CERTIFYING GASFITTER

Similar documents
CERTIFYING GASFITTER

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN GASFITTER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

CERTIFYING GASFITTER

CERTIFYING GASFITTER

CRAFTSMAN EXAMINATION, NOVEMBER 2007 GASFITTING ANSWER SCHEDULE

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION MANUAL

About SPK-Rifeng Gas

Installation and maintenance of twin 45kg LPG cylinder systems

ACCESSORY KIT INSTALLATION INSTRUCTIONS

Propane Conversion Kit Instruction

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Propane Conversion Kit Instruction

Propane Conversion Kit Instruction

ACS.CoNGLP1 SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC NATURAL GAS TO LPG GENERIC

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Your safety and the safety of others are very important.

INSTALLATION GUIDE Gas Rangetops

CERTIFYING DRAINLAYER

ACS.CoNGLP1 SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC NATURAL GAS TO LPG GENERIC

Installation Instructions

GAS SUPPLY DESIGN GUIDE

Copper vs Stainless Steel. Test Results Show Impact on Performance and Costs

ACCESSORY KIT INSTALLATION INSTRUCTIONS

STS 650 PRESSURE EQUIPMENT

G96 Series BASOTROL Dual Operator Valve

REGISTRATION EXAMINATION, NOVEMBER 2015 LICENSED PLUMBER ANSWER SCHEDULE

USER S INFORMATION MANUAL

Summary of the MRA LPG Codes of Practice

REGISTRATION EXAMINATION, JUNE 2015 CERTIFYING PLUMBER ANSWER SCHEDULE

ACCESSORY KIT INSTALLATION INSTRUCTIONS PROPANE CONVERSION - INDUCED COMBUSTION FURNACES 1NP0347

System Pressure Manager Standard & System Pressure Manager Plus

Natural Gas High-Altitude Conversion Kit For Installations in the United States (2,001 10,000 Feet)

ACCESSORY KIT INSTALLATION INSTRUCTIONS PROPANE CONVERSION - INDUCED COMBUSTION FURNACES 1NP0347

Dual Solenoid Gas Valve Installation

Gas Furnaces 95AF2V. Warranty Heat Exchanger - 20 Year Limited Parts - 5 Year Limited

ARCHIVED. Compliance Document for New Zealand Building Code Clause G11 Gas as an Energy Source. Prepared by the Department of Building and Housing

About. providing superior performance and reliability. Bromic regulators are AGA or UL144 approved.

6. Features & Benefits Installation Considerations Jointing Instructions Pipe Sizing Calculations & Tables

/2004 US/CA

WARNING: Gas Conversion Kit Instructions Applies to: Model UDAP, UDAS, UDBP, and UDBS Unit Heaters. General and Warnings FOR YOUR SAFETY

The conversion of new certified central heating gas appliances must conform to directions outlined in this instruction.

Using propane cylinders safely

AutoChanger Installation & User Guide Issue 2

GAS SUPPLY APPLICATION GUIDE

ENERGY BLADE 3K4. Energy Blade Installation Instructions

Gas Furnaces 95AF. Warranty Heat Exchanger - 20 Year Limited Parts - 5 Year Limited. 95% AFUE 44,000 to 110,000 Btuh Input 2 to 5 Tons Add-On Cooling

GM Series Dual-Block Multi-Function Gas Control Valves

GM-7000 Series CE Approved Gas Control Valve

BGA158 Series CE Approved Class A Shutoff Gas Valve

Natural Gas to L.P. Gas Conversion Kit

BGA158 Series CE Approved Class B Shutoff Gas Valve

High-Pressure Boiler Inspection Procedures: A Complete Checklist

WARNING: Installation Instructions. Natural Gas High Altitude Conversion Kit United States Installations Only

Installation, operating and maintenance Instructions for Seemag bypass level indicator

If you want to offer a more professional look to your

WARNING: FOR OUTDOOR USE ONLY

Natural Gas to L.P. Gas Conversion Kit

mass of container full of air = g mass of container with extra air = g volume of air released = cm 3

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

SIZING AND CAPACITIES OF GAS PIPING

Residential and Small Commercial

ACS.TPCP1 SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS; LPG; OTHER GASES TESTING AND PURGING

Bottled Gas. Using LPG safely. for the way you want to live

The Duopex Gas. to make every job quick and easy. it provides a revolutionary alternative for the professional plumber and 02_DUOPEX GAS GAS MANUAL

ISO INTERNATIONAL STANDARD. Small craft Liquefied petroleum gas (LPG) systems

REGISTRATION EXAMINATION, JUNE 2017 CERTIFYING PLUMBER ANSWER SCHEDULE

Module 6. Tightness Testing

Oxford Instruments Plasma Technology. PlasmaPro NGP80. Installation Data Sheet. Original Instructions.

Check with local zoning official for property line distance requirements.

INSTALLATION INSTRUCTIONS

Level 2 Physics, 2012

Gas Fired Residential Heating Boilers

SIZING AND CAPACITIES OF GAS PIPING Reserved

BGA158, BGA171 and BGA110 Series Shutoff Gas Valve

Installation, commissioning and servicing instructions

KC Series Gas Components and Supply Design Guide

A B isothermal compression at a temperature of 300 K. The work done on the air is 104 J.

Distribution Connection Forms

Installation Instructions For Natural Gas Conversion

GAS KITS & ACCESSORIES 504,986M 11/2004 HIGH ALTITUDE KIT

Level 1 Economics, 2018

Liquid Gas Cylinder (LGC)

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

SIZING AND CAPACITIES OF GAS PIPING

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1*

GasBloc Multifunctional gas control Combined regulator and safety shut-off valves single-stage atmospheric operating mode GB-(LEP) 057 D01

Old documentation - Only for your information! Product is not available any more!

Overview EUSDSG3.6. Gas tightness testing and direct purging

Gas Safety Code of Practice

Field Certification Certificate of Compliance

GAS CONVERSION KIT Installation Instructions Range/Rangetop

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

OCTOBER 2017 ISSUE Page 1 of 7

Cover Page for Lab Report Group Portion. Head Losses in Pipes

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 5 Utilities Gas Emergencies Revised

AUTOMATIC GAS MANIFOLDS

Overview EUSSAM12. Carry out tightness testing and direct purging of gas installations

Transcription:

Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9196 REGISTRATION EXAMINATION, JUNE 2016 CERTIFYING GASFITTER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed THREE hours Check that the Candidate Code Number on your admission slip is the same as the number on the label at the top of this page. Do not start writing until you are told to do so by the Supervisor. Total marks for this examination: 100. The pass mark for this examination is 60 marks. Write your answers and draw your sketches in this booklet. If you need more paper, use pages 18 21 at the back of this booklet. Clearly write the question number(s) if any of these pages are used. All working in calculations must be shown. Candidates are permitted to use the following in this examination: Drawing instruments, approved calculators, document(s) provided. Publications, Acts, Regulations, Codes of Practice, or Standards other than the ones provided are NOT permitted in the examination room. Check that this booklet has all of 21 pages in the correct order and that none of these pages is blank. YOU MUST HAND THIS BOOKLET TO THE SUPERVISOR AT THE END OF THE EXAMINATION Plumbers, Gasfitters and Drainlayers Board, 2016. All rights reserved. No part of this publication may be reproduced by any means without the prior permission of the Plumbers, Gasfitters and Drainlayers Board.

Candidates that sat this examination in June 2016 were provided with the following documents: AS/NZS 5601 Part 1: General installations AS/NZS 5601 Part 2: LP Gas installations in caravans and boats for non-propulsive purposes

USEFUL FORMULAE Circumference of circle = 2 R or Circumference of circle = D Area of circle = R 2 or Area of circle = 0.7854 D 2 Volume of cylinder = R 2 H or Volume of cylinder = 0.7854 D 2 H Heating time = mass of water (kg) 4.2 temp diff (ºC) 100 heat energy input per hour in kj efficiency (%) Correction factor = atmospheric pressure + supply pressure atmospheric pressure Gas rate (m 3 /h) = volume (m 3 ) 3600 time (seconds)

SECTION A QUESTION 1 (a) Give FOUR reasons why spillage from a gas appliance may occur. 1 2 3 4 (4 marks) (b) A fault has developed on a gas-fired, electronic continuous-flow water heater. When the water tap is turned on, the appliance starts and the gas ignites, but the appliance shuts down after a few seconds. An error code is displayed which indicates failed ignition. Give FOUR reasons for this fault to occur. 1 2 3 4 (4 marks) (c) A line of soot has appeared on the front of a radiant/convector gas heater installed in an existing fire place. Give FOUR likely reasons this may have occurred. 1 2 3 4 (4 marks) Total 12 marks Certifying Gasfitter 9196, June 2016 1

QUESTION 2 The diagram on the page opposite shows the pipework and appliances for a gas installation in a hostel. Installation Details are as follows: Natural gas Copper pipe (NZS 3501) The installation supply pressure is 2.75 kpa. Use the Pipe Sizing Tables (not the graphs) from AS/NZS 5601 Part 1 to complete the table below. Pipe Section Length (m) Main Run (m) Gas Flow (MJ/h) Nominal Size A B 1.5 B C 5 C D 1.5 D E 1 B F 4.2 F G 4.5 G H 0.5 F I 4.4 I J 2.6 J K 1.2 J L 5.3 I M 8.7 Total 19 marks Certifying Gasfitter 9196, June 2016 2

QUESTION 2 (cont d) Central Heating Furnace 124 MJ/h M Spa Heater 220 MJ/h L K Spa Heater 220 MJ/h I J Hob 38 MJ/h Water Heater 188 MJ/h Water Heater 188 MJ/h E D Hob 38 MJ/h C Cooker 44 MJ/h F G H B Meter A Certifying Gasfitter 9196, June 2016 3

QUESTION 3 (a) Two 45 kg exchange cylinders are to be installed on the outside wall of a house. The customer has requested the cylinders be located below an openable window. Referring to AS/NZS 5601 Part 1, state the minimum clearance below the window required for the cylinder valves. (1 mark) (b) AS/NZS 5601 Part 1, lists clearances required from LPG cylinders to openings, drains and doorways. Name another hazard that LPG cylinders must have clearances from. (1 mark) (c) A changeover regulator which has a 20 mm vent terminal is to be installed on the wall between the two cylinders. (i) Referring to AS/NZS 5601 Part 1, state the minimum clearance below the window required for the vent terminal. (1 mark) (ii) If the clearance in (c) (i) cannot be achieved, give a solution that does not include changing the regulator or altering the window. (1 mark) Certifying Gasfitter 9196, June 2016 4

QUESTION 3 (cont d) (d) (i) Explain why an auto-changeover regulator may switch to the reserve cylinder, while the primary cylinder is still half full. (ii) Give TWO options that can reduce the chance of the situation in (d)(i) happening. 1 2 (3 marks) (e) State the conditions under which a site Location Certificate is required for LPG. (2 marks) Total 9 marks Certifying Gasfitter 9196, June 2016 5

QUESTION 4 (a) List THREE approved Codes of Practice relevant to gasfitting. 1 2 3 (3 marks) (b) Explain the purpose of Approved Codes of Practice. (1 mark) (c) State why following the recommendations of Approved Codes of Practice is beneficial if an incident were to occur. (1 mark) Total 5 marks Certifying Gasfitter 9196, June 2016 6

QUESTION 5 The diagram below shows the layout of the gas installation in a multi-unit dwelling. The pipe material is cross-linked polyethylene. The distance between the meter and the fire is 12.3 m. Cooker Fire Dryer Water heater Meter (a) On the diagram, show the locations where reversion fittings are required. (2 marks) (b) State the purpose of the reversion fittings. (1 mark) (c) Describe TWO acceptable reversion fittings suitable for the installation in (a). 1 2 (2 marks) (d) State the special requirement that must be met with regard to identification of the pipe in the installation. (2 marks) Total 7 marks Certifying Gasfitter 9196, June 2016 7

QUESTION 6 The diagram below shows a combined natural draught flue in a low heat loss situation in a two storied building. X F 1.5 m E 150 mm spigot 1 m 3.1 m D 200 MJ/h 2.5 m 900 mm 900 mm 900 mm 200 mm spigot A 125 mm spigot B 125 mm spigot C 320 MJ/h 100 MJ/h 100 MJ/h Complete the table below according to AS/NZS 5601 Part 1. Minimum length X Minimum Diameter of A Minimum Diameter of B Minimum Diameter of C Minimum Diameter of D Minimum Diameter of E Minimum Diameter of F Total 9 marks Certifying Gasfitter 9196, June 2016 8

QUESTION 7 (a) Fall arrest harnesses need to be treated carefully to ensure that they last. Give FOUR factors that can shorten the life of fall arrest harnesses. 1 2 3 4 (2 marks) (b) List THREE types of equipment, other than fall arrest harnesses, that are designed to protect people working at heights. 1 2 3 (3 marks) Total 5 marks Certifying Gasfitter 9196, June 2016 9

QUESTION 8 Notifiable work is to be carried out. (a) Name the organisation that must be notified of this. (1 mark) (b) State how long before work commences a notification form must be received by the organisation in (a). (1 mark) (c) Give a situation where notifiable work may be performed prior to sending the notification form. (1 mark) (d) List FIVE types of construction work that are defined as notifiable work. 1 2 3 4 5 (5 marks) Total 8 marks Certifying Gasfitter 9196, June 2016 10

QUESTION 9 (a) A natural gas appliance has an energy input of 78,000 BTU. Calculate the gas rate in m 3 /h for the appliance. The heating value of natural gas is 42 MJ/m 3. (3 marks) (b) The operating pressure in the installation in (a) is 10 kpa. Calculate the corrected volume of gas that is flowing through this meter at this pressure. (3 marks) Total 6 marks Certifying Gasfitter 9196, June 2016 11

QUESTION 10 5 m of 150 mm ID consumer gas piping is to be isolated for hot work to be carried out. State what is recommended good practice for completing the hot work once the section has been fully isolated from the existing gas supply. Total 2 marks Certifying Gasfitter 9196, June 2016 12

QUESTION 11 The Gas (Safety and Measurement) Regulations define three categories of gasfitting work. (a) Name the THREE categories. 1 2 3 (3 marks) (b) Name the category of gasfitting work that requires details of the installation to be entered into an on-line data base. (1 mark) (c) Name the government agency that manages the on-line data base in (b). (1 mark) Total 5 marks Certifying Gasfitter 9196, June 2016 13

QUESTION 12 A 100 mm galvanised gas dryer vent is being installed, and is to penetrate the external wall of a wooden framed house with brick cladding. List the steps required to ensure that the penetration is weather tight. Total 3 marks Certifying Gasfitter 9196, June 2016 14

SECTION B Answer the following multiple-choice questions by writing your answer (A, B, C, D or E) in the box provided after each one of the questions. Each correct answer in this section of the examination is worth 1 mark. Should your choice of answer be unclear no mark will be awarded. 1. The alarm and solenoid used on a gas detection system installed in a boat must activate when the concentration of LPG in air exceeds what percentage of the lower explosive limit? A 2% B 5% C 11% D 15% E 25% 2. AS/NZS 5601 Part 2 is used to determine the sizing of gas pipe to be used in a boat. What fitting allowance has been included in the design of the graphs and tables to allow for diameter, pressure drop and roughness of the pipe and fittings? A 10% B 20% C 25% D 50% E 60% 3. According to AS/NZS 5601 Part 2, a flue constructed of stainless steel 300 and 430 Series Grade can convey combustion products up to what maximum temperature? A B C D E 200 C. 300 C. 430 C. 450 C. 500 C. Certifying Gasfitter 9196, June 2016 15

4. What is the minimum allowable diameter of a drain fitted in the base of an LPG cylinder compartment on a boat? A 10 mm. B. 15 mm. C D E 19 mm. 20 mm. 25 mm. 5. What performance standard should be referred to with regard to seismic considerations when gas pipe support systems are being designed? A AS/NZS 1477. B AS/NZS 3500. C NZS 3501. D NZS 4219. E BS 3799. 6. According to AS/NZS 5601 Part 1, if the maximum over-pressure is not indicated on an individual component used in a gas installation and the rated working pressure is known to be 2 kpa, which of the following would be used as the maximum over-pressure for the installation? A B C D E 2 kpa. 2.5 kpa. 3 kpa. 7 kpa. 14 kpa. 7. According to AS/NZS 5601 Part 1, what is the maximum spacing of supporting devices for a 25 mm diameter multi-layer gas pipe that is installed vertically in a building? A 1 m. B 1.5 m. C 2 m. D 2.5 m. E 3 m. Certifying Gasfitter 9196, June 2016 16

8. A gas appliance is installed under a floor and is located over 2 m from the access opening. What is the minimum allowable clearance between the lowest part of the floor structure and the ground from the access opening to the appliance? A B C D E 600 mm. 800 mm. 1000 mm. 1200 mm. 1500 mm. 9. According to AS/NZS 5601 Part 1, above what incoming operating pressure is over-pressure protection required on a natural gas installation? A B C D E 7 kpa. 10 kpa. 14 kpa. 15 kpa. 30 kpa. 10. According to AS/NZS 5601 Part 1, what is the maximum size notch or hole permitted where a notch or hole is cut into a 75 mm wide timber stud? A B C D E 19 mm. 25 mm. 30 mm. 32 mm. 40 mm. Total 10 marks Certifying Gasfitter 9196, June 2016 17

This page is available for additional working or answers Question number Certifying Gasfitter 9196, June 2016 18

This page is available for additional working or answers Question number Certifying Gasfitter 9196, June 2016 19

This page is available for additional working or answers Question number Certifying Gasfitter 9196, June 2016 20

This page is available for additional working or answers Question number Certifying Gasfitter 9196, June 2016 21

For Examiner s use only Question number Marks Marks 1 2 3 4 5 6 7 8 9 10 11 12 Section B Total