Regional Transportation Needs Within Southeastern Wisconsin

Similar documents
# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

#83875 v1 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Recommended Plan. Overview and Summary June

#82820 v1 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Recommended Plan. Myths and Facts. May Myths to be Addressed

VISION. Introduction WHAT S INSIDE. One Region, Focusing on Our Future

Chapter 7 TRANSPORTATION FACILITIES ELEMENT INTRODUCTION

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Clackamas County Comprehensive Plan

Transportation Master Plan Advisory Task Force

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Washington DC Section of ITE Project Briefing

PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

2. Context. Existing framework. The context. The challenge. Transport Strategy

Solana Beach Comprehensive Active Transportation Strategy (CATS)

APPENDIX M FOR THE JEFFERSON COUNTY PORTION OF THE VISION 2050 PLAN RECOMMENDATIONS MILWAUKEE URBANIZED AREA INTRODUCTION

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

York Region Population and Employment Growth

Durham Region Long Term Transit Strategy

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

North Coast Corridor:

Develop a Multi-Modal Transportation Strategy (Theme 6)

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Project Description Form 6V

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Chapter 6 Transportation Plan

WELCOME TO OPEN HOUSE # 1 June 14, 2017

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Typical Rush Hour Commute. PennyforTransportation.com

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Route 7 Corridor Study

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Measuring the Distribution and Costs of Congestion. Tim Lomax Texas Transportation Institute

ACTIVE TRANSPORTATION

SOUTHEASTERN WISCONSIN REGIONAL FREEWAY SYSTEM RECONSTRUCTION STUDY

I-105 Corridor Sustainability Study (CSS)

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House

Congestion Evaluation Best Practices

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

Chapter 5 Future Transportation

5.0 Roadway System Plan

Mobility and Congestion

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Highway Transitway Corridor Study

Bellevue Transportation: Challenges, Opportunities and Priorities Bellevue Downtown Association September 20, 2018

South King County High-Capacity Transit Corridor Study

El Paso County 2040 Major Transportation Corridors Plan

Proposed White Flint Separated Bike Lane Network September 2015

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

5. RUNNINGWAY GUIDELINES

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

City of Bartow Comprehensive Plan. Transportation Element

Public Consultation Centre

Iowa Corridor Management Pilot Project Overview. Recommendations For A Corridor Management Program August 2004

Nomination. Halton Region in Context

TRANSPORTATION NEEDS ASSESSMENT

Transportation Corridor Studies: Summary of Recommendations

Governor s Transportation Vision Panel

Bicycle Master Plan Goals, Strategies, and Policies

Chapter 2: Standards for Access, Non-Motorized, and Transit

2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION

Performance Criteria for 2035 Long Range Transportation Plan

SUMMARY OF TRANSPORTATION INVESTMENTS

Freeway System Considerations

Comprehensive Collection of Stakeholder Alternatives by Mode

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Community Task Force July 25, 2017

APPENDIX D. May 22, 2002 Open House Summary and Materials

2045 Long Range Transportation Plan. Summary of Draft

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

AMATS Complete Streets Policy

Dear City Council Members,

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Non-Motorized Transportation 7-1

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

How To Encourage More Efficient Transportation in Brazilian Cities

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Base Information. 1. Project Title County Line Road Shoulder Improvements. Start: County Line Road/17 th Avenue End: County Line Road/State Highway 66

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project

Parks Highway: MP Lucus Road to Big Lake Road

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

North Shore Transportation Improvement Strategy

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

Basalt Creek Transportation Refinement Plan Recommendations

Bus Rapid Transit Plans

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

Transcription:

Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1

Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency for land use and infrastructure in the seven county Southeastern Wisconsin Region. Transportation Flood management Sewerage Water Supply Parks and open spaces Environmental corridors Natural areas Urban and rural development By law, the regional plans are advisory to State, county, and municipal governments 2

Introduction (continued) Southeastern Wisconsin About 40 percent of the State s population, jobs, wealth About 5 percent of the State s area 3

Southeastern Wisconsin Transportation Problems, Concerns, and Needs Presentation is based on findings, conclusions, and recommendations of the Commission s regional transportation planning Recently completed review, update and extension of regional transportation plan to year 2035 Guided by Advisory Committee with representatives of the seven counties and 147 municipalities of the Region, WisDOT and WisDNR, and U.S. DOT and U.S. EPA Considered forecast growth of the Region to the year 2035 jobs, population, and households Defined guiding vision, principles, and objectives for land use and transportation 4

Southeastern Wisconsin Transportation Problems, Concerns, and Needs (continued) Developed the regional transportation plan to serve, be consistent with, and promote implementation of, a more desirable future land use pattern. Considered the potential of more efficient land use and expanded public transit, systems management, bicycle and pedestrian facilities, and demand management to first alleviate traffic congestion. Highway improvements were only then considered to address any residual congestion. Each plan element needs to be implemented to provide a comprehensive, multi-modal, balanced, high quality transportation system in southeastern Wisconsin. Arterial Streets and Highways Freeways Surface Arterials Public Transit Transportation Systems Management Bicycle and Pedestrian Facilities Travel Demand Management Throughout the process extensive efforts were made to inform, and obtain input from the public. (www.sewrpc.org/regionalplans/) 5

Southeastern Wisconsin Transportation Problems, Concerns, and Needs (continued) Arterial Street and Highway System Freeways Surface Arterial Streets and Highways Public Transit System Systems Management Bicycle and Pedestrian Facilities Demand Management 6

Importance of Southeastern Wisconsin Freeway System Importance to the State Carries virtually all vehicle traffic traveling through the Region on an average weekday Importance to Southeastern Wisconsin residents, businesses, and industries About 33 percent of all travel made on an average weekday by Southeastern Wisconsin residents and by Milwaukee County residents is made on the freeway system. 7

Regional Freeway System: Problems and Concerns Need for reconstruction The freeway system is nearing the end of its 40 to 50 year service life. After the reconstruction of the Marquette Interchange from 2005 to 2008, the rest of the 270-mile freeway system will require reconstruction segment-by-segment over the next 30 to 40 years. Physical Design The 30 to 50 year old freeway system has many design deficiencies: left-hand ramps, lane drops, low speed freeway-to-freeway ramps, closely spaced freeway-to-freeway interchanges and service interchanges, inadequate interchange ramp tapers, lack of shoulders in some locations, and others. Traffic Accidents The Milwaukee County freeway system accident rate is more than double that of the other six counties due to a greater concentration of design deficiencies and more severe traffic congestion. Rear-end accident rates are 5 to 15 times higher on congested freeways. More than 70 percent of the accidents on congested freeway segments are rear-end accidents. Accident rates on freeway segments in other counties exceed region and countywide averages by 50 percent or more. 8

Growing Freeway System Traffic Congestion 1980 Note: Color represents most severe level of congestion experienced for at least one hour in each direction on an average weekday. 2001 Extreme - stop-and-go bumper-tobumper traffic averaging 20 to 30 mph or less. Severe - speeds reduced by up to 15 mph and extremely difficult to change lanes. Moderate - speeds reduced by up to 5 mph and difficult to change lanes. 9

Regional Freeway System: Needs Need to reconstruct Need to reconstruct to modern design standards Need to reconstruct with additional lanes 10

Regional Freeway System : Need to Reconstruct to Modern Design Standards Reconfigure freeway-to-freeway system interchanges Relocate left hand on- and off-ramps to right hand side of freeway Eliminate lane drops Improve freeway-to-freeway ramps to provide ramp speeds that are closer to freeway mainline speeds Address service interchanges which are too close to major freeway-to-freeway ramps Improve freeway system service interchanges Lengthen and widen ramp tapers Convert multi-point exits to single point exits Separate ramps from frontage roads in Kenosha and Racine Counties Provide selected auxiliary lanes to address closely spaced interchanges Improve freeway mainline Improve freeway horizontal and vertical curvature, grades, and vertical clearance to meet standards Provide full inside and outside shoulders 11

Regional Freeway System: Need to Reconstruct with Additional Lanes Widen from 6 to 8 Lanes Widen from 4 to 6 Lanes Recommended Additional Lanes 127 miles, or 47 percent of the regional freeway system Address existing and forecast traffic congestion Recommended lane additions are: 6 lanes to 8 lanes 4 lanes to 6 lanes 12

Regional Freeway System: Need to Reconstruct with Additional Lanes (continued) Widening would permit avoiding a substantial increase in freeway system traffic congestion 150 FREEWAY MILES AFFECTED BY CONGESTION ON AN AVERAGE WEEKDAY 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Moderate Congestion Severe Congestion Extreme Congestion Existing Year 2001 2035 No Additional Lanes 2035 Modern Design Standards and Additional Lanes * 2001 * *(Forecasts of freeway traffic volume and congestion consider freeway widening as a measure of last resort, as they identify the freeway traffic volume and congestion expected even with smart land use growth, substantially expanded public transit, and improved surface arterial streets) 13

Regional Freeway System: Need to Reconstruct with Additional Lanes (continued) Widen from 6 to 8 Lanes Widen from 4 to 6 Lanes Adding lanes to 127 miles of the freeway system during reconstruction represents an estimated 11 percent of the cost of freeway system reconstruction, and provides a 33 to 50 percent increase in the traffic-carrying capacity of the freeway system. Adding lanes to 127 miles of the freeway system is estimated to only require the acquisition of about 30 homes over the next 30 years. Air pollutant emissions are projected to continue to decline from 2001 to 2035 even with increasing traffic due to cleaner motor vehicles Ozone related emissions 70 to 90 percent Fine particulates and carbon monoxide 55 percent Air toxics 70 percent 14

Surface Arterial Street and Highway System: Needs Need a good surface arterial street system carries over 60 percent of travel in the Region. There are about 3,300 miles of surface arterials in southeastern Wisconsin principal function is to carry and move traffic (Surface arterials account for about 33 percent of the 11,000 total miles of streets and highways) 3,049 miles will require preservation through the year 2035 (resurfacing and reconstruction) 226 miles will require widening with additional traffic lanes upon reconstruction 75 miles of proposed new arterials Together with widened freeways, proposed 12 percent expansion of total arterial street system capacity over next 30 years (4 percent expansion of lane-miles) 15

Public Transit: Problems, Concerns, Needs Public transit system in decline since 2000 15% reduction in service and substantial increases in fares HISTORIC VEHICLE-MILES OF PUBLIC TRANSIT SERVICE ON AN AVERAGE WEEKDAY IN THE SOUTHEASTERN WISCONSIN REGION: 1985-2005 100 90 AVERAGE WEEKDAY REVENUE VEHICLE MILES OF TRANSIT SERVICE (THOUSANDS) 80 70 60 50 40 30 20 10 1985 1990 1995 2000 2005 YEAR 16

Need for Public Transit Provides an alternative mode of more efficient travel for heavily traveled corridors, and densely developed urban communities and activity centers where it is not desirable, or possible to accommodate all travel by automobile. Contributes to efficiency in the transportation system, including reduced highway traffic and congestion, air pollution, and energy consumption. Supports and encourages higher development density and infill development and redevelopment which results in efficiencies for the overall transportation system and other public infrastructure and services. Provides choice in transportation, enhancing the Region s quality of life and economy. Reduces the necessary household expenditures on transportation, permitting greater household savings, other expenditures, and overall higher standard of living. Positive impact on household quality of life and local economy. Essential to meeting the travel needs work, education, healthcare, shopping of persons unable to use personal automobile transportation. (16 percent or 61,000 households in Milwaukee County, 8 percent or 5,800 households in Racine County, and 7 percent or 3,800 households in Kenosha County) About 40 percent of Milwaukee County transit riders do not have an auto available for travel. 17

Public Transit Needs PUBLIC TRANSIT PLAN: 2035 Need to significantly expand public transit, with a goal of doubling transit service from 69,000 to 138,000 vehiclemiles of service on an average weekday by the year 2035. Need to develop true rapid and express transit system elements. 18

Public Transit Needs (continued) Rapid transit A network of bus routes operating throughout the day and evening in both directions, at convenient service frequencies. Stops every 3 to 5 miles to increase accessibility and facilitate reverse commuting. 200 percent increase over existing service 19

Public Transit Needs (continued) Express transit A grid of limited-stop bus routes with service throughout the day and evening at convenient service frequencies. Stop spacing of about every one-quarter to one-half mile. 20

Public Transit Needs (continued) Local transit Expansion of local transit service hours and frequency and extension to developing areas. Approximately a 60 percent expansion over current local transit service. 21

Public Transit Needs (continued) Need to consider upgrading to rail transit or bus guideways. Milwaukee downtown connector study - study underway of bus guideway express transit alternatives. Kenosha-Racine-Milwaukee corridor commuter rail corridor study under refinement. 22

Why KRM Commuter Rail? Fast and convenient service Twice as fast as bus and faster than auto High degree of reliability Removes traffic from highway system Environmental benefits Increased travel safety High quality alternative for travel during freeway reconstruction over next 20 years Improved job and labor force accessibility Will promote high density efficient land development and redevelopment around stations Promote KRM corridor economic development Potential GMIA increased use and flights Improved accessibility to arts, culture, and entertainment Improved accessibility to colleges/universities 23

Public Transit Needs (continued) Proposed doubling of transit service over next 30 years Will Require Renewed level of State funding for public transit Dedicated local funding Regional Transit Authority 24

Systems Management: Needs Need to continue and expand efforts to operate and manage the existing street system as efficiently as possible, obtaining the maximum capacity from the existing street system. Expansion and enhancement of freeway traffic management system Operations monitoring and control Advisory Information Incident Management Improved surface arterial management Expansion and enhancement of coordinated traffic signal systems Regional and local operations improvement program 25

Bicycle and Pedestrian Facilities: Needs Bicycle accommodation should be considered and implemented as the 3,300 mile surface arterial street system is resurfaced and reconstructed. Paved and widened shoulders Widened outside travel lanes Bicycle lanes Separate bicycle path Continued development of a planned 575 mile system of off-street bicycle/pedestrian paths connecting the Kenosha, Milwaukee and Racine areas, and urban communities with a population of 5,000 or more, nearly a threefold expansion of existing 203 miles of paths. 26

Demand Management: Needs Need to continue and expand efforts to encourage actions resulting in reductions in personal and vehicular travel. Expansion from 49 to 74 park-ride lots Exclusive HOV lanes at freeway on-ramps and surface street express bus lanes Express transit signal priority 27

Summary and Conclusion To support and encourage expansion of the economy of the Region and the State, and provide a high quality of life, a comprehensive, multimodal, balanced, high quality transportation system in southeastern Wisconsin must continue to be developed within southeastern Wisconsin: Arterial Streets and Highways Freeway System Surface Arterials Public Transit Transportation Systems Management Bicycle and Pedestrian Facilities Travel Demand Management 28