Project Application. Project Location: Salem Drive (Federal Route 1101)

Similar documents
Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Long Island Rail Road Expansion Project Floral Park to Hicksville

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Giles Run Connector Road

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

3.0 PROJECT DESCRIPTION

C C C

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

10.0 CURB EXTENSIONS GUIDELINE

ACTIVE TRANSPORTATION

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Bay to Bay Boulevard Complete Streets Project

Washington St. Corridor Study

Military Road Safety Improvements

East 12 th Street Bikeway Feasibility Study

St. Francis Drive through the City of Santa Fe Corridor Study

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

2.0 LANE WIDTHS GUIDELINE

Bicycle Master Plan Goals, Strategies, and Policies

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Driveway Design Criteria

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

City of Memphis On-Street Parking Modification Guidelines

Non-Motorized Transportation 7-1

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Mission Bay Loop (MBL) Public Meeting

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

INDOT Complete Streets Guideline & Policy

General References Definitions. (1) Design Guidance. (2) Supporting Information

Polk Streetscape Project

WELCOME Public Information Centre

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Mandan Commission Meeting August 2, 2016 Mandan City Hall

5 CIRCULATION AND STREET DESIGN

COMMUNITY MEETING AGENDA

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

Implementing the Three Es of School Zone Traffic Calming

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

City of Vallejo Traffic Calming Toolbox

CITY OF LOMITA CITY COUNCIL REPORT

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Committed to Service. Development Services. February 21, ACHD Commission. Mindy Wallace, AICP

Downey Road. Transportation Improvement Study

Public Meeting #1 Comment Summary

5. RUNNINGWAY GUIDELINES

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Item No. 14 Town of Atherton

National Network Safety Analysis (6/4/2015 Revision) FRA and FRA PID 86661

MASTER BICYCLE AND PEDESTRIAN PLAN

This page intentionally left blank.

TRAFFIC IMPACT ANALYSIS

CITY OF SPOKANE VALLEY Request for Council Action

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Omaha s Complete Streets Policy

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

San Jose Transportation Policy

State Street and Pierce Park Lane Intersection Concept Report

Multi-Modal Traffic Analysis. Parisi and Associates

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Borough of Danville, PA Traffic Calming Program Guidelines

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Section 7 Complete Green Street Guidelines DRAFT

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

This chapter describes the proposed circulation system and transportation alternatives associated with

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River

Overview. Updated pictures of the intersection are shown in Exhibits 1 thru 4, and the aerial photo provided by Google Maps is shown in Exhibit 5.

Cycle Track Design Best Practices Cycle Track Sections

This page intentionally left blank.

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

FEASIBILITY STUDY MACARTHUR BOULEVARD

Transcription:

Project Application General Information Municipality/Lead Agency: Hoffman Estates 1. Contact Person: Michael Hankey 2. Contact Phone: 847 252-5801 3. Contact Email: mike.hankey@hoffmanestates.org Project Location: Salem Drive (Federal Route 1101) Project Limits: 1. First Reference Point/Street: Bode Road (Federal Route 1318) 2. Second Reference Point/Street: Hoffman Estates municipal limits Schaumburg Road (Federal Route 1322) is the next federally designated route to the south of the project limits. Existing and Proposed Condition Describe the existing condition: Salem Drive is a two lane collector street which runs north and south. The adjacent land uses immediately to the east and west consist of apartment complexes, a neighborhood shopping center and a junior high school are situated to the north, and single family homes are located to the south. Salem Drive has one 18 foot travel lane in each direction (to face of curb) with a dimension of 37 feet between backs of curbs. A northbound left turn lane is provided at the Bode Road intersection. The right of way width is 60 feet and the roadway is offset to the east within this space. Sidewalk is located on the west side of Salem Drive within the project limits. There is no sidewalk on the east side due to the right of way width, offset position of the roadway, narrow parkway, proximity of the adjacent parking lot for an apartment development and the grade of the parkway. Parking is prohibited on both sides of the street and the speed limit is 25 mph. There is a substandard 3 foot striped bike lane for both directions on Salem Drive which matches the existing conditions to the south in Schaumburg. The ADT on Salem Drive is about 7,000 vehicles per day in this section. The section of Salem Drive in Hoffman Estates was reconstructed in 2000 and the street condition indicates a need for resurfacing. Salem Drive continues north through the Bode Road intersection into Schaumburg, crossing Golf (Federal Route 559) and Higgins (Federal Route 341) Roads. North of Higgins Road, the street name changes to Jones Road, which is located in Hoffman Estates, and connects on the north end to the Hassell / Hillcrest corridor (Routes 1100 and 1102). To the south of the project limits, Salem Drive continues through Schaumburg crossing Schaumburg Road (Federal Route 1322), Wise Road (Federal Route 1338), and the Elgin O Hare expressway, before ending at Irving Park Road (Federal Route 1321) Describe the proposed improvements: The proposed improvements generally consist of grinding the existing pavement and resurfacing with new asphalt. Curb and gutter repairs along with sidewalk modifications to meet ADA requirements are included as well as bicycle facility improvements. Work types (see guide for specific work types): H-RS, H-C/G, E-BIKE Regional Transportation Significance Roadway Designation: Collector

Source: IDOT Getting Around Illinois webpage, map for Roadway Functional Class Roadway #2 (if intersection project) : Choose an item. Safety (If project does not address safety, leave this section blank) Vehicular Crashes for each of the last three years available: 1. Year: 2013 Vehicular Crashes: 4 2. Year: 2014 Vehicular Crashes: 4 3. Year: 2015 Vehicular Crashes: 0 All the reported crashes within the project limits for the analysis period were associated with the Bode Road / Salem Drive intersection. Four were rear end crashes, two were angle collisions, with one pedalcyclist and one parked vehicle crash. According to crash information, the pedalcyclist crash incident involved a right turn movement and listed failure to yield and limited driving skills as contributing factors. Will this project address bicycle and/or pedestrian safety: Yes A standard width bicycle lane will be installed on Salem Drive within the project limits to connect to existing and planned bicycle lanes in contiguous sections. In a short section of Salem Drive closest to Bode Road a combination of a shared lane for northbound traffic and an off-street path for southbound bicyclists will be used. Please list all the type K (fatality) and A (incapacitating) accidents from the previous five years: There was one reported A injury crash in 2012 within the project limits. This was a collision in a parking lot with a parked vehicle. Describe how the project will address safety and crash/accident history: The primary crash pattern consists of northbound rear-end collisions on Salem Drive at Bode Road reported during 2013 and 2014. The intersection of Bode Road and Salem Drive was reconstructed in 2015 as part of a larger project along Bode Road. That project established left turn lanes on the north, west, and east approaches (along with bicycle lanes) to match the lane configuration on Salem Drive on the south leg of the intersection. On-street bicycle lanes, 5 feet wide, will be installed within the subject project limits where space allows. This will match the existing bike lanes on Salem Drive north of Bode Road. The Village of Schaumburg has plans to reconstruct Salem Drive to the south from the project limits with on-street accommodations for bicycles. Scope of Project Please enter the scope of work for the project: The work will consist of grinding the existing pavement surface, spot curb and gutter repair, pavement patching, sidewalk repairs to comply with ADA requirements, asphalt resurfacing, on-street bicycle lanes, bicycle distance / destination signs, pavement striping, and traffic control signs. A short section on shared lane on-street for northbound traffic approaching Bode Road and an off-street path for southbound bicyclists will be installed. Complete Streets/Multimodal Describe any transit or transit access improvements: Pace Route 602 travels on this portion of Salem Drive connecting to the Schaumburg Metra station. The ADA modifications will broaden accessibility for the route while the bike lanes provide access along Salem Drive.

Describe any pedestrian improvements: Modifications to bring ramps and cross slopes into compliance with ADA will be implemented. Describe any bicycle improvements: On-street bicycle lanes will be installed within the project limits with the exception of the section of Salem Drive from the Bode Road intersection to approximately 200 feet south. In this segment, the pavement width is designated for a through lane in each direction and a northbound left turn lane. The pavement will be striped for a 14 foot northbound shared lane, an 11 foot left turn lane, and an 11 foot southbound through lane. The existing sidewalk on the west side will be widened to at least 7 feet for a southbound one-way shared use path to facilitate bicycle travel within the limits of the left turn lane on Salem Drive. At the beginning of the striped taper for the northbound left turn lane, adequate space is available for 5 foot striped bicycle lanes and a 12 foot travel lane in each direction. The bicycle lanes will connect with the bicycle lanes installed with the Bode Road reconstruction project and those installed on Salem Drive to the north and south. The 5 foot on-street bicycle lanes will replace a substandard 3 foot striped area intended for bikes within this section. The on-street lanes are shown in the Village Comprehensive Bicycle Plan and are consistent with the Village Complete Streets practice. Are the transit, pedestrian and/or bicycle improvements included within a local, regional or state plan? As noted above these changes are consistent with Complete Streets policies incorporated into the Village Municipal Code. The bike designations are included in the Village Comprehensive Bicycle Plan. Is the proposed route a local or regional truck route? No If yes, please list plans and include reference (Exhibit F): Congestion Mitigation (If project does not address congestion mitigation, leave this section blank) Does the project improve the level of service (LOS)? Choose an item. 1. Pre-implementation LOS: Choose an item. 2. Post-implementation LOS: Choose an item. Please attach LOS analysis as evidence of improvement (Exhibit E). Intergovernmental Importance Please list the financially contributing project sponsors and partner agencies: Hoffman Estates Project Readiness Please choose the appropriate project status: Phase I Design Approval from IDOT If Phase I Engineering has not been initiated with IDOT, please describe any planning or engineering work that the project sponsor has undertaken: Click here to

Project Cost Estimate Phase I Engineering (only for CMAQ/TAP projects) Phase II Engineering Right-Of-Way Acquisition Construction (includes Phase III Engineering) Federal Local Total STP Other (CMAQ, ITEP, etc) Municipal State County Click here to Click here to enter $5,000 Click here to Click here to $5,000 text. Click here to Click here to Click here to enter text. Click here to enter text. $160,000 Click here to enter text. $15,000 Click here to Click here to Click here to $40,000 Click here to Click here to Click here to Click here to $15,000 Click here to enter text. $200,000

Project Schedule (Fill in dates for applicable activities) Activity Estimated Date Initial Phase I Engineering Kick-off Meeting: 9/27/2016 Submit draft Phase I Engineering Report (PDR) to IDOT: 9/27/2016 (3-6 month review period) Submit Final PDR: 9/27/2016 Submit Draft Local Agency Agreement (BLR 5310) for Phase II Engineering: Click here to enter a date. Phase I Engineering Design Approval: 10/10/2016 Execute Local Agency Agreement (BLR 5310) for Phase II Engineering: Click here to enter a date. Submit of Pre-Final Plans w/ Estimates to IDOT: 12/1/2017 (1-4 month review period) Submit Draft Local Agency Agreement (BLR 5310) for Construction and Phase III Engineering Agreement: 1/26/2018 Execute Local Agency Agreement (BLR 5310) for Construction and Phase III Engineering Agreement: 3/16/2018 Submit Final Plans, Spec. & Estimates (PS&E): 1/26/2018 Right-of-Way Certification: Click here to enter a date. Target Letting: 4/26/2019

Exhibits Please submit the required exhibits with this application: A. Map showing location of project within the region B. Map showing location of project within municipality C. Existing typical section D. Proposed typical section E. Evidence of level of service (LOS) improvement, if applicable F. Local, regional or state plans that include project (you can include reference or expert from plans) Hoffman Estates Comprehensive Bicycle Plan

Regional Map Village of Hoffman Estates STP Project Application Salem Drive Route 1101 Proposed Resurfacing Project Project Limits Bode Road To Hoffman Estates Village limits September 2015

± Salem Dr Resurfacing Location Map (FAU 1101) BODE RD Salem Dr Resurfacing Project Limits: Village Corporate Limits to Bode Rd W BODE CIR PARKER DR 1 inch = 750 feet Transportation and Engineering Division Village of Hoffman Estates

EXISTING - SALEM DRIVE PROPOSED - SALEM DRIVE

0!"#$ % &%' ()*$*+,%-*./ 3+*',-.'% '3''8%'' 3+*',-' %'%* ' ' '3. %' ' '' %. ' %'%'%%''3.'' ' '' ' G' ' % %% '%'.%''''% B2E2'C.%''3.'''8'' <91.7=12345556 789:;<>?89@AB;C D E98>F G C9H>F <9EE;<>A9E I;>J;;E, *' ' *'% 4& %'8,&8 '9&%%'', '984&;%' );%&%, *' #%% ' % '8#=%48'# 7=% 3=1Y45556 OA<P<Q; 89H>;C 9E ZDH8;;E [8A@; >9 <9EE;<> >F; ;\AC'' % $' ' % $ 3 % %' )# $*' '' 3 # $4%(''%' %'%'. ]dph qd^p rcd sh _hodatc_gochpu '*'#( ]^ `abcda efg^_hi jdda k^lh m_dnhoc 897=1K4555 LM 12N45556 OA<P<Q; QDE;C DEB 89H>;C R?9CCAIQP CFD889JCS 9E O9B*' '#( )#%% 3. %' %' 83T JFA<F J9HQB >9>DQ UVWTXXX 98 %' ' 3 ) &!# %'('%' 3%'' *' ' **'' v^ach_sg_w m^_lt vdaahocd_ 6