcot s roads, especially at key junctions such as Marsh Lane Bridge and the Power Station & Manor Bridge Roundabouts. Active travel is very much a low Carbon transport option. Cycling this route could match the time taken by car to do the same journey and could attract people away from cars. Active travel is socially inclusive. The cost of cycling or walking is very low and available to everybody, regardless of age, disability or income. There would be no adverse effects on the environment with this project. The project would reduce the impact of air pollution due to the large housing growth by reducing the need to drive everywhere. Active travel is a very important tool in improving public health. This project encourages active travel. The project is off-road, practically removing any road safety concerns and runs through green corridors in the Ladygrove, improving the feeling of wellbeing. Page 5 of 6

Does the project address the key issues in the Science Vale Area Action Plan? Issue Ensure new neighbourhoods integrate with existing communities. Help Didcot to reach its potential as centre of Science vale. Support facilities to attract and develop knowledge economy growth. Achieve growth without compromising the character of the area. Ensure timely delivery of infrastructure. Encourage skills in the local workforce to meet the demands of the knowledge economy. Issues Met? No Information about how the issues have or have not been addressed. This project directly links from the centre of Didcot right through into Didcot North East. The use of the route provides a human scale link between the Ladygrove and Didcot North East, encouraging integration. The use of an underpass provides a permanent physical link and would increase the feeling of being part of Didcot. This project would also be an important link for the rest of Didcot to access the new sports centre and any other community facilities on the site. The project improves transport links. Active travel routes do have a beneficial effect on the built environment i.e. when visitors see people walking and cycling it projects a positive view of the town. Traffic queues have the opposite effect. Many high tech start-up companies are looking at areas that provide good cycle infrastructure to locate to, and towns and cities are attracting businesses by offering good cycle infrastructure. This project would enhance the character of Didcot North East and the town by offering the type of infrastructure people are now expecting. This project should be implemented before main works get underway on Didcot North East, so that new residents have an alternative from the start and don t get a car habit. Page 6 of 6