Columbia College Fire Sprinkler and Fire Suppression Systems 5-Year, Annual, Semi-Annual, Quarterly Inspection, Maintenance, and Testing Certification

Similar documents
Backflow Devices Branch Make Model Size Serial Location

Corrosion Protection in Dry-Pipe Systems Article and photos by Gregory Havel, except where noted. May 21, 2018

REQUEST FOR QUOTATION 3-10-B037 METROPOLITAN WASHINGTON AIRPORT AUTHORITY SPRINKLER SYSTEM TESTING AND INSPECTION. July 22, 2010

TECHNICAL DATA. Dry 132a. October 1, 2008

III. Identify the initial installation requirements for standpipe systems

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

DESIGN DATA. Dry 105a. September 5, 2008

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S

ASBESTOS INVENTORY CONTROL

Florida Building Code Review Checklist

TECHNICAL DATA. than the water inlet pressure to the concentrate

Piped Air SCBA Refilling System Standard

TECHNICAL DATA. Q= Cv S

E X T E R I O R L I V E P R O P A N E F I R E P R O P P R O C E D U R E S F O R U S I N G T H E P R O P A N E P R O P

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

Wet pipe low flow foam/water system

PRESSURE EQUIPMENT: REGULATIONS AND INSPECTIONS CODE NSH 222 Date: July 2003 Revision: 00 Page: 1 of 7

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

FIRE FIGHTER II - SKILLS PERFORMANCE SHEET

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA Q= C. Table 1 - Specifications

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

TECHNICAL DATA. Q = C v P S

Winter Shut Down Procedure

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

TECHNICAL DATA. Table 1 - Specifications

Type 1 - Nitrogen Generation System. Designed for: Dry or Pre-Action Fire Protection Systems (FPS) with a total capacity up to 750 gallons

TECHNICAL DATA. Trimpac 257a. September 16, 2013

29 SERIES - SAFETY VALVE

OBSOLETE. Wet pipe low flow manifold system

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN

TECHNICAL DATA. Trimpac 256a. October 31, 2013

Type 3 - PSA Nitrogen Generation System

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

TECHNICAL DATA OBSOLETE

Pool Guide. Life Safety Inspections

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

MONTGOMERY COUNTY PUBLIC SCHOOLS DRINKING WATER TESTING 2018

FIRE FIGHTER II SKILL PERFORMANCE CHECK SHEETS NFPA FIRE FIGHTER II SKILL STATION MENU

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

Horizontal Bladder Tanks

Vertical Bladder Tanks

TECHNICAL DATA OBSOLETE

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

Advanced Code Requirements for Residential Construction Internet Course

TECHNICAL DATA. Trimpac 244a. September 16, 2013

TECHNICAL DATA. Q = C v P S

Wall Bracing Examples: Building #1 One-Story

SERIES SAFETY VALVE

OBSOLETE DESIGN DATA. Foam 301a. February 9, 1998

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

Bladder Tank Installation & System Design Information

Quick Specs. INERGEN Clean Agent Fire Suppression System

Linden Lions are Respectful, Responsible, Safe, and Ready! Location Respectful Responsible Safe Ready

Model MTB-ASME Vertical Bladder Tanks

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY ELECTRIC RELEASE 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3.

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY PNEUMATIC RELEASE. 1. DESCRIPTION (Refer to Figures 1, 2 or 3.

Model MTB-ASME Horizontal Bladder Tanks

Model MTB-ASME Vertical Bladder Tanks

Special/No Mulch List

NGP-250/500 Nitrogen Generator Quick Start Guide

TECHNICAL DATA OBSOLETE

High-Pressure Boiler Inspection Procedures: A Complete Checklist

FIRE PROTECTION PRODUCTS

Fundamentals of Fire Fighter Skills Correlation Chart

SWIMMING POOL, SPAS, HOT TUB REQUIREMENTS AND GUIDELINES (Updated 3/2018)

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide

DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES

Apparatus Operator/Pumper

Master Control Systems, Inc. Variable Speed Fire Pump Controllers

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel

OPERATION AND MAINTENANCE MANUAL

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

Master Control Systems, Inc. Variable Speed Fire Pump Controllers

Preaction System with Model DV-5 Deluge Valve Single Interlock, Supervised Dry Pilot Actuation 1-1/2 thru 8 Inch (DN40 thru DN200)

TECHNICAL DATA. TRIMPAC Model B-5 & B-5B

Installation, Operation and Maintenance Instructions Buffer Vessel OM006

Back to Basics: Pumping Systems RM ASHRAE TECH CONFERENCE

Backflow What is it? City Water. Boiler. Make-Up Water Line

Laboratory Inspection Checklist

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

TECHNICAL DATA. Trimpac 251a. Spetember 16, 2013

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

CARMACKS. Summary of Facilities: Community Hall Curling Rink Gymnasium Swimming Pool Outdoor Rink Playground/Gazebo Boardwalk Golf Course

THE FOLLOWING CHANGES/ADDITIONS TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED:

Spray Finishing Self-Inspection Checklist

Nottingham Township 909 Sugar Run Road Eighty Four PA (724) Fax (724)

CASED HORIZONTAL FURNACE COIL. Model CK3B. Form No. SS-CK3B-01 FEATURES

TECHNICAL DATA NOTICE

FIRE SPRINKLER PRODUCTS PRODUCT CATALOG

TOUR A HOME LIKE A PRO CHECKLIST

Transcription:

Columbia College, Annual,, Quarterly Building Location Required Due 1. Alder 1 System Riser/Wet Pipe, Back Room, 1 st Floor Mechanical Room, Riser Also Feeds 2 nd Floor Wet Pipe System 6/ 6/ 9/1 12/1 2. Alder/Data Center, Secondary* 1 Clean Agent Inergen System Room A101 and Room 101 (Inergen Tank Storage Room) 4/15 6/ /16 12/1 3. Aspen** 1 System Riser/Wet Pipe, Mechanical Room in the Attic 4 th Qrtr./Annual 6/ 6/ 9/1 12/1

, Annual,, and Quarterly Page 2 Building Location Required Due 4. Buckeye** 1 System Riser/Wet Pipe, Men s Restroom in Custodial Closet; 1 System Riser/ Valve in Mechanical Room in Attic 6/ 6/ 9/1 12/1 5. Cedar** Classroom Piano Room 1 System Riser/Wet Pipe, East Mechanical Room in Attic 1 System Riser/Wet Pipe, West Mechanical Room in Attic 6/ 6/ 9/1 12/1

, Annual,, and Quarterly Page 3 Building Location Required Due 6. Child Development Center 5 System Risers/Wet Pipe: L1 Infant Care, Outside, Front L2 Toddler, Outside, Front L3 Pre-School, Outside, Front L4 Laurel Admin., Outside Back Maple Classrooms, Inside Hallway / 6/ 6/ 9/1 12/1 7. Dogwood 4** Dogwood Stage** 1 System Riser/Wet Pipe, Attic 1 System Riser/Wet Pipe, East Mechanical Room in Attic 6/ 6/ 9/1 12/1

, Annual,, and Quarterly Page 4 Building Location Required Due 8. Madrone** 1 System Riser/Wet Pipe, in Wall in Front of Tool Room/Store Room 6/ 6/ 9/1 12/1 9. Mahogany Paint Booth* Badger Fire Suppression System 6/10/15 10. Manzanita 1 System/Wet Pipe Serving 2 Floors; 3 Risers Located in 1 st Floor Mechanical Room (1-4 Riser for 1 st Floor Interior, 1-4 Riser for 2 nd Floor Interior, 1-2 ½ Riser 2 nd Floor Perimeter), Exterior Soffits Filled with Glycol from the 1 st Floor Mechanical Room /Annual 4 th Qtr. 2 nd Qrtr. 9/20 -- -- 9/1 12/1

, Annual,, and Quarterly Page 5 Building Location Required Due 11. Oak Pavilion 1 System Riser/Wet Pipe, Mechanical Room Pod 5 in Chiller Room; Inspection Valve Pod 2 in Boiler Room; Post Indicator Valve (FDC) East of Building, 6/ 6/ 9/1 12/1 12. Public Safety Center (formerly Fire Station) 1 System Riser/Wet Pipe Room 127 Main Drain Room 119 Check Valve/Anti-Freeze System Bldg. Exterior N/E Corner Inspector s Station 6/ 9/1 12/1

, Annual,, and Quarterly Page 6 Building Location Required Due 13. Redbud 1 System Riser/Wet Pipe Downstairs in Room 14 6/ 6/ 9/1 12/1 14. Sugar Pine Building 1 System/Wet Pipe Serving 3 Floors -- 1 st Floor Riser in Room #104; 2 nd Floor Riser in Room #202; 3 rd Floor System for Mechanical Room/Perimeter Exterior Soffits at 3 rd Floor Level Operates from 2 nd Floor Riser in Room 202. The 3 rd Floor/System filled separately with Glycol (anti-freeze) from within 3 rd Floor Mechanical Room 4/17 6/ 6/ 9/1 12/1

, Annual,, and Quarterly Page 7 Building Location Required Due 15. Tamarack (formerly Learning Resource Center 1 System Riser/Wet Pipe, IT Room, Post Indicator Valve (FDC) North Side of Bldg. 6/ 6/ 9/1 12/1 16. Willow** Attic Basement Front 1 System Riser/Wet Pipe, in Storage Room in Back of Building 1 System Riser/Wet Pipe, in Men s Bathroom Custodial Closet 1 System Riser/Wet Pipe, Middle Room 6/ 6/ 9/1 12/1 Room 2 1 System Riser/Wet Pipe, Back of Building by Back Door *Requires special licensed certified fire suppression systems inspector/tester. **Buildings do not have full commercial sprinkler system. Fire sprinkler coverage in attic space supplied by a domestic water source and consists of only a shut off valve, tamper switch, and flow switch. T/C on 3/2 with Tuolumne County Fire Marshal Steve Gregory, buildings do not need inspection/test. FireSprinklerBldgsList/DuesCC (Revised 11/16) as