RISK ASSESSMENT FOR GO APE TREE TOP JUNIOR COURSE

Similar documents
RISK ASSESSMENT FOR GO APE CONTINUOUS BELAY

RISK ASSESSMENT FOR GO APE CONTINUOUS BELAY

RISK ASSESSMENT FOR GO APE, ADVENTURE FOREST LIMITED

Grizedale Zip Trekking Adventure Risk Assessment

Grizedale Zip Trekking Adventure Risk Assessment

PART TWO Reviewed by Operations Team and H&S Manager February 2018 TO BE REVIEWED: January 2019

Grizedale Zip Trekking Adventure Risk Assessment

Risk Control Measures in Place Remaining Risk Falling from a height Participants 5 The instructor is trained and assessed by a competent person.

Climbing Area. Review Completed by: Jamie Brunt Approved By: Steve Allard Date: June 2012

Risk Assessment Ground Belay

Risk Assessment Ground Belay

General Risk Assessment for Climbing, Bouldering and Abseiling

Lifting Operation & Lifting Equipment Procedure

POSITION OF PERSON COMPLETING REPORT: IN CONSULTATION WITH: David Radolovic POSITION: HSR/ Program Coordinator

Risk Assessment Mobile Climbing Wall

High Ropes Management Plan

LEVEL 3 NPTC CERTIFICATE OF COMPETENCE IN THE THOROUGH EXAMINATION OF ARBORICULTURAL EQUIPMENT. ASSESSMENT SCHEDULE (Revised Aug 2010)

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT

Low Ropes and Adventure Course Risk Assessment

ATOM-X 2. User Manual

RISK MANAGEMENT PLAN Outdoor Education

Hampstead Hill School Health and Safety Policy: Play Equipment

Lifting Equipment Protocol

Pre-control risk estimate. Likelihood Risk

What we are already doing Working at Height comes within the framework of St. Matthew s Health and Safety and Fire arrangements policy

Summary of Manufacturers stated maximum life for obsolescence of Recreational Climbing Equipment.

RAMS information for HangDog Indoor Climbing Centre

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

The Lifting Operations and Lifting Equipment Regulations 1998 ('LOLER') How they apply to rope-based access systems for work at height

TOOL BOX TALK NO3. Use of P.P.E

Abseiling Risk Management Plan Lutanda Yarramundi

Work At Height Health & Safety Management Standard Issue 3 (April 2011)

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

2.25 Work Equipment Policy and Procedure Table of Contents

Abseiling Risk Management Plan

Rock Climbing Risk Management Plan Lutanda Yarramundi

WORKING SAFELY IN TREES TREEKIT GUIDE TO THOROUGH INSPECTIONS OF EQUIPMENT FOR WORKING AT HEIGHT. Incorporating:

University of Lincoln Students Union Annual Risk Assessment for Activities

Rock Climbing Review date December 2013

Risk Assessment Form

GUIDELINES FOR USE GUARD

GUIDE 2002 HEALTH AND SAFETY FOR ARTIFICIAL CLIMBING STRUCTURES AND OPERATIONS FOR DESIGNERS, MANUFACTURES, SUPPLIERS, OPERATORS AND USERS

Risk Assessment for Redpoint Climbing Centre & RedBloc Bouldering Centre

Lifting Equipment Procedure. Committees / Group Date Consultation: Health and Safety Sub Committee Nov 2016

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

RISK Assessment & Management Plan

Mountaineering Code of Practice

Camp Barrabadeen Risk Assessment

Personal Protective Equipment

Risk Assessment Form Deer Park, Cowley

Risk Assessment for Rock Climbing

Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome

Guidance on Using Temporary Suspended Access Equipment

Work At Heights Toolkit. for Supervisors

Control Control Owner Residual Risk I L Score I L Score

PRACTICAL ADVICE ON LOCK-OFF RECYCLING/RECOVERY MACHINERY

HS26 Working at Height Policy and Procedure

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE

Risk Assessment Generic

Health & Safety Policy & Plan. Rightway Roofing.

Operating instructions. Bolt-on Bar Joist Anchorage

A GUIDE TO BUYING FALL ARREST EQUIPMENT. uk.rs-online.com (UK customers) (International customers)

Safety Management Plan

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

Risk Assessment for Low Ropes

1.1 OHS Policy and Responsibilities

Use of the Climbing wall at Pendle Vale College. Method statement and risk assessment

Figure 1 - Parts Identification. Copyright 2002, DB Industries, Inc.

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Safe Use of Access Equipment

A short guide to the Personal Protective Equipment at Work Regulations 1992

Risk Assessment for Team Builders

OBELISK & TRIBUS Locking Pin 50mm

Extreme Adventure Ltd Risk Assessment

Installation & User Manual

The Trekking Company Ltd. Risk Assessments

RISK ASSESSMENT: Education Directorate - basic guidance

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

RISK ASSESSMENT Indoor Abseiling

Mountain Bike Risk Management Plan

Suitability of Work Equipment

Prevention of Falls and Working at Heights

LEVEL 3 NPTC CERTIFICATE OF COMPETENCE IN THE THOROUGH EXAMINATION OF ARBORICULTURAL EQUIPMENT

Exercise IARD. Risk Assessment & Management Plan

WORK METHOD STATEMENT STRUCTURAL STEEL

DEFENCE INSTRUCTIONS AND NOTICES (Not to be communicated to anyone outside HM Service without authority)

RISK ASSESSMENT Outdoor Abseiling

User Instructions 1789 Parapet Wall Anchor

Summer Scrambling / Mountaineering

LIFT MAINTENANCE POLICY

Risk Assessment Examples

Telco Antennas SWMS Working At Height Above 2m

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

FALL PROTECTION / ELEVATED WORK

RISK ASSESSMENT Outdoor Climbing Wall

LEVEL 2 AWARD IN CHAINSAW AND RELATED OPERATIONS (QCF)

Transcription:

SUBJECT: Tree Top Junior RISK ASSESSMENT NUMBER: 01 WRITTEN BY: Rob Davies REVIEW DATE: February 2014 SER HAZARD LHD CON WHO MIGHT BE HARMED EXISTING CONTROL MEASURES Falling to the ground or Continuous Belay Safety System does not require onto another person or Customer Course Users to unclip their safety lines at onto another part of the any point. course or another object Shackles to be tightened using appropriate tool due to: prevent customers tampering, and loosening off. A Unclipping from security cable tie is added to aid checking of shackles safety system then Instructors to attach customers to safety system on the slipping, jumping ground or falling, either Minimum height of 1m wearing footwear to enable unintentionally or users to move their safety lines around the safety intentionally system. Height markers installed. Instructors carry Clipping on to the out check if unsure. safety cable Under 6 year olds to be accompanied by an adult (system) (1:2) to assist with safety lines. incorrectly Maximum weight of 20.5 stone / 130 kg due to load Failure of part of Employees limits of course (Altus load testing advice). Scales the course Course Users provided at sites. Information provided to customers 001a infrastructure V High Contractors on booking confirmation documents, RAD and PPE failure, Onlookers website. incorrect selection, Trespassers Anyone who is deemed to be under the influence of use, fitting, etc alcohol or drugs is not permitted access onto the Tree failure, falling course. over or onto the Anyone who does not have the correct footwear (e.g. course, etc sandals) or clothing that may lead to a slip or a trip Slips and trips will not be allowed onto the course. Instructors will access the course using the standard This could happen Go Ape Safety Lines and system of use (see Training whilst opening or below). closing the course, Only mature and competent instructors will be operating the course, allowed to supervise the Tree Top Junior this is to participating on the ensure they can handle difficult groups when under course, carrying out pressure. inspections or carrying Instructors to be trained and assessed in moving out a rescue customers on the Tree Top Junior course. GAD TTJ Moving Customers Method Statements Training 001b Instructors must be competent at working on the course. GAD Opening and Closing the Course. WAH regs. See Feb 2012 1 FURTHER CONTROL MEASURES RR

note 2 below re Instructor Training Instructors trained in rescue procedures (see separate risk assessment for this and associated procedures). WAH regs. Instructors trained in the correct fitting and inspection of PPE to ensure they are safe for course participants and they cannot fall out of the harness and the harness is in good order and will not break. Site Managers must undergo a 1 day PPE inspection course so they are competent to inspect Go Ape Explorer PPE. 001c 001d Feb 2012 2 Course inspections and checks Pre-use course checks and inspections carried out by instructor when opening up course to ensure course is safe to use and no overnight damage has occurred. This must be completed from the base of the zip line where possible so any overnight vandalism can be checked. WAH regs. Periodic site inspections (2 monthly) are carried out and recorded by the Site Manager or a competent person appointed by the Site Manager. Annual inspection of the course, including all anchor points and points used for rescues (note: large maillons are fitted in areas where there is no obvious identifiable attachment points), by an external competent person / company. LOLER & PUWER regs Records of inspections and examinations, maintenance, testing and certificates of conformity to be kept. (See Daily Report and Monthly Course Inspection). WAH regs Following high winds, snow and lightning the course must be checked thoroughly for any damage, initially from the ground and then on the course, prior to opening the course to participants. Inspection records are to be checked by the Area Manager during Site Audits. PPE provision and checks Effective procurement and management system, using reputable suppliers to ensure all PPE is of the correct standard (CE marked, etc) and design and has correct information provided for use and is therefore safe and appropriate for its intended use. PPE regs. Advice on selection of correct PPE that is fit for purpose and use must be sought from industry experts and suppliers. All equipment must be used correctly as directed by

Feb 2012 3 manufacturers guidelines. A copy of each new batch of PPE s manufacturing guidelines is to be kept on the site PPE file by the Site Manager. PPE compatibility policy (where more than 1 item of PPE is being worn) is to be checked by an Operations Manager who must have undertaken the 4 day PPE inspection course and who must seek advice from reputable suppliers on compatibility. This ensures that it is safe for two pieces of PPE to be used together in a system and applies to chest harnesses and fall arrest lanyards, etc. PPE regs. All PPE must be checked for faults prior to first use (from the manufacturer) PPE regs. PPE must be inspected every two months. Where PPE is thought to be defective it is to be placed in the quarantine box until examined by the PPE trained Operations Manager or Operations Director. Faulty PPE is to be returned to the supplier for repair or replaced. PPE to be visually checked prior to each use. This includes harnesses and rescue equipment that must be inspected by a trained instructor to ensure it is safe to use. PPE regs. PPE is to be stored in a dry, clean area, away from any chemicals. PPE must be cleaned and dried as detailed in the manufacturers guidelines. All PPE must be identifiable, documented and thoroughly examined annually by an Operations Manager who has undertaken the 4 day PPE inspection course. PPE regs. (Note that an examination and inspection are different.) All PPE must be documented and logged by the Site Manager, including inspection and maintenance records. These records must be checked periodically by the Operations Team. GAD Site Audits. PPE regs. The Operations Managers and Site Managers are to ensure that all instructors are trained in the correct fitting of PPE, its operation and its operating limits, inspection of the PPE and are to record the training on the individual staff Training Record Sheet. PPE regs. A selection of harnesses and lanyards are to be break tested periodically (suggest annually) to ensure that they are still strong enough and suitable for the purpose. This will be controlled by the Operations Director at Lyon Equipment or Petzl. These records must be kept until the PPE or batch is retired from service. PPE replacement is to follow manufacturers guidelines. A trained instructor must check all course participants

001e Feb 2012 4 harnesses before they go onto the course to ensure they are correctly fitted. If a course user removes their harness for a rest break or toilet break, they must be checked for correct fitting prior to the course user returning onto the course. 2 styles of harness are used for the TTJ Course. Full body Simba harnesses for those up to 40kg and Gym harnesses for others. Chest harnesses are to be fitted to course users in Gym Harnesses who have little or no hip definition whereby a normal sit harness may slip off their hips (this includes course users with large bellies or slim hips). Only PPE approved by the Operations Director can be used on a Go Ape course. Personal PPE must not be used, (except in exceptional circumstances by a contractor clearance for this is required from the Operations Director). Safety helmets are to be worn for all construction work and rescue training (to mitigate a fall). Site Manager undergo a 1 day PPE inspection training course so they can identify problems with PPE. Site Managers must then train their instructors in PPE inspection and the identification of likely problems. The PPE inspection poster is to be displayed at all sites as a reminder. Builders and contractors PPE should be visually checked when being used on the course. Operation systems and controls of the course The continual belay system will be used by all customers on the course. Instructors to use a system for clipping onto the safety system throughout the course that has a backup, so that a junction can be passed without completely unclipping. Therefore two lanyards must be used. Likewise in rescues there must always be a back up safety system. GAD Rescue Procedures. In lightning, high winds, heavy ice and snow, the course must be evacuated and closed. Duty Manager Guidelines and Emergency Evacuation Procedures. Whilst on the course, the use of mobile phones as telephones is not permitted as this can lead to distraction and unclipping from the course. Mobile phones can be used to take photographs but must be secured to the user to prevent them falling. Cameras must also be secured. Course participants who wear glasses must have them

secured when going around the course. This can be done effectively using rubber bands. When the course is closed or is to be left unmanned the trapdoor on to the main platform should be locked shut. Any tasks being undertaken apart from the normal day to day running of the course (opening, closing) must be carried out by a minimum of two people; this includes any work involving moving obstacles or moving off the normal route of the course (platforms and cables). GAD method statements. 001f 002 Falling objects from the course onto the course 003 Impact including: Course users swinging Medi um Medium Course users Employees Contractors Public Feb 2012 5 Trees Prior to a new course opening all trees that form part of the course are to be inspected for stability and disease by a qualified arboricultural expert. AFNOR standard. All trees are to be inspected annually by an arboriculturalist and a written report of these inspections is to be kept. AFNOR standard. Retainers and Lanyards Course users must attach all loose items to themselves (such as cameras) or have them secured within pockets. Information must be supplied to course users during the Safety Brief. When instructors are carrying out maintenance tasks at height, tools must be retained by using a retaining cord or lanyard. All individual PPE, including pulleys, must be attached to the course user. Instructors Pulleys must be attached to the harness by using a pulley retaining lanyard. (introduced in 2003). Equipment used for moving customers must be attached at all times. In moving a customer the trolley must be attached to the instructor while it is being removed form the cable. GAD Moving Customers Method Statement Trees All course trees should be visually checked daily, by the instructor opening the course, for loose and broken branches that may become dislodged and fall. Deadwood likely to fall onto the course should be removed so it does not fall onto course users. High Course design Design of the course must take into consideration the possibility of impact problems. Materials are finished to

into something solid On the course At the landing (e.g. resulting in lower leg injury) Being struck by parts of the course Collision On Zip slides At Zip landing 004 Head impact on metal brackets at junctions Med Med Course Users Employees provide smooth, surfaces. Zip slides and landing areas are designed at an angle and sag to arrive at an optimum landing speed. Landing sites are constructed to provide a soft and moveable surface of woodchip or wood peel. Zip landing sites are fenced off to stop members of the public and children wandering into them. Operating Procedures Landing areas are to be prepared (raked or dug) on a regular basis to ensure they comply with guidelines (GAD landing sites). Only 1 course participant is allowed on the zip slide at any one time. Safety Brief & Written Safety Rules and Advice. Provision of Information Provision of suitable and sufficient information and training to course participants to ensure they are safe when crossing obstacles and descending zip lines. Written Safety Rules and Advice which must be read or read to all course participants, Instructors Safety Brief given to all course participants. e.g. Course participants informed on landing technique to minimise risk of injury when completing a zip line. Course participants recommended to wear ankle supporting boots. Sandals not allowed. Customer advice. Where the course design requires participants to duck under handrail cables (eg Moors Valley and Thetford) helmets should be worn at all times including instructors. Padding to be added to junctions to draw attention to their position and provide protection when helmets are not worn. Refer to GAD Wearing Helmets on Junior Courses. 005 Head impact from trollies when they drop down the cable to pass under handrails 006 Entanglement in ropes nets, cables or chains and body parts trapped in moving parts of the course Zip wire Med Med Course Users Employees Where the safety cable drops down at the end of each crossing (Moors Valley and Thetford) helmets should be worn by all participants. Refer to GAD Wearing Helmets on Junior Courses. High Course Design Course designed to minimise the risk of entanglement or entrapment. Operating Procedures Hair tied up or pulled back under helmets where worn Suitable clothing Effective supervision Feb 2012 6

007 Unsuitable PPE: Incorrect assessment of loadings including premature failing or malfunctioning of PPE 008 Inadequate Supervision Incompetence Children rushing ahead Distracted attention of adult Distance between supervisor and children Inadequate patrolling RISK ASSESSMENT FOR GO APE TREE TOP JUNIOR COURSE V High See Point 001d Damage to PPE No smoking whilst wearing harnesses No use of chemicals near PPE (insect repellant, sun cream) Use of experienced and competent course designers Records of materials High V High Course Users Booking Terms and Conditions Employees Instructor check Written Safety Rules and Advice Training Supervision 1 to 2 for under 6s 1 to 6 recommended for over 6s either on the ground or participating on the course additional adults advised for larger groups 2 to a crossing, only on to be an adut 4 on a platform instructors present on the main platform instructor to radio base if leaving platform 009 Rowdy Groups Medi um High Course users Instructors to monitor from platform Advice to supervising adults Exclusion from course where necessary Written Safety Rules and Advice 010 Unauthorised Users V. High Public Access to course Access hatch to be o Locked overnight o Shut when an instructor not present on platform. o Shut if instructor leaves platform Double gate to be installed on the ground to control access to the stairs. Refs HSW Act 1974, MHSW regs amend 1999, WAH regs 2005, PUWER 1992, LOLER 1998, PPE regs 1992, Workplace HSW regs 1992, H&S (Safety Signs) regs 1996, First Aid regs 1981, Occupiers Liability Act 1984, HSE Info Sheets (Ents) No 14 & 15, HSE 5 Steps to Risk Assessment INDG 163, HSE A Guide to Risk Assessment requirements INDG 218, AFNOR standard, HSE ADIPS standard. GAD = Go Ape documents Notes: Control Measures - Where a control measure has been identified, it is only included once and not repeated under every serial number. Therefore for a specific hazard identified, a control measure in a serial above may apply to that hazard. (HSE RA guidance.) Feb 2012 7

LEVEL LHD = LIKELIHOOD CON = CONSEQUENCE RR = RESIDUAL RISK Very low Definitely will not happen. Injury very insignificant i.e. splinters. Minimal risk, control measure more than necessary. Unlikely to happen. Injury fairly minor, i.e. minor cut, graze, bruising. Control measures satisfactory. Medium Moderate chance of accident happening. Injury would stop casualty continuing with task. Control measures adequate. High Quite likely to happen. Serious injury requiring medical assistance, i.e broken Control measure requires constant supervision. Re-assess bones, deep cut. situation. Very high Likelihood will happen. Very serious injury or possible fatality. Control measures inadequate. Stop activity. Note 1: Control Measures - Where a control measure has been identified, it is only included once and not repeated under every serial number. Therefore for a specific hazard identified, a control measure in a serial above may apply to that hazard. (HSE RA guidance.) Note 2: Instructors Training - Go Ape instructors must pass through a rigorous training and assessment programme before they can instruct on Go Ape. To be selected for training prospective instructors must demonstrate they have the requisite aptitude and experience. They then undergo training in safety instruction and procedures, operational limits on the use of the course, course inspections during daily course opening and closing, patrolling techniques, personal protective equipment, harness fitting and inspection, emergency operations, health and safety and customer management. Only instructors with climbing experience and the correct aptitude are selected for additional training in rope rescue techniques. Instructors are First Aid trained. Go Ape s training objectives and rescue procedures have been developed in conjunction with an external specialist technical advisor who holds the Mountaineering Instructors Certificate and the European Mountain Leader Award (rescue procedures updated in 2005 by Berwyn Evans MIC). Assessment of rescue trained instructors is only carried out by our trained and qualified persons, who have been formally assessed as competent to do so by the Operations Manager responsible for training. Feb 2012 8