"Emul Asph (SS-1HP) Tack".

Similar documents
Edge Wedge 150 lb/ft 3

General Notes. Project No /15/2018 Page 1 of 1

Page 1 of KA

The first lift, mainline, shall be placed using a spray paver.

Page 1 of KA

General Notes. Project No /15/2018 Page 1 of 1

FOR LOOP RAMPS-TAPERED DECELERATION LANE

FREEWAY AND SERVICE ROAD CONNECTIONS

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

FREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

General References Definitions. (1) Design Guidance. (2) Supporting Information

TURN ARROW. LANE-REDUCTION ARROW (RIGHT) (For Left Lane, Use Mirror Image) LANE-REDUCTION ARROW MARKING DETAIL

SECTION 12 ROAD MARKINGS AND DELINEATION

RE: 2007 NPA Text (Clean Version)

PERMANENT PAVEMENT MARKING PLAN

SECTION 12 ROAD MARKINGS AND DELINEATION

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

PERMANENT PAVEMENT MARKING PLAN

TRAFFIC LINE MANUAL Edition Revision 1 June 2012 TRAFFIC-ROADWAY SECTION

TRAFFIC LINE MANUAL. June 2011 TRAFFIC-ROADWAY SECTION

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

CHAPTER 1 STANDARD PRACTICES

Sign Design Manual (TEM 295-2)

PERMANENT PAVEMENT MARKING PLAN

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

PERMANENT PAVEMENT MARKING PLAN

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

Sign Designs and Markings Manual (TEM 295-2) Page 8-3

Driveway Design Criteria

Tack Coat Effect on Field Performance. February 3rd, 2015 NCAUPG/ICT Joint Meeting

BI-DIRECTIONALS FREE-ACCESS

Attachment No. 13. National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

Background on the Revisions to VDOT s Access Management Spacing Standards

Minnesota Manual on Uniform Traffic Control Devices

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park


PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

PENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)

PENNDOT HPMS DATA COLLECTION GUIDE

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

KDOT Access Management Policy (AMP)

2009 Manual on Uniform Traffic Control Devices

Geometric Design Tables

Access Management Standards

Tract or Parcel Project Name PCN Checked By Date

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Roadway Design Manual

Pavement Markings (1 of 3)

ROADSIDE DELINEATION AND SAFETY SYSTEMS

INTERSECTION WITH RIGHT TURN TAPER

CW20-1D 48" X 48" (Flags- See note 1) G " X 24" (See note 2)

Identify the letter of the choice that best completes the statement or answers the question.

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices

INDEX. Geometric Design Guide for Canadian Roads INDEX

MNDOT PAVEMENT DESIGN MANUAL

ASPHALT PAVING LEVEL 1

September 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15.

ATTACHMENT NO. 18 GMI-C. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

TRAFFIC AND SAFETY NOTE 608A. Spacing for Commercial Drives and Streets. To Promote a Uniform Practice in Determining Access Spacing

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS. Responsible Driving (Red book) NOTES & STUDY GUIDE

Attachment No. 17 GMI No. 1. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

Access Management in the Vicinity of Intersections

Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006

Benefits of Center Line Rumble Strips on Rural 2-Lane Highways in Louisiana

Access requests to County streets and roadways are processed through one of the following methods:

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

LOCATION AND DESIGN DIVISION

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

(PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS.

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

PUBLIC WORKS DEPARTMENT SIGN AND MARKING PROCEDURES AND GUIDELINES

APPENDIX L: COST ESTIMATING TOOLS

Pavement Markings: Past, Present, and Future. TxDOT Short Course October 2016

CHAPTER 6H. TYPICAL APPLICATIONS

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

Module 5: Navigating Roadways

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

Grade Separated Intersection

guide signs or groups of signs. General provisions are given in Sections 2A.07, 2A.08, and 2A.10. Standard:

Challenges of Tack Coat

Vermont Permit Test Flash Cards

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer

Toole Design Group is live tweeting this webinar

Chapter 33. Grade Separated Intersection Overview Classification of Intersection Grade Separated Intersection

APPENDIX D COST SUMMARY TABLES

Access Location, Spacing, Turn Lanes, and Medians

Transcription:

Page 1 of 25

Application of Emulsified Asphalt, (fog seal 2-lane section). Using a distributor, uniformly apply fog seal to the rumble strip with two passes of the distributor, one in each direction of traffic. Apply the fog seal at a rate of 0.05 gal/sy of diluted emulsion on each pass (2 total) for a total shot rate of 0.10 gal/sy. The original emulsion will be diluted 50:50 with water in the field. This rate may be adjusted in the field to comply with field conditions. Do not apply fog seal more than 6 inches beyond the outside edges of the rumble strip. This work has been included in and will be paid for by line item "Emulsified Asphalt (SS-1HP) Tack. "Emul Asph (SS-1HP) Tack". Page 2 of 25

CM-L-2 @ 0.0082 CuYd/SqYd 0.42 Millings Computed @ 145 lbs/ft 3 Page 3 of 25

CM-L-2 @ 0.0082 CuYd/SqYd 0.42 Millings Computed @ 145 lbs/ft 3 Page 4 of 25

Page 5 of 25

Page 6 of 25

Page 7 of 25

Page 8 of 25 15025

9536 1064 10,600 Page 9 of 25

Page 10 of 25

Page 11 of 25

Page 12 of 25

Page 13 of 25

Page 14 of 25

Page 15 of 25

Page 16 of 25

Page 17 of 25

Page 18 of 25

2 6" DOTTED WHITE 12" SOLID WHITE CHEVRON LINE FULL LENGTH OF DECELERATION LANE EXTENSION LINE 6" SOLID YELLOW EDGE LINE 40 6" SOLID WHITE EDGE LINE 8" SOLID WHITE GORE MARKINGS 30 6" SOLID YELLOW EDGE LINE 12" SOLID WHITE DIAGONAL LINE 6" BROKEN WHITE LANE LINE TYPICAL DECELERATION EXIT RAMP 12" SOLID WHITE CHEVRON LINE 6" SOLID YELLOW EDGE LINE 12" SOLID WHITE DIAGONAL LINE 40 8" SOLID WHITE GORE MARKINGS 6" DOTTED WHITE EXTENSION LINE 6" SOLID WHITE EDGE LINE 30 6" BROKEN WHITE LANE LINES 6" SOLID YELLOW EDGE LINE TYPICAL TAPERED EXIT RAMP 6" SOLID YELLOW EDGE LINE 6" BROKEN WHITE LANE LINES 6" DOTTED WHITE EXTENSION LINE 6" SOLID YELLOW EDGE LINE 8" SOLID WHITE GORE MARKING FULL LENGTH OF ACCELERATION LANE 6" SOLID WHITE EDGE LINE TYPICAL ACCELERATION RAMP 5/25/12 Dotted Extension Lines and Lane Drop Lines B.A.H. B.D.G. 1 7/26/05 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D Page 19 of 25 Pg 1 of 2 KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL PAVEMENT MARKING DETAILS FOR MULTI-LANE DIVIDED ROADWAYS TE307 FHWA APPROVAL 5/25/2012 APP D Brian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.

2 SHOULDER LINE EDGE OF PAVEMENT 6" SOLID WHITE EDGE LINE 12 12 12 EDGE OF PAVEMENT 6" BROKEN WHITE LANE LINE C L 6" SOLID YELLOW EDGE LINE EDGE OF PAVEMENT 12 12 6" SOLID WHITE EDGE LINE EDGE OF PAVEMENT SHOULDER LINE TYPICAL LANE LINE AND EDGE LINE MARKINGS FOR FOUR LANE AND SIX LANE DIVIDED HIGHWAYS 6" SOLID YELLOW EDGE LINE 12" SOLID WHITE DIAGONAL LINE 8" SOLID WHITE GORE MARKINGS 12" SOLID WHITE CHEVRON LINE 300 8" SOLID WHITE LINE 1 2 MILE 8" LANE DROP MARKING 6" SOLID WHITE EDGE LINE 30 6" SOLID YELLOW EDGE LINE 8" LANE DROP MARKING 6" BROKEN WHITE LANE LINES TYPICAL LANE DROP 8 24 4 9 2 2 3 3 32 TYPICAL SPACING FOR DOTTED EXTENSION LINES, UNLESS OTHERWISE NOTED ON PLANS. TYPICAL SPACING FOR BROKEN LINES UNLESS OTHERWISE NOTED ON PLANS. TYPICAL SPACING FOR LANE DROP. UNLESS OTHERWISE NOTED ON PLANS. NOTE: LONGITUDINAL PAVEMENT MARKING LINES SHALL BE OFFSET A MINIMUM OF 2" FROM LONGITUDINAL PAVEMENT JOINTS. NOTE: AT RAMP TERMINALS WITH CROSS-ROADS, WRAP 6" EDGE LINES AROUND RADII. NOTE: ON NON I, US, AND K ROUTES, 4" EDGE LINES MAY BE INSTALLED. 6" EDGE LINES ARE NOT REQUIRED ON NON I, US, AND K ROUTES. Page 20 of 25 Pg 2 of 2 5/25/12 Dotted Extension Lines and Lane Drop Lines B.A.H. B.D.G. 1 7/26/05 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL PAVEMENT MARKING DETAILS FOR MULTI-LANE DIVIDED ROADWAYS TE307 FHWA APPROVAL 5/25/2012 APP D Brian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.

3 300 300 6" SOLID WHITE EDGELINE 4" SOLID YELLOW LINE 6" DOTTED WHITE EXTENSION LINE 6" SOLID WHITE EDGELINE D/4 6" BROKEN WHITE LANE LINE 6" WHITE LANE DROP LINE NOTE: DOTTED EXTENSION LINE TAPER LENGTH POSTED SPEED * 12 FOR POSTED SPEEDS ABOVE 40 MPH W 4-2 D TYPICAL MARKING FOR AUXILIARY PASSING LANE 6" BROKEN WHITE LANE LINE 4" SOLID YELLOW LINE SHOULDER LINE 4 2 2 EDGE OF PAVEMENT 6" SOLID WHITE EDGE LINE TYPICAL SPACING FOR DOTTED EXTENSION LINES, UNLESS OTHERWISE NOTED ON PLANS. 9 3 3 6" SOLID WHITE EDGE LINE EDGE OF PAVEMENT SHOULDER LINE 6" BROKEN WHITE LANE LINE 4" BROKEN YELLOW LINE TWO-WAY LEFT TURN DETAIL FOR FIVE LANE ROADWAY TYPICAL SPACING FOR LANE DROP. UNLESS OTHERWISE NOTED ON PLANS. 8 24 4" SOLID YELLOW LINE SHOULDER LINE EDGE OF PAVEMENT 32 6" SOLID WHITE EDGE LINE 6" SOLID WHITE EDGE LINE EDGE OF PAVEMENT TYPICAL SPACING FOR BROKEN LINES UNLESS OTHERWISE NOTED ON PLANS SHOULDER LINE 4" BROKEN YELLOW LINE TWO-WAY LEFT TURN DETAIL FOR THREE LANE ROADWAY 4" 4" 16 SPACING (FT) 10 X SPEED (MPH) TWO-WAY LEFT TURN ARROW SPACING DETAIL 4" TYPICAL SPACING FOR NO PASSING LINES UNLESS OTHERWISE NOTED ON PLANS NOTE: IF ARROWS ARE USED SPACE THE ARROWS AS SHOWN IN THE SPACING DETAIL. Pg 1 of 2 5/25/12 Added Dotted Extension and Lane Drop Lines B.A.H. B.D.G. 2 9/20/05 Removed Aux. Passing Lane Dotted Ext. Line J.F.F. B.D.G. 1 7/26/05 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL PAVEMENT MARKING DETAILS FOR UNDIVIDED ROADWAYS Page 21 of 25 TE308 FHWA APPROVAL DESIGNED J.F.F. DETAILED 5/25/2012 APP D Brian D. Gower J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.

3 NOTE: ALL PAVEMENT MARKINGS SHALL BE BROKEN AT CROSS ROADS. FOR HIGHWAY JUNCTIONS THE NO PASSING ZONE WILL EXTEND 1000 FROM INTERSECTION. 4" BROKEN YELLOW LINE 6" SOLID WHITE LANE LINE 4" SOLID YELLOW LINE 6" WHITE EDGE LINE 6" WHITE EDGE LINE 500 500 6" WHITE EDGE LINE 6" SOLID WHITE LANE LINE 4" SOLID YELLOW LINE 4" BROKEN YELLOW LINE 6" WHITE EDGE LINE TYPICAL ROAD JUNCTION MARKINGS WITH BYPASS LANES EDGE OF PAVEMENT 6" BROKEN WHITE LANE LINE SHOULDER LINE 6" SOLID WHITE EDGE LINE 12 4" SOLID YELLOW DOUBLE LINE 12 12 12 6" SOLID WHITE EDGE LINE EDGE OF PAVEMENT SHOULDER LINE 6" BROKEN WHITE LANE LINE TYPICAL MARKINGS FOR FOUR LANE ROADWAY 6" SOLID WHITE EDGE LINE W14-3 EDGE OF PAVEMENT 4" BROKEN YELLOW LINE 12 12 4" SOLID YELLOW NO PASSING LINE EDGE OF PAVEMENT SHOULDER LINE 6" SOLID WHITE EDGE LINE TYPICAL TWO LANE MARKINGS NOTE: LONGITUDINAL PAVEMENT MARKING LINES SHALL BE OFFSET A MINIMUM OF 2" FROM LONGITUDINAL PAVEMENT JOINTS. Pg 2 of 2 NOTE: ON NON I, US, AND K ROUTES, 4" EDGE LINES MAY BE INSTALLED. 6" EDGE LINES ARE NOT REQUIRED ON NON I, US, AND K ROUTES. 5/25/12 Added Dotted Extension and Lane Drop Lines B.A.H. B.D.G. 2 9/20/05 Removed Aux. Passing Lane Dotted Ext. Line J.F.F. B.D.G. 1 7/26/05 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL PAVEMENT MARKING DETAILS FOR UNDIVIDED ROADWAYS Page 22 of 25 TE308 FHWA APPROVAL DESIGNED J.F.F. DETAILED 5/25/2012 APP D Brian D. Gower J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.

Ú City limit or Urban boundary No Centerline rumble strips Centerline rumble strips City connecting link or Urbanized (Unincorporated city) TYPICAL CITY CONNECTING LINK OR URBANIZED AREA Centerline rumble strips ì Major HighwayÜ ì Major HighwayÜ Ú Minor Highway or County Road Ú City limit or Urban boundary GENERAL NOTES Construction of centerline rumble strips in asphalt pavement is paid under the bid item "Rumble Strips (Milled) (Centerline)". All work and materials required to construct the strips in accordance to these details and Special Provisions are included in this item. See typical sections for other surfacing details. Do not construct rumble strip on bridges or concrete bridge approaches. No variation in spacing between depressions will be permitted. Either rumble strip shape is acceptable with no mixing of shapes on a project unless approved by the engineer. For Shoulder Rumble Strip details see Standard drawing RD707. ì Major HighwayÜ ì Major HighwayÜ TYPICAL RURAL INTERSECTION WITH BYPASS LANES No Centerline rumble strips Centerline rumble strips ì Major HighwayÜ ì Major HighwayÜ TYPICAL RURAL INTERSECTION WITH LEFT TURN LANES Centerline rumble strips Page 23 of 25 KDOT Graphics Certified Ú Minor Highway or County Road Centerline rumble strips No Centerline rumble strips Centerline rumble strips 1 OF 2 2 1 1-15-10 Revised notes S.W.K. J.O.B. 1 9-24-09 Rem ì rumble strips thru sdrd. S.W.K. J.O.B. NO. DATE REVISIONS BY APP'D RD706 KANSAS DEPARTMENT OF TRANSPORTATION MILLED RUMBLE STRIPS FHWA APPROVAL 5-26-1 1 (CENTERLINE) DESIGNED DETAILED QUANTITIES DESIGN CK. DETAIL CK. QUAN.CK. KDOT Graphics Certified 07-09-2015 APP'D. James O. Brewer TRACED Bowser TRACE CK. King

Page 24 of 25 KDOT Graphics Certified ShoulderÜ ì ProjectÜ TYPICAL MINOR SIDEROAD OR ENTRANCE Centerline Rumble Strips Edge of travel wayü Traffic ÙCenterline Rumble Strips of Undivided Highway Traffic Edge of travel wayû TYPICAL INSTALLATION 12" 7" 5" PLAN DETAILS OF DEPRESSION 12" 7" 5" 2 1 1-15-10 Revised notes S.W.K. J.O.B. 1 9-24-09 Rem ì rumble strips thru sdrd. S.W.K. J.O.B. NO. RD706 DATE REVISIONS BY APP'D KANSAS DEPARTMENT OF TRANSPORTATION MILLED RUMBLE STRIPS FHWA APPROVAL 5-26-1 1 (CENTERLINE) DESIGNED DETAILED QUANTITIES DESIGN CK. DETAIL CK. QUAN.CK. APP'D. James O. Brewer TRACED Bowser TRACE CK. King KDOT Graphics Certified 07-09-2015 12" ELEVATION B A A B B A A PLAN B DETAILS OF DEPRESSION (Alternate Shape) "to " depth 12" 12" SECTION B-B (ALT. SHAPE) 2 OF 2 "to " depth "to " depth 12"Radius 12"Radius "to " depth SECTION A-A (Typical for both shapes) ÚTop of pavement ÚTop of pavement SECTION B-B 7" ALT. RUMBLE STRIP SHAPE End of Rad. Úì Sideroad or Paved Entrance End of Rad.

Page 25 of 25 758