Kelsow Work Instruction. Subsea Well Control Hydraulic Panel Operation

Similar documents
OPERATING PROCEDURES

MWEA MAINTENANCE SEMINAR SPECIALTY VALVES POWER GLOBES

Wellhead Safety Valve Control System (Wellhead Control Panel)

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS

DUPLEX PRESSURE REDUCING SET

SECTION P4 SEPARATION SYSTEMS

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

BUBBLER CONTROL SYSTEM

Safety Manual: Hazardous Energy. January, 2017

INSTALLATION OPERATION MAINTENANCE

SEPARATION SYSTEMS. Separator (MBD-1600) or the Wet Oil Tank, (ABJ-1800). Water is

BUBBLER CONTROL SYSTEM

I T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

SINGER MODEL 106/206-RPS-L&H


WW-730. Pressure Sustaining/Relief Control Valve

T e l N o : F a x N o : E m a i l : a i s h c m c - m e. c o m w w w. c m c - m e.

MANUAL GAS MANIFOLDS

CHE Well Testing Package/Service:

EDUCATION DEPARTMENT ACCU-TEST

NORMAL OPERATING PROCEDURES Operating Parameter Information

Burner Management System DEMO Operating instructions

Four common PRESSURE CALIBRATION PAIN POINTS

BERMAD Fire Protection Hydraulic Control Valves

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501).

Model: 43T. Bermad Pressure Relief Valve

BACK PRESSURE / SUSTAINING

BACK PRESSURE / SUSTAINING

AUTOMATIC GAS MANIFOLDS

ejector solutions Flare Gas Recovery Case Study Major Norwegian Operator, North Sea

IWCF Equipment Sample Questions (Surface Stack)

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

QuickHeat TM Packaged Heat Exchanger Solutions

EXECUTIVE SHIP MANAGEMENT PTE LTD M 24 Q 4 SINGAPORE QI 19 Page 1 of 5 (9/05 Rev 2) Decision. Implement


Actuator HON 670 / 671

Job Sheet 1. Geothermal Energy

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

Copyright, 2005 GPM Hydraulic Consulting, Inc.

CASE STUDY. Compressed Air Control System. Industry. Application. Background. Challenge. Results. Automotive Assembly

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May

PressureGuard. Self-Contained Hydraulic Emergency Shutdown Systems For Rotary or Non API 6A Linear Valves

Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment

Installation, commissioning and servicing instructions

SECTION P4 SEPARATION SYSTEMS

Lifespan Improvements Available in the Industry

Unit 24: Applications of Pneumatics and Hydraulics

Overview. SEMEMI216 SQA Unit Code HF4G 04 Carrying out fault location on fluid power equipment and circuits

VALVES OPERATION, MAINTENANCE & TROUBLESHOOTING

SCOTTISH WATER. Waste Water Treatment Works. Typical WWTW Ellipse Equipment No: XXXX Ellipse Plant No: STW00XXXX

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Digital Range

Flexfence Swaging Unit. Product Manual. Release 02/16.

Winter Shut Down Procedure

NGP-250/500 Nitrogen Generator Quick Start Guide

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

Spirax Compact FREME Flash Recovery Energy Management Equipment

Propane Conversion Kit Instruction

SEMEMI SQA Unit Code H2AX 04 Carrying out scheduled maintenance tasks on fluid power equipment

FE Petro vs. New Red Jacket Competitive Comparison

Gas / Liquid sampling tool Hydraulic operated

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

Copeland Discus with CoreSense Diagnostics January 2011

FIELD TROUBLESHOOTING COMMON MECHANICAL SEAL PIPING PLANS. Michael Huebner Principal Engineer Flowserve Corporation Pasadena, TX USA

DASSAULT AVIATION Proprietary Data

R E D I C O N T R O L S

Valve test benches. Systems overview

USER MANUAL OPERATION AND THE USE OF A CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM

THE NATURAL CHOICE. High end valves for the natural gas value chain. Inspired By Challenge

SUBMITTAL NOTES PROJECT: Ross Model 50RWR-A Pilot Operated Surge Relief Valve with Hydraulic Anticipation. Size: inch / mm

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

Safety Relief Valve HON 832

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland

Rate of Flow Valve Series 120

TECHNICAL DATA. Dry 132a. October 1, 2008

SERVICE MANUAL No. I-0043

Apollo Safety Features

Scott Veirs September Safety and Environmental Impact for SubFab Operations

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

HIPPS Development Project

Wilo Triple Duty Valve / Triple Service Valve Installation and operating instructions

Types 749B and R130 Changeover Manifolds

Propane Conversion Kit Instruction

Safety Powder Spray Systems

WW-720. Pressure Reducing Control Valve

Rhino VE CE Bulk Unloader Operator s Card

JET Mini Mechanical Pressurisation Equipment

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

OPERATING INSTRUCTIONS Pressure Control System PCS-20 through PCS-100

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Section - III SYSTEMS DESCRIPTION

Standard Operating Manual

DESIGN DATA. Dry 105a. September 5, 2008

Design DSA Steam-Atomized Desuperheater

EZ-CAL HIGH PRESSURE CUT-OUT TEST BLOCK & CALIBRATION KIT

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Touch Screen Guide. OG-1500 and OG Part # T011

Transcription:

Kelsow Work Instruction Subsea Well Control Hydraulic Panel Operation

Table of Contents Overview............................................................................ 2 Hydraulic Panel Isolation........................................................... 3 LP Hydraulics....................................................................... 4 HP Hydraulics....................................................................... 5 Regulator Failure................................................................... 6 Kelsow Work Instruction 2008

Overview Subsea Well Control Hydraulic Panel Operation The operation of the well control hydraulic panel is a critical task performed by the outside production technician on offshore production platforms and FPSO. The outside production technician must be familiar with the low pressure and high pressure operation of the hydraulics, including the isolation of the panel for maintenance and troubleshooting. A common problem encountered is the failure of the pressure regulators, and the isolation of the failed unit and commissioning of the back-up unit must be carried out promptly to avoid costly down-time of the production wells. This Kelsow Work Instruction details the operation of the panel and the steps to perform these isolations effectively and safely on this critical equipment. By having this work instruction on hand at the hydraulic panel location, can ensure this information is readily available for the technician to perform the operations promptly, with the necessary information on hand to minimise production downtime. Kelsow Work Instruction 2008 2

Hydraulic Panel Isolation LP Hydraulics Last Valve Off (LVO) from hydraulic panel to XV- 7001/7002 on turret, and to WHP. HP Hydraulics Last Valve Off (LVO) from hydraulic panel to WHP and SSSVs. Supply from Accumulators to Hydraulic Panel - Isolation Valves Kelsow Work Instruction 2008 3

LP Hydraulics Current Set-Up of LP Hydraulic Pumps & Accumulator Setpoints Lead Pump P8601B Setpoint 33.0 MPa. Pump cut-in 4.4 MPa below setpoint (28.6 MPa) when in auto control, cut-out at 33.0 MPa. Lag Pump P8601A Setpoint 33.0 MPa. Pump cut-in 7.4 MPa below setpoint (25.6 MPa) when in auto control, cut-out at 30.5 MPa. Common Parameters High Pressure Alarm 35.0 MPa (0.6 MPa deadband). Low Pressure Alarm 24.4 MPa (1.0 MPa deadband). LP Hydraulic Pumps Set up to run as Lead & Lag (both A + B). If ESD 1 or 2, push reset on each pump s start panel, and re-start all pumps manually. If WHP-SSD, only need to start 2 x LP pumps. After starting pumps, setpoint of 33.0 MPa accumulator pressure must be reached, before pumps will maintain pressure automatically. May need to shut LVO on hydraulic panel to achieve this. One red light on pressure switch will go out, one will stay on, to indicate pressure switch reset. If pumps will not start, wait until accumulator has bled down below 33.0 Mpa. Same principal applies to HP Hydraulics. LP Accumulator Pressures If both red lights are on, pumps have not reset Kelsow Work Instruction 2008 4

HP Hydraulics Current Set-Up of HP Hydraulic Pumps & Accumulator Setpoints Lead Pump P8602B Setpoint 50.0 MPa. Pump cut-in 4.5 MPa below setpoint when in auto control (45.5 MPa), cut-out at 50.0 MPa. Lag Pump P8602A Setpoint 50.0 MPA. Pump cut-in 7.0 MPa below setpoint when in auto control (43.0 MPa), cut-out at 46.5 MPa. Common Parameters High Pressure Alarm 51.0 MPa (0.5 MPa deadband). - Low Pressure Alarm 43.5 MPa (2.0 MPa deadband). HP Hydraulic Pumps Set up to run as Lead & Lag (both A + B). If ESD 1 or 2, push reset on each pump s start panel, and re-start all pumps manually. If WHP-SSD, only need to start 2 x LP pumps. After starting pumps, setpoint of 51 MPa accumulator pressure must be reached, before pumps will maintain pressure automatically. The LVO on hydraulic panel may need to be shut to achieve this. One red light on pressure switch will go out, one will stay on, to indicate pressure switch is reset. If pumps won t start, wait until accumulator has bled down below 51 Mpa setpoint. Same principal applies to LP Hydraulics. HP Accumulator Pressures If both red lights are on, pumps have not reset Kelsow Work Instruction 2008 5

Regulator Failure Regulator Failure If regulator surging or relief valve failed, change over regulators. If it is known no leaks exist between FPSO & WHP Shut Hydraulics LVO, to seal in pressure from FPSO to WHP. Change over regulator duty, reopen LVO. If known leaks exist between FPSO & WHP Method to change over regulators on the run: Shut upstream block valve of failed regulator, wind regulator out to relieve pressure. Open upstream block valve of standby regulator, and wind in to build up pressure. Shut downstream block valve of failed regulator, then open downstream block valve of the now commissioned standby regulator. Adjust on-line regulator to correct pressure. Regulator Downstream Block Valves LP Hydraulics Last Valve Off FPSO Regulator Upstream Block Valves Kelsow Work Instruction 2008 6

PO Box 5596 Manly QLD 4179 AUSTRALIA Tel: +61 (0)7 3396 1913 Mob: +61 (0)408 275 535 Email: info@kelsowconsulting.com Web: www.kelsowconsulting.com