BYRES ROAD: PUBLIC REALM Public Consultation

Similar documents
LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

HISTON ROAD Have your say on better public transport, cycling and walking journeys

MARKHOUSE ROAD IMPROVEMENTS

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

ENFIELD TOWN THE REVISED DESIGN

How do we design for pedestrians? Case study: transforming the Walworth Road

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

Milton Road Project Update. Paul van de Bulk 30 January 2018

Bristol City Council has produced a draft Bristol Transport Strategy document.

Your views are important. Please fill in a form before you leave. Or alternatively

REF. PE01595: MORATORIUM ON SHARED SPACE SCHEMES

Yorkhill & Kelvingrove Community Council Cycling Village Proposal. Yorkhill Kelvingrove Cycling Village (1.3)

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

PROMOTING 20MPH. Photo

Green Streets and Urban Greenways

Easton Safer Streets - Final Project Report BRISTOL

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frome Street Bicycle Route

Urban Street Design and Development

Sevenways Roundabout, and the need for a Road Safety Scheme:

Mornington Crescent Junction (Cobden Junction)

MILTON ROAD LLF PROJECT UPDATE

Have your say on the transformation of Oxford Street West

Chelmsford City Growth Package

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

Background. Caversham a vision for the future. Joint public meeting arranged by:

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

NEW TOWN RETAIL PRECINCT UPGRADE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

South Terrace Pedestrian Safety and Streetscape Improvement: Community Engagement Summary

Lea Bridge Road A street for everyone Tell us

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Welcome! Public Open House on UBC s Transportation Plan

SUPPLEMENTARY GUIDANCE LEITH TOWN CENTRE MAY 2016

Nottingham Cycle City Frequently Asked Questions

TRANSPORT AND MOVEMENT

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

Hopkins Architects. University of Nottingham. University Park Campus Masterplan Strategy. 13 th February 2009

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Chelmsford City Growth Package

Creating liveable and inclusive environments through Street Design. Emily Davie, Sustrans Scotland

STONY PLAIN ROAD STREETSCAPE

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use

Tonight is for you. Learn everything you can. Share all your ideas.

City of Perth Cycle Plan 2029

Nottingham, the great cycle city

Launceston's Transport Futures. Greater travel options for the people of Launceston

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. City of Greater Sudbury. Transportation Demand Management Plan

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

Active Travel Strategy Dumfries and Galloway

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

PLACE CONCEPT! DESIGNS. Simplified crossroads junction to take traffic away from the heart of Picardy Place

Bentleigh GLEN EIRA COUNCIL TRANSFORMATIONAL CONCEPTS 15

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Space for Cycling. A guide for decision makers

CLOSED. Highlights of the Final Concept Design:

CUERDEN TRANSPORT PROPOSALS

Introduction. Prince Street Cycling Ambition Fund Public Realm Project

Transportation Master Plan Advisory Task Force

Douglas Land Use and Transportation Study

Design Workshops Summary of all Feedback January 2017

9. Parking Supporting Statement

Living Streets response to the Draft London Plan

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

Maynooth Cycling. Presentation to Maynooth Community Council 14 December 2015

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Broom Hill/Blackberry Hill Walking and Cycling Improvements

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

Milton Road Bus Stop and Crossings Workshop WSP. 19th September 2017

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk

CONNECTING PEOPLE TO PLACES

20mph. We want to make Edinburgh a better and safer place to live, work and play.

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

2. Context. Existing framework. The context. The challenge. Transport Strategy

Living Streets Policy

Ann Arbor Downtown Street Plan

Travel Plan Monitoring Report. Bourton View, Wellingborough - Residential

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

FUTUREDMS 2018 CONSULTATION REPORT

1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street

Heart of Hackbridge Consultation Feedback

WALK- AND bike-friendly TURLOCK

Report. Typical Sections. City of Middleton, WI

SHOTLEY BRIDGE VILLAGE TRUST

Rural Economy and Connectivity Committee. Restricted Roads (20mph Speed Limit) (Scotland) Bill: Key Themes Arising from the Online Survey

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

Omaha s Complete Streets Policy

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Part B Design Guidance / Principles _

WEST YORKSHIRE LTP CYCLE PROSPECTUS

Transcription:

Public Consultation Introduction As a vibrant commercial, shopping and residential location within the heart of the West End Byres Road is an important destination. Its proximity to the University of Glasgow contributes to its bohemian atmosphere which is enjoyed by residents and visitors alike. Byres Road has experienced many phases of change but the award of funding through the Glasgow City Region City Deal provides an important opportunity to reassess the balance of uses and re-design the street around people making it an even better place to be. The overall aim of the project The Byres Road Placemaking Plan, approved by Glasgow City Council's Regeneration and Economy Committee in January 2017, established that the overall vision was to: Rejuvenate the quality of Byres Road streetscape and public realm to create a people-focussed place that enhances the pedestrian experience, promotes social interaction and dwell time, enhances the economic vibrancy of shops and services and improves its cycle-friendliness and environmental performance. The overarching aim for the redesign of the street is to make Byres Road a safer and more pleasant place to be by prioritising walking, improving ease of access for the less mobile, encouraging cycling and reducing the impact of traffic. Byres Road is narrow in places and the interests of the many different groups who use the street sometimes conflict. The proposal design principles The conceptual proposal for Byres Road and the design principles behind it are described and illustrated on the following 5 sheets. The design is based on the aims of the Byres Road Placemaking Plan but also takes into account the public engagement carried out since February 2017. The overarching aim for the redesign of Byres Road is achieved by: making it easier and safer to enjoy moving around on foot - Ÿ widening and upgrading the footways to make movement along the street more relaxed and enjoyable and to reduce the width of crossing points Ÿ introducing step free crossings to give pedestrians priority at junctions with side streets and improve general accessibility for all Ÿ retaining signalised pedestrian crossings at key junctions Ÿ reducing unnecessary street clutter Ÿ enhancing key corners to create distinct and attractive spaces along the street where people can pause or linger in comfort promoting an inclusive solution - Ÿ making the street easily accessible for all through smooth, level surfaces and careful siting of car parking Ÿ retaining a kerb to provide segregation between footways and spaces used by bikes and cars Ÿ providing frequent and regular locations to sit and rest along the length of the street Ÿ consulting further in the detailed design phase on the most appropriate locations for accessible parking workshop with Glasgow Disability Alliance

Public Consultation making the street a more pleasant place to be - Ÿ reducing the speed of traffic through the introduction of a 20mph speed limit Ÿ reducing the width of the carriageway to 6m Ÿ discouraging through traffic to reduce noise and air pollution whilst maintaining access for residents Ÿ reducing on-street car parking provision to create additional pedestrian and cycling space Ÿ introducing trees either directly into the ground or in planters Ÿ using greenery to delineate space and provide seasonal interest particularly at street corners Ÿ introducing pedestrian lighting to animate spaces and generally improve the feeling of safety for all users making cycling to/from and along Byres Road more convenient and safe - Ÿ introducing 1.5m wide cycle lanes on Byres Road including a contraflow cycle lane (south of Church Street) to allow cyclists a continuous route between Great Western Road and Partick Cross Ÿ provision of advanced stop lines and cycle gates to increase safety and comfort at junctions Ÿ reducing potential conflict between cyclists and pedestrians by retaining a kerb between footways and cycle lanes creating a better trading environment for local businesses Ÿ responding to the findings of the shoppers' survey which showed significant support for measures to improve the quality of the pedestrian environment and reduce the impact of motorised transport Ÿ retaining a number of on-street parking bays Ÿ widening footways to provide a more comfortable pedestrian environment and the opportunity to comfortably accommodate other uses including pavement cafes Ÿ retaining loading bays, bus stops and taxi rank in current locations If you would like to comment This is an important opportunity to transform Byres Road making it a better place for everybody. If you would like to make a comment please respond using Glasgow City Council's official website by Wednesday 27th June 2018: www.glasgow.gov.uk/consultations There will be an opportunity to speak to Council Officers involved in the project on the following dates: Partick Library Thursday 24 May 1500-1900 Hillhead Library Thursday 31 May 1500-1900 Next steps Following the formal consultation period the design concept will be taken to Committee for approval in August 2018. Material comments received during the consultation period will be addressed during detailed technical design which will take place before works commence in Autumn 2019. Design on a second phase of works aimed at enhancing links to the University Campus extension will commence in 2019. Investment will be focused on University Avenue, Church Street and the area around Kelvinhall Station including Partick Cross. info-panels As part of this study, surveys were undertaken to provide a bench mark against which change could be measured. The results reflect how Byres Road performs today and give us an indication of where priorities need to be focussed if Byres Road is to be transformed. It is important to look forward and imagine how Byres Road could work better and, importantly, how behaviour could be changed to achieve the vision. Any future image of Byres Road would be based on the premise that there would be mutual respect between the various users. At peak times there are approx. 3,500 pedestrians/hour using Byres Road s pavements equating to Buchanan Street on a quiet day Interesting facts about Byres Road appear in green boxes in the following exhibition panels.

Partick Cross to Chancellor Street before and after at Chancellor Street At peak times there are approx. 3,500 pedestrians/hour using Byres Road s pavements equating to Buchanan Street on a quiet day before and after at Torness/Dalcross Street

Church Street to Havelock Street street section Charles Clinkard Bar Soba 40% of people shopping on Byres Road live or work within 10 minutes walk from the street Byres Road at the Church Street/White Street junction

Havelock Street to Ashton Lane before and after at Dowanside Road street section 69% of shoppers on Byres Road Little Italy Ashton Road car park have arrived using sustainable methods of transport, ie walking or cycling (40%) or public transport (29%) before and after at Ashton Road

Ashton Lane to Cresswell Street before and after at Roxburgh Street In the summer those arriving by active travel generate 41% of the monthly retail spend on Byres Road which increases to 67% during University term-time. By comparison, those arriving by car account for 36% of the monthly retail spend during summer and 10% during term-time. before and after at Gt George Street

Observatory Rd to Gt Western Road before and after at Vinicombe Street/Waitrose street section Recognising that 31% of Waitrose Papyrus shoppers currently arrive in Byres Road by car or taxi, the proposal retains 994 parking spaces (currently 1071 within the immediate area)