West Burnside/Couch Green Streets

Similar documents
Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Major Bike Routes 102 Avenue Workshop April 21, 2015

Pedestrian and Bicycle Safety Program Leg Agency Title of Project Project Description Dist

3. INTERCONNECTED STREETS AND TRANSPORTATION NETWORKS

Seattle Bicycle Advisory Board August 3, 2011

Right-of-Way Standards

Right-of-Way Standards

Bridges and Arizona Crossings

Schutte Park Master Plan February 14, 2017

Annual Listing of Obligated MPO Projects

5 CIRCULATION AND STREET DESIGN

Safe Routes to School Action Plan Aberdeen, Idaho

PUBLIC REALM MASTER PLAN

83 AVENUE PRE-CONSTRUCTION MEETING

September 2010 Review Project Concepts SCHEMATIC DESIGN NEGOTIATION CONSTRUCTION

Maywood Town Hall Meeting. May 4, 2016

Old Dominion Drive (Route 309) Pedestrian Safety Project Phase II. North Glebe Road to 38 th Street N

STREETSCAPE CONCEPTS

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

Traffic Management and Mitigation Study in the Leslieville Community Transportation Services Division & IBI Group IBI GROUP

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Shared Court Housing Concept Summary

PROJECT KEY TYPICAL SECTION 1 =60

PIONEER SQUARE ACTIVE STREETS

TRANSPORTATION STANDARDS

This page intentionally left blank.

Delta Planning Workshop Team

Introduction. North 12 th Complete Street Project Overview

Guthriesville Village Manual of Written & Graphic Design Guidelines

Pre-Construction Meeting

CITY OF SOUTH DAYTONA

TRANSPORTATION COMMISSION Agenda Staff Report

Flanders Crossing. Save Lives Save Money Saving Our Environment. Portland City Council April 30, 2008

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Bus Service Reductions

Chapter 6 Transportation Plan

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Vicinity Map. Proposed Roosevelt Street Sidewalk Project OVERLAND ROAD TO CASSIA STREET W ROSE HILL ST W ALBION ST S OWYHEE ST W CASSIA ST

PORTLAND BICYCLE COUNTS 2007

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN

WELCOME. to the meeting for the. Westside Avenue Action Plan Gateway to Revitalization

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

Lawrence Avenue Streetscape Concepts August 30, 2011

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOR LEASE PASEO STUDIOS N Walker Ave., Oklahoma City, OK Jeremy Foraker President Office

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Fulton Market Streetscape

BPP / SUB

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

Application of a Complete Street

RECOMMENDED MOTION: I MOVE TO PASS SECOND READING AND ADOPT ORDINANCE 556, TO REMOVE NE 173RD STREET FROM THE DESIGNATED PEDESTRIAN-ORIENTED STREETS.

5. Automobile Circulation, Wayfinding and Signage

Welcome to the Sellwood Bridge Project Open House!

The Transformation of Portland into a Two-Wheeled Mecca. Mia Birk, Principal, Alta Planning + Design

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

Healthy Built Environments Cowlitz-Wahkiakum County, Washington

Option W: N. Washington Street Project

Board of Supervisors February 27, 2017

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

2112 Behan Road Crystal Lake, IL 60014

20th ANNUAL FINE ARTS & CRAFTS FEST Sept.3,4 (10am-6pm), Sept. 5 (10am-5pm)

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

NJDOT Complete Streets Checklist

CURRENT AND VOTER APPROVED SOUND TRANSIT SERVICE

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

South King County High-Capacity Transit Corridor Study

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

Hillsboro Tanasbourne Town Center

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Streetscape: Core Shopping District

APPENDIX D COST SUMMARY TABLES

Reams Road RCA Study. Board of County Commissioners Public Hearing

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Building sidewalks on local streets to reduce accessibility barriers

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

RENOVATION MASTER PLAN

Walkability Audit Scores and Comments Lacey, Tumwater, and Olympia, WA September 2012

Traffic Signals at Bike Boulevards

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

DISTRICT BICYCLE PROGRAM

Section 7 Complete Green Street Guidelines DRAFT

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Citizen Advisory Committee

Alaskan Way, Promenade, and Overlook Walk Final EIS

Design Guidelines. Overview. Design Vision for Yellow Brick Road

Mandan Commission Meeting August 2, 2016 Mandan City Hall

2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

N. Frederick Street to N. Manchester Street

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Transcription:

West Burnside/Couch Green Streets Portland Office of Transportation Bureau of Environmental Services Lloyd D. Lindley, ASLA Parametrix, Inc. Design Advisory Committee February 20, 2008

Overview I-405 North Park Blocks Washington Park PGE Park Upper Burnside Central Burnside/Couch Lower Burnside Washington Park 100-feet I-405 Willamette River Burnside drops over 100-feet between the west hills and 2 nd Avenue 2

Systems Conveyance Collection Infiltration Disposal D. Elkin D. Elkin Washington Park An interconnected system of conveyance, collection, infiltration and disposal facilities from the west hills to the Willamette River. I-405 Willamette River 3

Burnside/Couch System Northwest Style Native and native-like plants Evergreen trees Expressive of water flow from Washington Park to the Willamette River Washington Park Create a landscape that expresses the Pacific Northwest and Portland s natural areas. Bring the green of Washington Park into the City. Bring the river s edge into the City. I-405 Willamette River 4

Tool Box Daisy chain gutter to planter Infiltration BES Plan of Egg at curb line D. Elkin Gravity fed aeration 5

Tool Box Planter Track drain and conveyance Slope Swale Track drain to swale Swale V W Sidewalk Planter IN OUT Flow IN OUT T. Lipton IN OUT IN OUT Planter Slope Slope Veggie-wing (V W) Planter Tree Planter BES 6

Form Alternatives Curvilinear Implies movement Emulates natural forms Complements human movement Rectilinear Conforms to the rectilinear form of the street grid Creates angular edges Efficiency 7

Form Alternatives Curvilinear Rectilinear Patterns Patterns Edges Edges 8

Concept Alternatives Curvilinear Rectilinear 9

Upper West Burnside NW 24 th Place NW 23 rd W 20 th Place NW 19 th Ave. NW 18 th Ave. NW 16 th Ave. System Plan Direction of flow Washington Park Streetcar Terminus Grass Track NW 23 rd W 20 th Place Water Organ Aeration System Section W 18 th /19 th Fireman s Memorial I-405 10

Upper West Burnside Terminal Station at 24 th Place Burnside Washington Park Exclusive guideway Grass Track Trail Park Road NW 24 th Place Memorial Uptown Shopping Center Surface Parking Stop Washington Park General Section Burnside Grass Track Switzerland D. Elkin Burnside looking south 11

Upper West Burnside Burnside at 23 rd and Vista Stop Planters Surface Parking V W Plan at Burnside and NW 23 rd /Vista Surface Parking Stop Surface Parking V W Surface Parking Typical Section Burnside and NW 23 rd /Vista Veggie-wing on both sides of Burnside 12

Upper West Burnside SW 21 st Avenue Close SW Morrison between SW 21st and SW 20th Place 20 th Place Triangle SW 20 th Place Add 4 on-street parking spaces Provide streetcar stops Preserve surface parking access Morrison 13

Upper West Burnside Watershed area for aeration at the 20 th Place triangle Simple aeration device in the Lloyd District 14

Upper West Burnside Surface Parking 20 th Place Triangle Surface Parking 3-Parking 1-Parking Plan of Triangle at NW 20 th Place and Burnside Typical Section Typical Section at a triangle with gravity fed aeration feature 15

18 th and 19 th at the Fireman s Memorial SW 19 th Ave Upper West Burnside Burnside 4-onstreet parking Plan of 18 th /19 th at the Fireman s Memorial A SW 18 th Ave A The Island Typical partial section A-A at a triangle 16 with gravity fed aeration feature Evergreen trees reflect the Northwest and absorb CO2 year round

Upper West Burnside Fireman s Memorial Typical section A-A of the Island SW Alder The Island W Burnside The watershed for the 18 th /19 th aeration facility Ira Keller fountain The Source for Lovejoy and Ira Keller fountains 17

Upper West Burnside Discussion 18

Central Burnside NW 16 th Ave. NW 15 th Ave. NW 14 th Ave. NW 11 th Ave. NW 10 th Ave. North Park Blocks System Plan Direction of flow I-405 North Park Blocks 15 th / 16 th Triangle Stark Street 10 th Avenue Triangle System Section North Park Block Crossing 19

Central Burnside NW 16th Close Washington between W 16 th and 15th Place 15 th Avenue Triangle SW 15th Burnside Add 5 on-street parking spaces Provide streetcar stop 20

Central Burnside Typical Section at a triangle with gravity fed aeration feature Aeration facility in Seattle Watershed area for aeration at the 15 th Avenue triangle 21

Central Burnside 22

Central Couch 23

Central Couch 8.5-feet Planter Typical Section Egg 24

Central Burnside 10 th and Burnside Triangle 25

Central Burnside 26

Central Burnside Discussion 27

Lower Burnside North Park Blocks NW Broadway NW 6 th Ave. NW 5 th Ave. NW 4 th Ave. NW 3 rd Ave. NW 2 nd Ave. Couch Burnside System Plan Direction of flow North Park Blocks Willamette River Burnside Bridge Park Blocks Crossing Burnside Boulevard 2 nd Avenue System Section 28

Lower Burnside 29

Lower Burnside 30

Lower Couch 8.5-feet Curb extension alternative Typical V W Egg Egg Typical section Typical Curb extension 31

Lower Burnside 32

Lower Burnside Tool Bar 33

Lower Burnside Discussion 34

DISCUSSION & QUESTIONS 35