Better Market Street Project. Project Update January 15, 2015

Similar documents
Better Market Street Project Update. Urban Forestry Council September 17, 2014

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Central Freeway and Octavia Circulation Study

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Data Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. SFMTA Board of

ABOUT THIS OPEN HOUSE

Pedestrian and Bicycle Conditions

Transportation Assessment

Options. Agenda. Program

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Rethinking Transportation

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Geary Corridor Bus Rapid Transit

Station 1: Street & Sidewalk Upgrades

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Polk Streetscape Project

Mission Bay Loop (MBL) Public Meeting

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

TRANSBAY JOINT POWERS AUTHORITY

A Guide to Great Streets: The Basics. September 25, 2009

ALTERNATIVES SCREENING REPORT

Cycle Track Design Best Practices Cycle Track Sections

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

The Bay Bridge Corridor Congestion Study

PEDESTRIAN ACTION PLAN

San Francisco Transport Strategy: Results Driven Innovation, Partnerships & Pilots

Roadways. Roadways III.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

About the Wilmington Downtown Circulation Study

Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

modes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand).

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Community Task Force March 14, 2018

Bicycle Network. Vision Zero San Francisco The City and County of San

A Survey of Planning, Design, and Education for Bikeways and Bus Routes on Urban Streets

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Transportation Analysis

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

North Shore Transportation Improvement Strategy

FALL 2014 WORKSHOPS TAKEAWAYS

ECONOMY PEOPLE ENVIRONMENT

North Coast Corridor:

Technical Working Group November 15, 2017

TRAFFIC IMPACT ANALYSIS

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

How To Encourage More Efficient Transportation in Brazilian Cities

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Welcome. If you have any questions or comments on the project, please contact:

Copenhagen Cycling Map. Red Lines Cycling facilities

PEDESTRIAN ACTION PLAN

Transportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation

ABOUT MUNI FORWARD. Muni Forward is the SFMTA s initiative to make transit safer and more reliable.

Community Task Force July 25, 2017

Van Ness Avenue Bus Rapid Transit (BRT) San Francisco Environment Commission Policy Committee

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

San Francisco Transportation Plan Update

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

El Paso County 2040 Major Transportation Corridors Plan

Agency Advisory Group Meeting #3 and Walk Audit Anchorage Non-Motorized Plan

Tunnel Reconstruction South 5 th Street Association October 16, 2018

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Community Task Force November 15, 2017

NEWMARKET UPHAM S CORNER

Chapter 3 BUS IMPROVEMENT CONCEPTS

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Welcome to the Quebec Alternatives Analysis Public Meeting

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Chapter 5 Future Transportation

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Vision. Goals and Objectives. Walking

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Freeway ramp intersection study

Omaha s Complete Streets Policy

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

modes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand).

Bluffdale/ UDOT South High-T Intersection Project Type Operations

PEDESTRIAN ACTION PLAN

Access BART: TOD and Improved Connections. October 29, 2008

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

District 6 & Citywide Non-Transit Project Delivery Status Report

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

San Francisco Planning Department IPIC Report 2016

Transcription:

Better Market Street Project Project Update January 15, 2015

Better Market Street Project Area Limits Market Street 2.2 Miles Mission Street

Better Market Street Schedule

Market Street City s busiest transit corridor Over 85 buses per hour 14 surface transit lines + BART+ Muni Metro 250k daily transit boardings City s busiest bicycling thoroughfare and busiest pedestrian street 85k pedestrians per weekend day between 4 th and 5 th 67 Muni-Auto collisions on Market (2012-2013) 53 Bike/Ped-Auto collisions on Market (2012-2013) Bicycle numbers have doubled since 2006

Market Street Sfgate.com

Projected Jobs Growth by 2035 191,000 new workers (approx. 25%) 412,000 more daily car trips (~= current combined AM volume of Bay Bridge and Golden Gate Bridge crossings)

Projected Housing Growth by 2035 101,000 new households (approx. 15%) 412,000 more daily car trips (~= current combined AM volume of Bay Bridge and Golden Gate Bridge crossings)

Market Street & Transit Modes Central role in connecting existing and future transit modes and projected growth in employment and housing.

City s Goals Transit Capacity Muni Forward and Transportation 2030 2014 Bond & 2016 Vehicle License Fee for streets and transportation funding sources ($1.5 billion) Build capacity of Muni s backbone to support planned growth Safety Vision Zero Zero traffic fatalities within 10 years Bicycle Capacity SFMTA Bicycle Strategy 8-10% mode share by 2018; currently 3.5% Street Life Market Street Revamp 1970s streetscape into premier civic and commercial corridor Bring activity and energy to sidewalks and plazas

Studying 3 alternatives in environmental review All 3 alternatives include substantial improvements to pedestrian conditions, cycling facility, transit service and stops and invitations for street life. Alternative 1 Market Street Alternative 2 Market Street (Moderate) Alternative 3 Mission Street + Market Street Alternatives 1 and 2 each include two design options for Market Street s bicycle facility: Option A (Shared Lane) Option B (Cycle Track) Alternative 3 is paired with design option A (Share Lane).

Studying 3 alternatives & 2 Design Options in environmental review All 3 alternatives include substantial improvements to pedestrian conditions, cycling facility, transit service and stops and invitations for street life. 3 Alternatives 2 Design Options 1 Market Street Option A (Market Shared Lane) 2 Market Street (Moderate) OR Option B ( Market Cycle Track) 3 Market Street + Mission Street Option A (Market Share Lane) + Mission Cycle Track

Design Option A Market Street shared lane TO UPDATE

Design Option B - Market Street cycle track

Separated Bike Facility

Alternative 3 Market Shared Lane + Mission Street cycle track

1 TRANSIT DESIGN 2 VEHICULAR RESTRICTIONS 3 LOADING

Increase Capacity and Speed through Design and Operations Transit optimization + Auto restrictions + Separate bicycle facility + Transit signal priority = Anticipated transit improvement of 15-20% local, 20-25% Rapid

Introduction of Rapid service on Market Center-lane Rapid stops at BART/Muni stations near station elevators (5L, 9L, 38L, 71L, F) Moderate increase in space between local stop Generally farside stops to reduce signal delay Existing Proposed Curb (Local): 17 stops 930 spacing Curb (Local): 21 stops 1110 spacing Center (Local): 23 stops 960 spacing Center (Rapid): 12 stops 1930 spacing

Existing Transit Stop Spacing Octavia to 5 th St. Proposed DRAFT

Existing Transit Stop Spacing 5 th St. to Embarcadero Proposed (F-ADA only) (F-no ADA) DRAFT

Stop Widths: Transit Stop Dimensions All islands minimum 8 wide with curb ramp for ADA bus access All center islands would have a wheelchair ramp for F line access Stops lengths designed based on bus frequency Inbound stops fit 1-3 articulated buses stopping simultaneously Outbound designed for 1-2 buses Existing boarding area Future boarding area

Extend & Colorize Transit Only Lanes Existing lanes Extend lanes to the east DRAFT 8 th St 5 th St Adding red treatment improves transit only lane visibility and selfenforcement Extending the transit only lanes will prioritize the Rapid service and improve safety through reduced lane changes Prohibiting taxis from center lane will prevent island blockages Transbay Terminal

New F Turn-back Loop & Layover Proposed F turn-back loop would help better balance F service to demand Potential Layover Location Proposed Track Existing Track

Track Adjustments To accommodate lane shifts at key locations, one track to be shifted about 3 at 2 to 4 locations

1 TRANSIT DESIGN 2 VEHICULAR RESTRICTIONS 3 LOADING

Private Vehicle Restrictions Proposed vehicle restrictions stem from project goals, and will: Improve bicycle, pedestrian and transit safety by reducing conflicts Improve transit travel time by reducing congestion Buses, taxis, commercial vehicles, bicycles and paratransit would be exempt from vehicle restrictions

Analysis of Collision Trends Market has collision rate >4 times higher than Mission Street More collisions caused by cars going straight 100% Auto vs. Bike/Ped Collisions Street of At-Fault Vehicle 80% Automobile: Other 60% 40% 20% Automobile: Through Movement cross street 29% Market St 71% 0% Market Mission

Proposed Western Vehicle Restrictions (Private vehicles only; buses, taxis, bicycle, trucks, paratransit exempt) DRAFT

Proposed Eastern Vehicle Restrictions (Private vehicles only; buses, taxis, bicycle, trucks, paratransit exempt) DRAFT *Alt 3 only

1 TRANSIT DESIGN 2 VEHICULAR RESTRICTIONS 3 LOADING

Relocating Loading Activities Project objectives to enhance public realm and reduce friction supported by relocating loading from Market St. to cross streets and alleys

Analyzing Loading Determine which storefronts could be affected by relocation of loading access. These are businesses with loading access greater than 200 feet from door no access from alleyways

8 th /Grove/Market Grove St Market St North Larkin St

8 th to 7th 460 feet 430 feet Civic Center BART

Refining Loading Proposals Work with new buildings being developed to avoid need to load on Market Work with property owners/businesses to shift loading activities to alleys or cross streets Identify locations where none of the above maintain access and work with them on a case-by-case basis, perhaps: Time-of-day restrictions Retaining key loading bays?

Preliminary results No. of unique businesses Access within 200' % Access outside 200 % NOMA 141 94 67% 47 33% SOMA 172 97 56% 75 44%

Questions & Comments www.bettermarketstreetsf.org