March 29, 2012 MEMORANDUM. Fish and Wildlife Committee Members. Peter Paquet, Manager Wildlife & Resident Fish

Similar documents
September 4, Update on Columbia basin Salmon and Steelhead Recovery Planning

June 3, 2014 MEMORANDUM. Council Members. Stacy Horton, Policy Analyst, Washington. SUBJECT: Final 2012 Hatchery Fin Clip Report

October 1, Jim Ruff, Manager, Mainstem Passage and River Operations

Summary of HSRG Findings for Chum Populations in the Lower Columbia River and Gorge

Strategies for mitigating ecological effects of hatchery programs

April 26, Chairman Rockefeller and members of the Fish and Wildlife Committee. Briefing from Mid-Columbia Regional Fish Enhancement Group (RFEG)

MEMORANDUM. July 2, Council members. Tony Grover, Fish and Wildlife Division Director SUBJECT:

Brian Missildine Natural Resource Scientist Hatchery Evaluation and Assessment Team Lead Washington-British Columbia Annual General Meeting Kelowna,

MEMORANDUM. Joan Dukes, NPCC. Michele DeHart. DATE: August 5, Data Request

Chinook Salmon Transfers by WDF. A long history of genotypic mixing raises questions about current policy

January 13, Mr. William C. Maslen Manager, Fish and Wildlife Division Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery

Okanagan Sockeye Reintroduction

March 6, SUBJECT: Briefing on Columbia River Basin salmon and steelhead returns for 2017 and run forecasts for 2018

TESTIMONY OF THE COLUMBIA RIVER TREATY TRIBES BEFORE PACIFIC FISHERIES MANAGEMENT COUNCIL April 12, 2010 Portland, OR

Attachment 1. Agenda Item Summary BACKGROUND

July 24, Kalispel Tribe of Indians Update on Efforts to Suppress Northern Pike and Policy Implications

September 27, 2012 MEMORANDUM. Fish and Wildlife Committee. Lynn Palensky. Update on Geographic Review


January 4, Addresses water quality within the Council program.

LEAVENWORTH COMPLEX HATCHERY PROGRAMS. Presentation to the Independent Science Advisory Board

ESCA. Endangered Species Conservation Act of 1969 Changed in 1973 to ESA Amended several times

ESTIMATED RETURNS AND HARVEST OF COLUMBIA RIVER FALL CHINOOK 2000 TO BY JOHN McKERN FISH PASSAGE SOLUTIONS

May 28, SUBJECT: Management Recommendations from ISRP/ISAB s Tagging Report #2009-1

Wild Steelhead Coalition Richard Burge Conservation VP September 11, 2006

October 2, SUBJECT: Presentation on Invasive Northern Pike and Lessons from the Pend Oreille

August 2, 2016 MEMORANDUM. Council Members. SUBJECT: Bull trout ESA litigation update

Kirt Hughes Washington Department of Fish and Wildlife Region 6 - Fish Program Manager

Sockeye Reintroduction program. April 12, 2014 BCWF AGA Howie Wright

June 14, Sincerely,

September 9, SUBJECT: Presentation on the historic Ceremonial Chinook Fishery held on the Duck Valley Reservation by the Shoshone-Paiute Tribe

May 31, IDFG hatchery /supplementation polices and activities

Hatchery Reform and our Pacific Region National Fish Hatcheries. Presented by Doug Olson

August 7, SUBJECT: Briefing on Surface Collectors in the Pacific Northwest: Operating Characteristics and Collection Success

Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management

Yakima/Klickitat Fisheries Project

Salmon Recovery Planning in Washington

Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River. Kris Homel

NEZ PERCE TRIBE Department of Fisheries Resources Management Administration Enforcement Harvest Production Research Resident Fish Watershed

February 23, Patty O Toole Manager, Fish and Wildlife Program Implementation Tony Grover - Director, Fish and Wildlife Division

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell:

Implementing Hatchery Reform in the State of Idaho

COLUMBIA RIVER SALMON AND STEELHEAD HARVEST 1980 TO by John McKern for The Columbia-Snake River Irrigators Association

Subject: Wells Hydroelectric Project FERC Project No Bull Trout Management Plan and Incidental Take Annual Report

October 25, 2012 MEMORANDUM. Fish and Wildlife Committee. Lynn Palensky, Program Development Manager. Update on Geographic Review

Update on Columbia Basin Partnership Task Force

Backgrounder and Frequently Asked Questions

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Columbia River Salmon Harvest Sport and Commercial Sharing Facts and Relationships

Subject: Wells Hydroelectric Project FERC Project No Annual Report Anadromous Fish Agreement and Habitat Conservation Plan

Hatchery Scientific Review Group Review and Recommendations

APPENDIX D: LEWIS RIVER HATCHERY REVIEW

P U B L I C U T I L I T Y D I S T R I C T N O.

Hatchery Information for Subbasin Planning

Hatchery Scientific Review Group Review and Recommendations

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT - WINTER FACT SHEET NO.

Appendix D HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Washington Department Fish and Wildlife

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT: SUMMER FACT SHEET NO. 1 Columbia River Compact June 13, 2012

Press Release New Bilateral Agreement May 22, 2008

State of Washington Dept. of Fish and Wildlife invites applications for the position of: Permanent Fisheries Biologist 4 *

Ned Currence, Nooksack Indian Tribe

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT SUMMER FACT SHEET NO. 1 June 10, 2010

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

Cowlitz River Fisheries and Hatchery Management Plan (FHMP)

Incidental Take Permits for HCP Plan Species

The Dipnetter. December published for tribal fishers by the Columbia River Inter-Tribal Fish Commission

Management Strategies for Columbia River Recreational and Commercial Fisheries: 2013 and Beyond

Joint Columbia River Management Staff

March 5, Jim Ruff Manager, Mainstem Passage and River Operations

Meeting Minutes FINAL. Aquatic Settlement Work Group. I. Summary of Action Items. To: Aquatic SWG Parties Date: February 15, 2018

Joint Columbia River Management Staff

For next Thurs: Jackson et al Historical overfishing and the recent collapse of coastal ecosystems. Science 293:

Status Determination Criteria for Willapa Bay Natural Coho. Salmon Technical Team and Washington Department of Fish and Wildlife

F INAL MEMORANDUM ACTION ITEM SUMMARY. Date: December 17, To: Wells, Rocky Reach, and Rock Island HCPs Hatchery Committees.

Students Saving Salmon

Attachment 6. Public Correspondence. Public correspondence received as of July 2, 2008

Sockeye Transboundary Collaborations developed through the Columbia Basin Accords

Nez Perce Treaty of 1855

2016 Annual Work Plan

Honorable Kimberly D. Bose July 2, 2013 Secretary Federal Energy Regulatory Commission 888 1st Street N.E. Washington, D.C

Project Proposal FY 2007 Funding (Funding available through December 31, 2009)

PRE-SEASON PLANNING FOR FRASER SALMON and STOCKS OF CONCERN. Forum on Conservation and Harvest Planning for Fraser Salmon January 22, 2010

Hatcheries: Role in Restoration and Enhancement of Salmon Populations

Upper Columbia Salmon Restoration: Breakout session: Columbia River Treaty Review Conference Castlegar, BC March 22 nd, 2013

Yakima River Basin Coho Reintroduction Feasibility Study

Rivers Inlet Salmon Initiative

Faith in Nature: The Missing Element in Salmon Management and Mitigation Programs

Columbia River Sturgeon in Decline. Recommendation for Harvest Reform

Throughout the Pacific Northwest, salmon and steelhead have been listed under the Endangered Species Act because their existence is either threatened

May 1, 2018 MEMORANDUM. Council Members. John Harrison, Information Officer

COASTAL CONSERVATION ASSOCIATION

2017 Non-Treaty Columbia River Summer/Fall Fishery Allocation Agreement June 15, 2017

Hatchery Scientific Review Group Review and Recommendations

Memorandum FINAL. Action Item Summary

Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat

Comparative Survival Study

RE: Comments to the WDFW on the SEPA Scoping Process regarding the preparation of the State-wide Resource Management Plan (RMP) for steelhead.

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT - SPRING FACT SHEET NO.

Hoh River Wild Steelhead on the Brink

Transcription:

Joan M. Dukes Chair Oregon Bruce A. Measure Montana James A. Yost Idaho W. Bill Booth Idaho Rhonda Whiting Vice-Chair Montana Bill Bradbury Oregon Tom Karier Washington Phil Rockefeller Washington March 29, 2012 MEMORANDUM TO: FROM: SUBJECT: Fish and Wildlife Committee Members Peter Paquet, Manager Wildlife & Resident Fish WDFW Hatchery/Supplementation Policies and Activities Heather Bartlett, WDFW hatchery division manager and Shaun Seaman, Chelan County PUD fish and wildlife director will brief the Committee on WDFW policies and activities related to hatcheries and supplementation. See the attached PowerPoint handout for further detail. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161 www.nwcouncil.org Fax: 503-820-2370

3/29/2012 Historical Context, Legal Basis, Endangered Species Act and Hatchery Reform Heather Bartlett, Hatcheries Division Manager (Fish Program) 1. Historical and legal context December 2010 2. Historical and contemporary production, and economic value January 2011 3. Endangered Species Act, salmon recovery and hatchery reform June 2011 http://wdfw.wa.gov/hatcheries/overview.htm 1 2 Salmon in Washington Prior to 1900, abundance legendary Important protein on international scale First dramatic collapse evident just prior to turn of century Over fishing Land and water use practices Development of hatcheries Harvest demand Public works initiatives Mitigation 3 4 Mitigation Major obstructions Minor obstructions Pollution or deforestation Water withdrawal Phase 1 of 6 1890 1905 Period of concentration on taking large numbers of eggs with fry releases and very limited or no rearing and feeding. Kalama River Soos Creek* Kendall Crk. Samish Dungeness 5 6 1

3/29/2012 Phase 2 of 6 1906 1936 Period of large egg taking and short term rearing. Wll Wallace* Voights Creek Minter Creek Lewis River Phase 3 of 6 1937 1945 Period of smaller egg takes, intensive rearing in ponds, and initiation iti of migration and disease studies. Marblemount Bingham Crk Issaquah* 7 8 Phase 4 of 6 1945 1949 Expansion and modernization of hatchery system with new stations and rebuilding of old stations. Klickitat North Toutle Renovated Wallace Dungeness* Kalama Phase 5 of 6 1950 to 1981 Development of production hatcheries that maximize use of all available fresh and salt water areas. Nemah Naselle Forks Crk Humptulips George Adams* Hoodsport 9 10 Phase 6 of 6 1982 to present Development of large facilities and modernization of older facilities to produce fewer salmon with better survival. Lyons Ferry* Eastbank Methow State legal foundation Policy that hatcheries can be used to mitigate the damage caused by dams is embodied in state statute. Arose out of controversy when Elwha Dam built Initially enacted in 1915 and today is contained in RCW 77.57.050 Operating agency shall provide fishways, facilities and hatcheries contained in RCW 43.52.350 11 12 2

3/29/2012 State tribal legal foundation Series of court cases in Columbia River and Puget Sound related to fishery management Belloni decision 1969, fair and equitable. Remains an active case today known as US v Oregon. Boldt decision 1974, defined fair and equitable as 50:50 sharing of the fish not needed for spawning. Remains an active case today known as US v Washington. Judge Belloni adopted Judge Boldt s definition of fair and equitable. State tribal legal foundation Case within US v Washington articulated that hatchery fish count in determining treaty/non treaty fair sharing (9 th Circuit 1985). Rationale of the court was the mitigating function of the hatchery fish programs. For the tribes to bear the full burden of the decline caused by the non Indian neighbors without sharing the replacement achieved through the hatcheries, would be an inequity and inconsistent with the Treaty. 13 14 Cooperative management Based on principles of government to government relationship. Embodied in the 1985 PS Salmon Management Plan No modifications may be made to the equilibrium brood document without prior agreement of the affected parties. Embodied in the 1986 Hood Canal Management Plan In no case will the loss of production in Hood Canal be disproportionate to the overall cutback in the aggregate of the WDF, USFWS, and tribal facilities. Embodied in series of agreements for the Columbia River 2008 2017 US v Oregon Mgmt. Agreement. Cooperative process in place to track and report production Future Brood Document http://wdfw.wa.gov/hatcheries/future_brood.html Statewide Hatchery Salmon and Steelhead Releases 1960 2008 (All Operators) sh Released* Total Fis 400 350 300 250 200 150 100 50 0 Millions 1960 1962 1964 1966 1968 Est'd Non WDFW 1991 1994 1970 1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 Release Year 1992 1994 1996 1998 2000 2002 2004 2006 2008 * WDFW s reconstructed releases from all agencies across the state. Releases from 1960 1989 are estimated from state s Salmon 2000 report. Releases from 1989+ are from the WDFW Hatchery Plants database and PSC data (for non WDFW estimates). 15 16 Economic Impacts WestportZ Snoqualmie River Economic Impacts: What data forms the basis of the report $35 (TCW 2009) $30 Treaty and non treaty fisheries in $25 Washington $20 Average fishery $15 contribution in years $10 2000 2005 * Not all WDFW hatchery production is represented in the following estimate. Economic indicators represent only a monetary value. Minimum Annual Personal Income Generated by WDFW Salmon & Steelhead Hatcheries in Washington Fisheries 1999 2005 Personal Incom me Generated $5 $30 $68 million Annually* $9 $29 $0 Millions Puget Sound Coast Lower Columbia WDFW Production Region Source: TCW Economics, Economic Analysis of WDFW s Hatchery 2020 Plans, Tech. Memo, 2009. Reported in 2007 dollars 17 18 3

3/29/2012 Economic Impacts: $35 $30 $25 $20 $15 $10 $5 $0 $ Millions Minimum Annual Personal Income Generated by WDFW Hatcheries in Washington Fisheries, by Species (%) 23% 20% 29% 28% 49% 39% 12% 47% 39% 15% Puget Sound Coast Lower Columbia WDFW Production Regions Source TCW Economics, Economic Analysis of WDFW s Hatchery 2020 Plans, Tech. Memo, 2009 Steelhead Chum Coho Chinook Key points Long history of hatchery production that has changed over the decades with new information and science. Provide significant harvest opportunity and economic value Over 75% of fish harvested are hatchery origin Almost $70 million dollars in local personal income generated between sport and commercial fisheries across Puget Sound, Washington Coast and lower Columbia River. Hatchery fish can pose risks to natural spawning populations Hatchery reform is initiative to reduce the risks posed by hatchery fish while providing fish for harvest. 19 20 Federal Endangered Species Act Effects Identified: Hatcheries identified as factor contributing to the decline of wild populations. ESA authorization is needed to continue hatchery operations. Hatchery and Genetic Managements Plans HGMP Currently, 20 programs are formally permitted under ESA ~150 HGMPs have been submitted state wide for consultation Currently two federal hatchery reviews underway The Puget Sound and Mitchell Act NEPA Genetic Ecological Facility Diversity Domestication Inbreeding Depression Predation Competition Disease Water Quality Fish Passage Intake Screening 21 22 22 Hatchery Scientific Review Group (HSRG) Principles of Hatchery Reform GOALS Independent scientific panel Developed and recommend approaches to reduce the risks of hatchery programs Review of Puget Sound and WA Coast from 2000 04 and Columbia R. from 2005 09 SCIENTIFICALLY DEFENSIBLE INFORMED DECISION MAKING 23 24 4

3/29/2012 Fish and Wildlife Commission Policy C 3619 to advance the conservation and recovery of wild salmon and steelhead by promoting and guiding the implementation of hatchery reform. Use the principles, standards and recommendations of the HSRG Designate programs as Conservation or Harvest Fish and Wildlife Commission Policy guidelines: Develop watershed specific plans to implement hatchery reform Implement HSRG broodstock management standards for all WDFW programs by 2015 Externally mark all fish produced for harvest Bring WDFW facilities into compliance with environmental standards 25 26 Watershed level Plans Puget Sound State tribal coordinated Hatchery Action Implementation Plans (HAIP) Coordinated with the PS Federal Hatchery NEPA EIS Completion in early 2012 Initiation of citizen based advisory group WA Coast HAIP process initiated with treaty tribes Completion in mid 2013 Watershed level Plans cont. Lower Columbia River Conservation and Sustainable Fisheries Plan drafted. Aligns WDFW production with Recovery Plan objectives SEPA will be initiated with the completion of the Mitchell Act NEPA process Interior Columbia Basin Current production agreement under US v OR (08 2017) Revised steelhead production in the Lower Snake River Revised Wenatchee spring Chinook & summer steelhead Revised Methow River steelhead production More opportunities for revision 27 28 Implementing HSRG Broodstock Management Standards Mass marking of Harvest Production 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 90% 90% WDFW programs not meeting HSRG standards WDFW programs needing agreements WDFW programs meeting or will meet HSRG standards 1998 2008 2010 2011 2012 2013 2014 2015 Current est All Coho salmon WDFW produces for harvest are mass marked 23.3 million released in 2010 All steelhead WDFW produces for harvest are mass marked 6.5 million released in 2010 Chinook WDFW produces for harvest 96 million released in 2010 (96%) 3.8 million not mass marked (Priest Rapids Hatchery) 29 30 5

3/29/2012 Achieve Environmental Standards by 2025 (21 st Century Salmon Steelhead Benchmark) Hatchery Reform Capital Projects Prioritized 2011 2013 State capital budget request: Hatchery related fish passage barriers $450K ($1.28M received) Full facility rebuilds/planning $15.8 million ($1M received) Hatchery Intakes $3.8 million ($3.4M received) Minor works broodstock mgmt $1.6 million ($0 received) 2009 2010 Federal funding request Mitchell Act & PCSRF Hatchery related fish passage barriers $720K (100% funded) Hatchery intakes (design and repair) $1 million (100% funded) Broodstock management $4 million (100% funded) Summary Hatchery Reform Policy represents a paradigm shift for hatchery production ESA authorization offers additional impetus for hatchery reform Policy Progress Watershed Plans: Lower Columbia River completed Puget Sound 2012 completion WA Coast 2013 completion Implementing HSRG Broodstock Standards: Currently 45% statewide meet standards Schedule is in place to meet the 2015 timeline for 90% of programs 31 32 Summary (continued ) Mass marking of harvest production 100% of coho and steelhead >95% of Chinook mass marked Questions? Hatchery Reform capital and operational projects are prioritized by WDFW for all budget requests. 33 34 6

Overview of Hatchery Programs Chelan County PUD Northwest Power & Conservation Council April 2012 Meeting Presented By: Shaun Seaman Chelan County PUD

Presentation Overview Habitat Conservation Plan Hatchery Programs Operations and M&E Adaptive Management Alignment with: Hatchery reform Recovery planning NPCC F&W Program

History of Chelan PUD Hatcheries 1963 First Hatchery Obligations for Rocky Reach 1989 RI Settlement Agreement Salmon and Steelhead compensation 1990-2004 FERC Agreements setting production levels through judicial process 2004 2054 HCP Framework

Habitat Conservation Plans Signed by: Chelan County PUD Colville Confederated Tribes National Marine Fisheries Service U.S. Fish and Wildlife Service Washington Department of Fish and Wildlife Yakama Nation

Habitat Conservation Plans 100 % No Net Impact 2 % 91 % 7 % Habitat Passage Survival Hatchery

6

Hatchery Operations and Contracted Productions Washington Department of Fish and Wildlife Contracted Production Okanagan Nations Alliance Douglas County PUD Colville Confederated Tribes Yakama Nation

Conceptual Approach to Monitoring and Evaluating the Chelan County Public Utility District Hatchery Programs Final Report Andrew Murdoch Chuck Peven Prepared for: Chelan PUD Habitat Conservation Plan s Hatchery Committee Committee members: Brian Cates (USFWS) Jerry Marco (Colville Tribes) Kristine Petersen (NMFS) Shaun Seaman (Chelan PUD) Tom Scribner (YN) Kirk Truscott (WDFW) July 2005

Program Influences & Alignments HCP Sideboards US v Oregon Hatchery Reform ESA Recovery Plans Possible Prescriptive Drivers

HSRG Review and Actions HSRG review in 2008 Many changes completed or underway Spring Chinook Summer/Fall Chinook Steelhead Sockeye

Upper Columbia River Recovery Plan Drafted by the UCSRB Adopted by NOAA Fisheries in 2007 Short and long term objectives Short and long term actions Research and Monitoring Objectives and Actions

Summary Overview of the HCPs Hatchery component of mitigation Hatchery programs Coordination with Hatchery Reform Coordination with Upper Columbia Salmon Recovery Plan

Shaun Seaman Chelan County PUD 509-661-4459 Shaun.seaman@chelanpud.org Questions