Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Similar documents
Geary Corridor Bus Rapid Transit

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Geary Bus Rapid Transit Project

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Pedestrian and Bicycle Conditions

Geary Corridor Bus Rapid Transit: Staff-Recommended Alternative

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

3.5 Pedestrian and Bicycle Transportation

Geary Bus Rapid Transit Project

Vision Zero Priority Projects (March 2017)

Polk Streetscape Project

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

MUNI FORWARD Proposed Changes: Stanyan

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Better Market Street Project Update. Urban Forestry Council September 17, 2014

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

GEARY BRT SIMULATION VISSIM Calibration and Existing Conditions Results

Central Freeway and Octavia Circulation Study

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report

SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

The Wiggle Route in Context

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAFE ROUTES TO SCHOOL (SR2S)

May 20, 2016 PUBLIC HEARING RESULTS

BICYCLE STRATEGY UPDATE

Bicycle Strategy Capital Projects Polk Street Northbound Separated Bikeway 481, ,

District 6 & Citywide Non-Transit Project Delivery Status Report

VISION ZERO SF: ELIMINATING TRAFFIC DEATHS BY 2024 JANUARY 5, 2017

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

LAUREL HEIGHTS/JORDAN PARK TRAFFIC CALMING PROJECT DECEMBER 2012

Better Market Street Project. Project Update January 15, 2015

Freeway ramp intersection study

WORKSHOP 2 SUMMARY OVERVIEW GENERAL COMMENTS. Walking and Biking. Greening & Stormwater. Transportation & Parking. Lighting, Art and Identity

Memorandum. M:\Board\Board Meetings\2015\Memos\09 Sep\BRT Reports\Geary Report\Geary BRT Sep2015 Board Update

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

SFMTA PROJECT TIMELINE

Station 1: Street & Sidewalk Upgrades

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Welcome to the Quebec Alternatives Analysis Public Meeting

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

Tonight is for you. Learn everything you can. Share all your ideas.

ABOUT MUNI FORWARD. Muni Forward is the SFMTA s initiative to make transit safer and more reliable.

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

San Francisco 2009 Collisions Report April 21, 2011

Bicycle Facilities Planning

ALTERNATIVES SCREENING REPORT

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

San Francisco Pedestrian Safety Capital Improvement Program: A Step Towards Vision Zero

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

KEARNY MESA COMMUNITY PLAN UPDATE

Market/Octavia - Transportation Projects Update

ORDER NUMBER SPECIAL EVENTS REMEMBER: SERVICE IS OUR ONLY BUSINESS

Arterial Transitway Corridors Study. Ave

2019 Prop K 5-Year Prioritization Program Update Prop K Project Ideas - Public Survey Results

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Van Ness Avenue Bus Rapid Transit (BRT) San Francisco Environment Commission Policy Committee

ROADWORK AND INFRASTRUCTURE OVERSIGHT

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

122 Avenue: 107 Street to Fort Road

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Road Diets FDOT Process

42nd Ave N Reconstruction

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

FEEDBACK SURVEY #2: WHO PARTICIPATED

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Data Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. SFMTA Board of

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Technical Working Group November 15, 2017

CURBSIDE ACTIVITY DESIGN

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

WELCOME WIGGLE NEIGHBORHOOD GREEN CORRIDOR COMMUNITY OPEN HOUSE

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Welcome. If you have any questions or comments on the project, please contact:

RED COLORED TRANSIT-ONLY LANES REQUEST TO EXPERIMENT

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

LOMBARD STREET SAFETY PROJECT FREQUENTLY ASKED QUESTIONS (FAQ) 1. How did you determine what treatments to include in the project proposals?

TELEGRAPH AVENUE COMPLETE STREETS PLAN DRAFT FINAL PLAN

Ocean Park Boulevard Green Street Project Community Workshop

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Transcription:

Welcome! Thank you for joining us today for a Geary Rapid project open house. Get the most out of this event: 1. Sign in and get your feedback sheet 2. Visit project information stations hosted by project staff who will answer your questions 3. Turn in your feedback sheet before you leave Event goals: Share SFMTA s detailed designs for the Geary corridor from Market to Stanyan streets with you Get your feedback on the project and its designs before the project is considered for approval by the SFMTA Board Listen to and acknowledge your preferences and concerns Provide feedback on how public input has influenced the project s design and its implementation

Park Presidio Blvd 25th Ave Geary Rapid Project Geary Rapid Project Geary Boulevard Improvement Project Lombard Street Van Ness Ave Divisadero St 34th Ave Arguello Blvd Stanyan Masonic A Geary Blvd O Farrell St Market St The Future of Geary Plans for Geary Bus Rapid Transit, a civic improvement project aimed at improving reliability, reducing travel times for Muni customers and increasing safety for people traveling along the corridor, have been studied and approved for final design. These changes are scheduled to be designed and built in two projects: first Geary Rapid, and then Geary Boulevard Improvement Project. The goal of this Open House is to get your feedback on the Geary Rapid project and its detailed designs before it is considered for implementation approval by the SFMTA Board. Geary Rapid Project: Finalizing design, construction scheduled Fall 2018 Would extend existing side-running dedicated transit lanes on Geary westward to Stanyan Street Geary Boulevard Improvement Project: Beginning detailed design, construction scheduled Fall 2020 Would extend dedicated bus-only lanes on Geary between 34th Avenue and Stanyan Street, including center-running transit lanes between Arguello Boulevard and 28th Avenue Improvements planned for both projects include: Changes to some bus stop locations to reduce travel times and improve reliability Safety improvements for people traveling Utility upgrades and repaving coordinated with other City agencies

Public Outreach Overview For each phase of the Geary Rapid Project, a public participation goal is defined to guide the project team s outreach in that phase, depending on goals, schedules, resources and levels of concern. 2017 2018 2019 2020 SFCTA Board Project Approval SFMTA Board Project Approval Parking and Traffic Changes Hearing Environmental Review Detail Design Substantial Completion Implementation Design Outreach: Consulting with the Public Implementation Outreach: Informing the Public Design-phase Outreach Inform community of project design concept approved during environmental review phase Detailed curb space proposals for neighbor input Draft final detail design for final input Parking and traffic change hearings and decision Implementation-phase Outreach Inform community of: Project design approved for construction Planned construction schedule and details Construction progress and updates

You Speak, We Listen The current Geary Rapid project proposal reflects numerous design changes in response to community input. From bigger changes, like the retention of the Webster bridge and the Laguna Rapid bus stops, to smaller adjustments to passenger and commercial loading zone locations, we have continued to refine our design in response to community needs. Retention of 38R Geary Rapid bus stops at Laguna Street Retention of 38 Geary bus stops at Collins Street Changing the 38R Geary Rapid bus stops at Spruce Street into 38 Geary bus stops to preserve on-street parking Modifications to passenger and commercial loading zone locations in response to feedback collected via a door-to-door merchant survey Retention of the Webster Street pedestrian bridge Addition of more pedestrian bulbs to further improve safety for people walking

! CURRENT CONDITIONS IDEAL CONDITIONS Transit Reliability Recent improvements have helped service reliability, like more rush hour service and red transit-only lanes downtown. Yet, crowded buses and uneven wait times are still a daily reality on the 38 Geary and 38R Geary Rapid. Today, daily 38 Geary customers are delayed an average of five minutes twice weekly, and daily 38R Geary Rapid customers are delayed an average of five minutes once a week, cumulatively costing Proposed reliability improvements: Red, dedicated transit lanes to reduce unpredictable delays Transit bulbs to decrease bus delays by allowing buses to remain in the travel lane when passengers load and unload Bus stop changes to improve efficiency Upgraded Transit Signal Priority to increase the likelihood buses get the green light at intersections customers 4,500 hours per week, when they could instead be spending this time with family and friends, stopping for a coffee or running an errand.

1 YEAR! GEARY 26 pedestrians injured on Geary annually YOU ARE 8x than more likely to be involved in a collision on Geary the average city street. Safety Geary is a high-injury corridor. In five years, 132 pedestrians were injured by vehicles between Market and Stanyan streets. Of these, three people died. It s time for a change. Proposed safety improvements: Pedestrian bulbs at intersections shorten crossing distances, make people walking more visible to motorists and reduce vehicle turning speeds Enhanced medians provide a safe refuge for people walking to rest in the middle of the street, if needed Calming the Geary Expressway by decreasing the number of travel lanes from four to two general-purpose lanes and one bus-only lane in each direction Pedestrian countdown signals let people walking know how much time they have to safely cross the street Accessible pedestrian signals and curb ramps allow people with disabilities to safely travel on the corridor New crosswalks provide safe opportunities for people to get across Geary

Proposed Improvements Put your stars next to your favorite proposed improvements. 1 Red dedicated transit lanes to improve service by reducing unpredictable delays like traffic congestion and double parking 2 Bus stop changes to improve efficiency, including relocating and removing bus stops 3 Upgraded transit signal priority system to make green lights more likely for buses 4 New transit bulbs to decrease bus delays by allowing buses to remain in the travel lane when passengers load and unload. These bulbs will also provide more space, making waiting for the bus more comfortable 5 New pedestrian bulbs to increase safety by shortening intersection crossing distances, improving motorist visibility of people walking and reducing motor vehicle turning speeds. Improved accessibility for people with disabilities, including new and upgraded curb ramps and accessible pedestrian signals 6 Green-backed sharrows on some cross streets to help guide people bicycling across Geary

Geary Rapid Project 3 8 7 2 4 9 10 1 5 6 Proposed Improvements Infographic studies

Proposed Improvements Put your stars next to your favorite proposed improvements. 7 Pedestrian countdown signals to let people walking know how much time they have to safely cross the street 8 Upgraded bus stops, including more visible and easy to read bus stop signs, real-time information, bike racks and trash bins 9 Daylighting every intersection to increase the visibility of pedestrians crossing the street by removing or limiting on-street parking spaces at intersection corners 10 Enhanced medians to provide a safer place for people walking to wait, if needed Calming the expressway on Geary from Scott to Gough to improve safety and circulation there by decreasing the number of travel lanes from four to two general-purpose lanes plus one bus-only lane in each direction Removing the Steiner bridge and improving the safety and visibility of the ADA-compliant surface-level crosswalks and medians to improve accessibility and safety for people walking

Comments Overall how satisfied are you with the proposed improvements Do you have specific comments to share about these proposed changes Post your comments here.

Kearny Stockton Grant Powell Leavenworth Mason Shannon Taylor Jones Hyde Van Ness Larkin Steiner Laguna Franklin Gough Peter Yorke Way Polk Geary O Farrell Cyril Magnin Geary Blvd Fillmore Webster Masonic Presidio Lyon Baker Broderick Divisadero Scott Pierce Cleary Starr King Way Blake Emerson Cook Woods Collins Arguello Palm Jordan Stanyan Commonwealth Beaumont Parker Spruce Currently a Rapid & Local stop. Proposal is to make Local only. St. Joseph s Bus Stop Changes After extensive public feedback, final changes to bus stops on Geary are being considered to improve the speed, reliability and convenience of your trip on the 38 Geary and 38R Geary Rapid. We are now seeking your feedback on these changes before they are considered for approval. Proposed changes: Moving bus stops from the nearside of intersections to the farside, so buses don t get stopped at red lights as often Removing or consolidating closely-spaced stops to improve travel time reliability while maintaining access Placing stops close to major activity generators and in visible, comfortable locations! Legend Stop unchanged Proposed for elimination Proposed 38 Geary stop Proposed 38R Geary Rapid stop Proposed for relocation 38 Geary buses stop at all 38 and 38R stops. 38R Geary Rapid buses only stop at 38R stops.

Comments Overall how satisfied are you with the proposed bus stop changes Very satisfied Very dissatisfied Do you have specific comments to share about these proposed bus stop changes Post your comments here.