Agenda Osum Production Corp..
The Orion Project - History Osum Production Corp..
Geoscience Jack Pels
Well Data Osum Production Corp.
Orion Observation Well Location Map Note: Only 2 out of 13 Observation wells had acceptable readings. Currently recalibrating or looking at replacements on most of these wells.
Clearwater Reservoir Osum Production Corp.
Clearwater Sand Mineralogy
Cross Section W-E Osum Production Corp.
Cross Section N-S Osum Production Corp..
Clearwater SAGD Reservoir Top Pay as per Commercial Scheme Approval 10103G Osum Production Corp.
Clearwater SAGD Reservoir Base Pay as per Commercial Scheme Approval 10103G Osum Production Corp.
Clearwater SAGD Reservoir Pay Thickness as per Commercial Scheme Approval 10103G Osum Production Corp.
Original Bitumen in Place (OBIP) and Recovery Drainage Area, 50 m boundary (10 2 m 2 ) Average Net Thickness (m) Porosity (frac) Oil Saturation (frac) Total OBIP (10 6 m 2 ) Current Recovery % Estimated Recovery % Pad 103 103 21.0 0.33 0.70 1.46 24% 60% Pad 104 * 300 23.0 0.33 0.67 1.53 12% 50% Pad 105 300 20.0 0.33 0.70 1.39 28% 60% Pad 106 * 300 23.0 0.33 0.67 1.53 12% 50% Pad 107 300 20.0 0.33 0.69 1.37 25% 60% Hilda Lake Pilot 223 20.0 0.33 0.70 1.03 51% 60% Orion Operating Area 1723 21.02 0.33 0.69 8.29 Orion Development Area 9208 18.9 0.33 0.69 40.33 Orion Project Area 10523 18.5 0.33 0.69 45.04
. Reservoir Properties
Clearwater Shale Caprock Thickness Osum Production Corp.
Caprock Depth Structure of Beaverhill Lake based on 3D seismic Seismic traverse
Seismic Data 3D, 2D, Swath2D
Repeat Seismic 2D Swath
Repeat Seismic 2D Swath Osum Production Corp.
Scheme Performance Daniel Nugent
Orion Update 10,000 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 year 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 0
Production, m3/d csor Osum Production Corp. Orion Field Production 5000 4750 4500 Water 4250 Steam 4000 Oil 3750 3500 csor 3250 3000 2750 2500 2250 2000 1750 1500 1250 1000 750 500 250 0 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 10 9 8 7 6 5 4 3 2 1 0
Initial Phase 1 Commercial SAGD
Good Well Placement Pilot, Pad 103, Pad 105 26
Cal Dly Rate (m3/d) CSOR Osum Production Corp. Post Perforation Success 300 275 250 225 200 175 Water Prod. Oil Prod Steam Inj. CSOR 20 18 16 14 12 150 125 100 75 50 25 10 8 6 4 2 0 0 Feb-08 Jul-09 Nov-10 Apr-12 Aug-13 Dec-14
Well Placement Too Low Pads 104 & 106 28
Cal Dly Rate (m3/d) CSOR Osum Production Corp. Well Placement Too Low (Pads 104 & 106) Well 104P3 : good upside 300 275 250 225 200 175 Water Prod. Oil Prod Steam Inj. CSOR 20 18 16 14 12 150 125 100 75 50 25 10 8 6 4 2 0 0 Oct-06 Feb-08 Jul-09 Nov-10 Apr-12 Aug-13 Dec-14
Cal Dly Rate (m3/d) CSOR Osum Production Corp. Well Placement Too Low (Pads 104 & 106) Well 106P2 300 275 250 225 200 175 Water Prod. Oil Prod Steam Inj. CSOR 20 18 16 14 12 150 125 100 75 50 25 10 8 6 4 2 0 0 Oct-06 Feb-08 Jul-09 Nov-10 Apr-12 Aug-13 Dec-14
Clearwater Redrill Osum Production Corp.
Cal Dly Rate (m3/d) CSOR Osum Production Corp. Well Redrill Pads 106 Well 106P4 300 275 250 225 200 175 20 18 16 14 12 150 125 100 75 50 25 10 8 6 4 2 0 0 Oct-06 Feb-08 Jul-09 Nov-10 Apr-12 Aug-13 Dec-14
Pad Recovery & Performance Osum Production Corp.
Typical Injector Completion Osum Production Corp.
Typical Producer Completion PCP Osum Production Corp.
Artificial Lift Orion Wells Osum Production Corp.
Typical Producer Completion Steam Lift Osum Production Corp.
Ground Uplift Monitoring
Orion Production Performance
Orion SAGD Pressure Scheme
Surface Operations Mario Caya
Plant & Facilities Summary
Orion CPF Plot Plan Osum Production Corp.
Orion Block Flow Diagram Osum Production Corp.
Orion Central Processing Facilities (CPF)
Orion Well Pad Facilities
Orion Bitumen Production Treatment
Orion Vapour Recovery System
De-Oiling
Water Treatment
Orion Water Usage and Treatment Osum Production Corp.
Steam Generation
Monthly Steam Production 2014 Osum Production Corp.
Plant & Facilities Summary
Measurement, Accounting & Reporting Plan (MARP)
Orion Well Integrity
Monthly Gas Usage 2014 Osum Production Corp.
Monthly Energy Intensity 2014 Osum Production Corp.
Water Proration Factors 2014 Osum Production Corp.
Oil Proration Factors 2014 Osum Production Corp.
Gas Proration Factors 2014 Osum Production Corp.
Brackish Water Usage 2014 Osum Production Corp.
% / Month m3 / month Water Disposal Limits 25% 16,000 Disposal Limit % Actual Disposal % Disposal Volume Limit 14,000 20% 12,000 15% 10,000 8,000 10% 6,000 4,000 5% 2,000 0% Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 -
On-Site Water Disposal 2014
Fresh Non-Potable Water Usage 2014 23,725
2014 Cumulative Water Balance Utility Only Septic from Utility Service
Compliance Heather Harms
Off-Site Waste Disposal 2014
Domestic Waste Disposal 2014
Air Monitoring Program 2014
Original SO 2 Submitted Values with Re-Calculated Values Prior to Osum Osum Operatorship
Quarterly SO 2 Volumes Osum Production Corp.
NOX (Tonnes/Month) Osum Production Corp. Monthly NOx Emissions Per Boiler
Air Monitoring Program 2014 Passive
Air Monitoring Program 2014 Passive
Monthly Greenhouse Gas Emissions (Tonnes CO 2 E) Compliance Emission Rate 0.6568 CO 2 eq/m 3 Actual 0.4485 CO 2 eq/m 3
Soil Monitoring Program 2014
Groundwater Monitoring Program 2014
Wildlife Monitoring Program 2014
Environmental Monitoring Program 2014
Amendments to Existing Approvals
Compliance
Future Plans Bruce Thornton
Future Plans Field Development for Orion Phase 2
Phase 2 Well Placement / Design
Orion Central Plant Facilities Expansion
Orion Pads & Pipelines Expansion
Brackish Water Wells
Future Plans for Resource Recovery
Thank you