Everyone is a Pedestrian

Similar documents
REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

forwarddallas! Implementation Proposed Chapter 43 Code Amendment On-Street Parking

What Is a Complete Street?

5. RUNNINGWAY GUIDELINES

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Omaha s Complete Streets Policy

New Jersey Department of Transportation. Safety Impact Teams. May 22, 2007 Patricia Ott, P. E. Director, Traffic Engineering & Safety

RSA Efforts in the Tampa Bay Area

FHWA Resources for Pedestrian and Bicycle Professionals

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Active Transportation Facility Glossary

Water Street Promenade Engineering and Design Services

City of Seattle Edward B. Murray, Mayor

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Fleur Drive Reconstruction

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Chapter 5: Crossing the Street

July 25 28, 2017 South Lake Tahoe, CA

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Arlington s Master Transportation Plan

SPEED MANAGEMENT FOR VISION ZERO

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

City of Vestavia Hills Traffic Calming Policy for Residential Streets

Completing the Street: Denning Drive

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

ACTIVE TRANSPORTATION

MASTER BICYCLE AND PEDESTRIAN PLAN

Chapter 5. Complete Streets and Walkable Communities.

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Pedestrian Road Safety Audit

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report

Road Diets: Reconfiguring Streets for Multi-Modal Travel

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

USDOT Pedestrian and Bicycle Safety Assessment Gary, Indiana April 16, 2015

Thank you for attending

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

DRAFT Sellwood Bridge Existing Roadway Deficiencies

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

A Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?

APPENDIX E GRADE CROSSING LOCATIONS

Chapter 3.3 Horizon Elementary School. Volusia County MPO. June 2009

Complete Streets Funding Program Project Prioritization Plan

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

SAFE ROUTES TO SCHOOL

COMPLETE STREETS PLANNER S PORTFOLIO

Living Streets Policy

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Mandan Commission Meeting August 2, 2016 Mandan City Hall

5 CIRCULATION AND STREET DESIGN

Closing Plenary Session

Rail Station Fact Sheet DFW Airport North Station* (*station under construction with anticipated start of service in late 2018)

Chapter 4: Funding and Implementation

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

CURBSIDE ACTIVITY DESIGN

Bay to Bay Boulevard Complete Streets Project

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

SR/CR A1A PEDESTRIAN SAFETY & MOBILITY STUDY RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

DOT Policy and Procedure Integrity Excellence Respect

Introduction Additional Safe Routes to School Resources Main Street Elementary School Survey Results Field Audit...

Kentucky s Surface Transportation System

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Hedgepeth Williams Middle School and Paul Robeson Elementary School Trenton, NJ. School Travel Plan

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

City of Moorhead Committee of the Whole Meeting

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

5. Pedestrian System. Accomplishments Over the Past Five Years

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Rail Station Fact Sheet CentrePort/DFW Airport Station

Retrofitting Urban Arterials into Complete Streets

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Pedestrian & Bicycle Safety Innovations & Applications

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Non-Motorized Transportation 7-1

C C C

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

City of San Diego Vision Zero Draft Strategic Plan FY 2017

Designing for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Duwamish Way-finding and CTR Report

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

42nd Ave N Reconstruction

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

Lesson 2 4-Hour Version Slide: 4H-25

Executive Summary. September 3, 2014

Borough of Danville, PA Traffic Calming Program Guidelines

San Rafael School District. Task Force Meeting Notes. November 5, 2012

Transcription:

Everyone is a Pedestrian Improving Pedestrian Safety in Texas Transportation and Trinity River Project Committee 26 May 2015

Everyone is a Pedestrian Federal Highway Administration [ FHWA ] Programs to Improve Safety for All Roadway Users Mayor s Challenge for Safer People, Safer Streets Pedestrian Safety Focus States and Cities Road Diets Road Safety Assessment [ RSA ] 2

Road Safety Audit Vickery Meadow Neighborhood Pilot Project (24-26 February 2015) FHWA led a study and will report potential road safety issues, and identify opportunities for improvement for all road users. 3

Project Location and Crashes 4

Responsibilities 1 Identify project 5 Conduct analysis and prepare report 6 Present findings to Owner 7 Prepare formal response 2 Select Road Safety Assessment Team 3 Conduct start-up meeting 4 Perform field reviews 8 Incorporate findings 5

The RSA Team City of Dallas Dallas County Dallas Police Department North Central Council of Governments [ NCTCOG ] Vickery Meadow Public Improvement District FHWA Independent Experienced Multi-disciplinary Multi-jurisdictional 6

Positives Pavement markings Existing sidewalks Push buttons and pedestrian signals Turning islands School Crossing Guards Street lighting Medians 7

Positives Proactive group, multiple agency support Readily available access to transit service Pedestrian activity Reduced criminal activity Children walking to school Planned Southern Pacific [ SOPAC ] Trail 8

Concerns Inadequate pedestrian facilities Insufficient traffic and pedestrian counts Under reporting of incidences Language barriers Prioritization of transportation modes Location of schools 9

Safety Concerns Intersections Pedestrian signals and buttons Signal timing Americans with Disabilities Act [ ADA ] Accessibility Sidewalks Connectivity Condition Width Obstructions 10

Safety Concerns Less than desirable use of pedestrian facilities Risky pedestrian actions Multimodal interaction Roadway width Median width Turning movements Multiple Threat Pedestrian lighting 11

Safety Concerns Intersection geometry Roadway design encourages higher speeds Need for education, positive examples, encouragement and enforcement Truck traffic (transfer station) 12

Complete Streets Street Design Standards that Include all modes of transportation (including vehicles, transit, pedestrians, bicycles) City of Dallas Complete Streets Initiative Vickery Meadow Station Area Plan recommends a Complete Street approach for Park Lane Complete Streets should also be considered for Shady Brook Lane, Fair Oaks Avenue and Greenville Avenue Could improve safety for all users in the neighborhood 13

After Before 14

DART Park Lane Station Crossing locations Multiple pedestrian exits from parking lot Remove stone steps Add fencing along Greenville Avenue Pedestrian direction through parking lot (signage/striping) and proper crossing points Support the addition of pedestrian bridge to platform Downtown Carrollton Station 15

Greenville Avenue and Park Lane Pedestrian signal timing Pedestrian signals and push buttons Intersection geometry Number of through and turning lanes Higher speed turns Narrow to no medians Long pedestrian crossing distances Pedestrian lighting Trees and birds 16

Greenville Avenue and Park Lane Re-evaluate under-utilized turn lanes Southbound Greenville Avenue right turn lane Inside southbound Greenville Avenue left turn lane Northbound Greenville avenue right turn lane Pedestrian crossings Tighter radius to decrease speeds Widen medians Decrease distance/exposure 17

Park Lane and Shady Brook Lane Pedestrian signal timing and operation ADA accessibility Lighting Evaluate potential for Complete Streets 18

Shady Brook Lane and Melody Lane Pedestrian push button and signal location Lighting Evaluate potential for Complete Streets 19

Five Points Evaluate: Extending school zones along Park Lane and Ridgecrest Road Adding advance lane use signage, especially on Park Lane Making Ridgecrest Road One-Way Complete Streets for Fair Oaks Avenue and Park Lane Vehicle Design traffic signal control 20

Five Points Crossing distances Pedestrian signals and push buttons Unclear striping, signals and signage Signal timing 21

Schools 22

Schools Develop a Safe Routes to School Plan During school dismissal De-emphasize the use of the doors adjacent to Fair Oaks Avenue Limit left-turns from Ridgecrest Road to Fair Oaks Avenue Possible street/lane closures Traffic signals programmed to flash red to allow for an all-pedestrian phase Widen sidewalks/crosswalks More frequent safety education for students and parents 23

Leadership 24