APPENDIX L DETAILED ANALYSIS OF EAST AND LATERAL RUNWAY SAFETY AREA ALTERNATIVES ON TIDAL CHANNEL GEOMORPHOLOGY

Similar documents
Restoration of the Nisqually River Delta and increased rearing opportunities for salmonids

APPENDIX J HYDROLOGY AND WATER QUALITY

Request Number IR1-12: Flow Passage. Information Request

The Blue Heron Slough Conservation Bank

Plan B Dam Breach Assessment

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA,

CALCASIEU SALINITY STRUCTURES. HYDRODYNAMIC MODELING (To Support Design of Salinity Barriers)

Figure 4, Photo mosaic taken on February 14 about an hour before sunset near low tide.

RESILIENCE THROUGH RESTORATION

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

X.B WETLANDS ROGUE RIVER ESTUARY

APPENDIX C. Fluvial and Tidal Hydraulics Report

Packwood Hydroelectric Project Barrier Analysis December 12, 2006

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

FACT SHEET MCGREGOR LAKE RESTORATION HABITAT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN ENVIRONMENTAL MANAGEMENT PROGRAM

Technical Report Culvert A Hydraulic Analysis

Hydraulic Modeling Analysis

Tide Gate Modifications for Fish Passage and Water Quality Enhancement

LOCAL COASTAL PROGRAM UPDATE

APPENDIX D-2. Sea Level Rise Technical Memo

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

Study Update Tailrace Slough Use by Anadromous Salmonids

Little Spokane River Stream Gage Report: Deadman Creek, Dragoon Creek, and the West Branch of the Little Spokane River

Corte Madera Creek Flood Control Channel

Union Pacific Railroad

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

HABITAT RESTORATION USING DREDGED MATERIAL PLACEMENT

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT

STUDY REPORT W&AR-03 RESERVOIR TEMPERATURE MODEL ATTACHMENT B DON PEDRO RESERVOIR BATHYMETRIC STUDY REPORT

Eelgrass Survey PARADISE CAY BELVEDERE, MARIN COUNTY CALIFORNIA. Prepared For:

Impact of Dredging the Lower Narrow River on Circulation and Flushing

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

Feasibility Study for Restoration of Titlow Lagoon Fish Passage. South Puget Sound Salmon Enhancement Group

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL

State of San Francisco Bay 2011 Appendix O Steelhead Trout Production as an Indicator of Watershed Health

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

Juneau Douglas Harbor

Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River,

Illinois State Water Survey

The Oregon Coast Education Program. Concepts to Teach: Tidal cycles, interconnectedness and balance

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Information for File # SEW

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed. December The Cadmus Group, Inc.

U.S. Army Engineer Institute for Water Resources

FACT SHEET I. LOCATION

Salmon Run G.C. Hole 3: Tributary & Wetland Restoration

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

LONE TREE POCKET ESTUARY RESTORATION 2004 FISH SAMPLING AND PRE-RESTORATION PROJECT MONITORING REPORT

The Impact on Great South Bay of the Breach at Old Inlet Charles N. Flagg School of Marine and Atmospheric Sciences, Stony Brook University

Eelgrass Survey Reporting Form 2222 Channel Road Newport Beach, CA Eelgrass (Zostera marina) Survey

Annex E Bridge Pier Protection Plan

STREAM SURVEY File form No..

What happens to Oregon s tidal wetlands with sea level rise?

Information for File #MVP MVM

The Cumulative Impacts of Shoreline Armoring on Forage Fish Spawning Habitat in San Juan County, Washington

Appendix E Cat Island Borrow Area Analysis

Sub-watershed Summaries

Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A Task 400

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California

Bathymetry Data Collection for Subaqueous Soil Mapping. Maggie Payne 2 nd National Workshop on Subaqueous Soils Rhode Island August 9-12, 2010

TOP:001.3 U.S. Fish and Wildlife Service TECHNICAL OPERATING PROCEDURE

SUMMARY OF MOVEMENT AND HABITAT USED BY TAGGED BROOK TROUT IN THE MAIN BRANCH AND NORTH BRANCH AU SABLE RIVER DURING SUMMER Data Submitted to:

San Lorenzo Valley Water District, Watershed Management Plan, Final Version Part I: Existing Conditions Report

Water Resources Report RKLD Annual Meeting July 30, 2016

Oregon Estuaries defined: (Goal 16)

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Freshwater Fish Assessment

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

UPPER BEACH REPLENISHMENT PROJECT RELATED

Outlet Structures T-12

APPENDIX D W-19 FLUVIAL AND TIDAL HYDRAULIC, SEDIMENTATION, WATER QUALITY AND SEA LEVEL RISE MODELING STUDIES

CLAM PASS RESTORATION AND MANAGEMENT PLAN BATHYMETRIC MONITORING REPORT NO. 7 Including Interior Bay Dredge Cuts and Tidal Data

A THESIS M.S. CIVIL ENGINEERING UNIVERSITY OF ALASKA ANCHORAGE ALEXANDRA WEST JEFFERIES, P.E.

JUNEAU SECOND CHANNEL CROSSING WATERWAY USER SURVEY RESULTS

HEC-RAS Two-Dimensional Modeling: Lake Wausau, Wisconsin River and Tributaries Big Rib River and Eau Claire River January 2018

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA

CLAM PASS ANNUAL RESTORATION & MANAGEMENT PLAN TIDAL ANALYSIS ELEMENT REPORT NO. 13

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

Mouth of the Columbia River Jetties Three-Phase Construction Plan

Fremont Weir Fish Passage Proof of Concept. Final Engineering Report

Conservation and Restoration Florida s Coastal Marshes: An Overview of MESS. Jeff Beal, Kent Smith, Erin McDevitt, Maria Merrill

Figure 1. Schematic illustration of the major environments on Mustang Island.

Searsville Dam Removal

Examples of estuaries include bays, sounds, salt marshes, mangrove forests, mud flats, swamps, inlets, and sloughs.

Discussion on the Selection of the Recommended Fish Passage Design Discharge

Skagit River Historical Flood Elevations and Peak Flow Estimates

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

Incorporating Geomorphic Processes and Sediment Dynamics into Salmonid Habitat Restoration Design

Design Report for Janes Creek Roughened Channel

Hydraulic Modeling of Stream Enhancement Methods

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Response of a Newly Created Marsh-Wetland Affected by Tidal Forcing, Upland Discharge, and Groundwater Interaction

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

Transcription:

APPENDIX L DETAILED ANALYSIS OF EAST AND LATERAL RUNWAY SAFETY AREA ALTERNATIVES ON TIDAL CHANNEL GEOMORPHOLOGY

MEMORANDUM TO: Sheri Ellis (SWCA), Patti Sullivan (FAA), Allan Heese (JNU), Randy Vigil (ACOE), Chris Meade (EPA), K Koski (NOAA), Sue Walker (NMFS), Richard Enriquez (USFWS), Carl Schrader (ADNR), Jackie Timothy (ADNR), Tom Schumacher (ADF&G), Teri Camry (CBJ) FROM: Maureen Raad and Paul Agrimis DATE: April 6, 2006 SUBJECT: Further Analysis of the Potential Affects of the East and Lateral Runway Safety Area Alternatives on Tidal Channel Geomorphology Abbreviations AST Alaska Standard Time cfs cubic feet per second DEIS Draft Environmental Impact Statement fps feet per second ft-mllw elevation referenced to mean lower low water vertical datum ft-msl elevation referenced to mean sea level vertical datum GPS Global Positioning System lbs/sq-ft pounds per square foot MHHW Mean Higher High Water MLLW Mean Lower Low Water MSL Mean Sea Level RSA Runway Safety Area VAI Vigil-Agrimis, Inc. WH Wildlife Hazard Introduction Vigil-Agrimis Inc. (VAI) performed additional analysis on the slough system at the east end of Juneau International Airport (JNU) to better predict the effects that proposed filling of tidal channels and marshplain would have on the geomorphology of the local estuary system. The estuary geomorphology is of interest in the EIS because salmonids use these areas during their life cycles. Filling tidal channels and marshplain is being proposed to mitigate for the existing deficit in the Runway Safety Area (RSA). Five RSA alternatives are proposed in the DEIS RSA 1, RSA 5C, RSA 6A, RSA 6B and RSA 6C. All of the RSA alternatives propose fill to the south for the Lateral RSA and fill to the east for the East RSA. RSA 5C proposes the greatest fill volume extending the farthest into the marsh. RSA 1 and RSA 6C are in the middle in terms of both fill and extent. RSA 6A and RSA 6B propose the least fill volume extending the shortest distance into the marsh. All of the alternatives, therefore, merit additional analysis of their potential impacts. For the purpose of this memo, RSA 5C is used in the figures as it best communicates the ways in which fill and eastward extent affect the flow of water in the marsh. The three basic configurations are compared in the Analysis section of this document. The geomorphology of an estuary system is related to the volume of water exchanged though tidal channels as a result of the change in water-surface elevations due to tides. Tidal elevations range about 24 feet in the JNU vicinity with mean higher high water (MHHW) at 11 ft-msl and mean lower low water (MLLW) at -13 ft-msl. Tides ebb and flow twice a day and tidal elevations vary both daily and seasonally. This variability combined with the relatively flat topography found on marshplains makes predicting the flow within a given channel system difficult. To address the uncertainty VAI staff performed additional analysis including: Establishing the order and channel classification for major channels in the East Runway Slough system, Developing channel profiles using HDR/Carson-Dorn survey data, Making flow measurements in key channels to establish likely flow distribution. L-2 Page 1

Channel Order and Channel Classification The channel system in the east runway vicinity caries tidal flows as well as riverine flows as shown in Figure 1. The riverine channels nearly always have some flow. These include Miller-Honsinger Slough and Dredge Slough that begin at tide gates on Miller-Honsinger Pond, and Jordan Creek. The remaining channels are tidal. Depending on their depth they can be permanently inundated or can drain completely at times. Many, including Sunny Slough and East Runway Slough, are periodically connected at high tides. Channel order in tidal systems has been related to marsh size and the volume of water exchanged in a tidal cycle. For example, four ten-acre marshes might each support a third order system while one forty-acre marsh might support a fourth order system (Coats et al, 1995). The channels that drain the east runway area of the refuge were assigned drainage orders using the 2001 infrared aerial photography (Figure 1). Based on this assessment, East Runway Slough becomes a third order system where the second order slough connecting to Jordan Creek joins East Runway Slough. Sunny Slough becomes a third order channel where two unnamed second order sloughs join. First order channels generally drain at low tides while higher order channels provide sub-tidal habitat fringed by intertidal mudflats (Simenstad, 2000). This classification also provides a basic understanding of how tidal flows are distributed on incoming tides and drained on outgoing tides. Higher tides flow directly across the marshplain as well as in the various tidal channels. Channel Profiles VAI staff combined aerial photographs (c. 2001) of the slough system south and east of JNU with spot elevation data collected by HDR/Carson-Dorn in the summer of 2005 to define the major tidal flow paths between Fritz Cove and the Gastineau Channel and to determine the basic slope directions of the various channel segments. General channel slope direction is indicated with arrows in Figure 2. Larger arrows indicate a steeper slope while smaller arrows indicate a channel that is close to flat. These slope definitions are generally based on the survey elevations (Appendix A). There is an area of higher elevation in the tidal marsh that causes the channels to drain to the east or the west as the tide recedes. These tipping points are generally located in Figure 2. This figure includes marsh vegetation communities including: open water, unvegetated tidal, low marsh and high marsh. Because there is a strong correlation between tidal marsh vegetation and the frequency and depth of tidal inundation, these areas can be used to map the frequent extents of tidal inundation. The two primary flow paths defined in the vicinity of JNU based on this assessment are illustrated in Figure 2. The primary flow path, also referred to as the major flow path, runs between East Runway Slough and Sunny Slough. The secondary, or minor, flow path is through an unnamed slough channel that runs parallel and to the north of the primary flow path. Elevation data from HDR/Carson/Dorn along these flow paths was used to compare the relative elevations of the slough channels. This was done to determine to what extent the secondary flow path could replace the primary flow path if the primary channel system was filled. Figure 3 shows the elevations of the two flow paths from the HDR/Carson-Dorn survey with the area of highest elevation within each flow path plotted. It is likely that these elevations were not consistently recorded at the lowest part of the channel; however, they do provide a range of field surveyed elevations along the flow path. Water in the secondary flow path generally flows from west to east. Some water enters the system through a tide gate (~4.1 ft-msl) on Miller-Honsinger Pond. The rest appears to be pushed into the system from the Gastineau Channel on the flood tide. The approximate elevation at the point where the secondary flow path joins the primary flow path is 2.2 ft-msl. The average elevation along this path is about 4.4 ft-msl but the highest point is around 5.7 ft-msl. Elevations in this range define the tipping point the location where draining flow splits on the ebb tide. The primary flow path transports a considerable volume of tidal water but also received some flow from Jordan Creek in the west. The lowest surveyed elevation at the west end of the flow path is about -0.5 ft-msl while the L-3 Page 2

lowest elevation surveyed in the east is about 0.8 ft-msl. The average elevation along this path is about 2.4 ft-msl but the highest point is around 4.7 ft-msl. Elevations in this range define the tipping point on the primary flow path. The elevation difference between the two flow paths is about one-foot. Field Assessment VAI staff performed a field assessment in early November 2005. The objective of this field assessment was to verify the channel profile conditions and to roughly determine flow distribution in the East Runway Slough system. Field observations were made at a number of slough channel locations. These were recorded using Trimble GeoXT GPS and are illustrated in Figure 4. Four discharge measurement locations, and eight water depth and flow direction observation locations are shown in Figure 4. Two tipping points (determined from water depth and flow direction) for distributing flows east and west are also shown in Figure 4, verifying the location of the tipping points identified in the channel profile. Figure 4 also shows the photo point from which panoramic photos were taken at both high and low tides on November 8, 2005 (Figures 5 and 6). The panoramic photographs in Figures 5 and 6 communicate the extent to which land is inundated and drained by daily tides. The high and low tide elevations for the week of the field visit are shown in Table 1. By comparing the photographs to the permanently inundated and frequently scoured areas in Figure 4, one can appreciate the large volume of water that is regularly exchanged in this system even during comparatively low winter tides. Table 1 Tide Elevations at Time of Field Assessment Monday Tuesday Wednesday Thursday Friday 11/07/05 11/08/05 11/09/05 11/10/05 11/11/05 AST ft-msl* AST ft-msl AST ft-msl AST ft-msl AST ft-msl 4:44 AM 5.00 5:56 AM 4.70 12:21 AM -6.90 1:38 AM -6.60 2:46 AM -6.70 10:12 AM -2.80 11:27 AM -2.20 7:14 AM 5.10 8:23 AM 6.10 9:20 AM 7.40 4:11 PM 7.20 1:01 PM -2.50 2:26 PM -3.90 3:33 PM -5.80 11:07 PM -7.80 5:25 PM 6.00 6:54 PM 5.40 8:23 PM 5.50 9:37 PM 6.20 *MLLW - 8.6 Discharge measurements were made at four locations shown in Figure 4 using a flow meter and wading rod conforming generally with U.S. Geological Survey (USGS) discharge measurement standards. The measurements were made on November 8, 2005 during low tide beginning downstream with Station 1 at around 12:00 noon and ending with Station 4 at the upstream end about 2:00 p.m. (Figure 4). The discharge measurements consisted of water depth observation with the wading rod at intervals across the channel where average velocity was measured with the flow meter. Table 2 presents the discharge measurement findings. The results are close to those expected. Station 4 is the smallest channel measured and is the furthest from Fritz Cove while Station 1 is the largest channel measured. Discharge at this station, ~24 cfs, is slightly more than the sum of the discharge measurements at Station 2 and Station 3 (~22 cfs) which contribute to the discharge at Station 1. The ~2-cfs difference (~six percent) is likely due to a couple of factors: changes in flow associated the measurements not being simultaneous, and possible wind effects at the upper measurement locations where depths were very shallow. At 12:00 noon when the field measurements were begun the tidal elevation was approximately -2 ft-msl, and by 2:00 p.m. this elevation was about 2 ft-msl. However, no backwater effect was observed. Winds were very high though, and may have affected L-4 Page 3

vertical velocity distribution in the channels leading to under measurement of channel velocity and discharge at Station 3. Table 2 East Runway Slough System Discharge Measurements Station and Number Width (feet) Area (sq-ft) Mean Depth (feet) Velocity (ft/sec) Discharge (cfs) 4. Miller-Honsinger Slough below Zig Zag 23.5 08.5 0.36 0.61 4.9 3. East Runway Slough above Jordan Creek 28.2 12.5 0.44 0.78 9.9 2. Jordan Creek below culvert 29.0 17.0 0.59 0.73 12.4 1. East Runway Slough below Jordan Creek 36.9 22.6 0.61 1.11 24.0 Analysis Proposed safety improvements include filling of jurisdictional wetlands in the marshplain for a Runway Safety Area at the east end of the runway. Proposed RSA 5C would block the existing flows as shown in Figure 7. The proposed fill would extend east to nearly merge with the arc of dredge spoils southeast of the RSA. Two primary impacts would result from this fill without an active channel relocation to maintain the connection between Miller- Honsinger marsh and East Runway Slough: 1. Miller-Honsinger Slough and Dredge Slough flows would be diverted away from Fritz Cove and over to Gastineau Channel via Sunny Slough resulting in an enlargement of Sunny Slough, 2. East Runway Slough would lose those contributing flows resulting in a decrease in channel size and capacity/stream order. These impacts would occur as soon as the fill was placed and would persist. There are secondary impacts that would occur in this estuary system as well. Those secondary impacts include: 1. The tipping points identified in Figure 2 would impede drainage leading to pooling of tidal waters upstream unless the channel profiles were modified to provide positive drainage for all tide ranges, 2. The loss of discharge from Miller-Honsinger and Dredge Slough (12 cfs as measured at low tide on November 8, 2005) would result in approximately half to two-thirds the flow (24 cfs 12 cfs to 20 cfs 12 cfs) in East Runway Slough below Jordan Creek (mean annual flow of approximately 8 cfs). The pooling of tidal waters in the sloughs north of the RSA could create a new wildlife hazard. The loss of flow by the diversion might have impacts on salmonids navigating back to Jordan Creek due to changed flow conditions, or on habitat for salmonids or feed fish in this area due to the decrease in low marsh that would result from the diversion of flows. Figure 8 compares RSA 6A or 6B, RSA 1or 6C and RSA 5C. The figure shows that opportunities for active tidal channel relocation to maintain a connection between East Runway Slough and Miller-Honsinger marsh appears stronger with alternatives RSA1, and RSA 6A or 6B. This is due to lower land surface elevation along the desired flow path and the shorter length of the flow paths. Channel relocation around the end of the RSA is possible with RSA 5C, but more excavation would be required due to higher land surface elevations along the desired flow path and the required length of the flow path. L-5 Page 4

Conclusions Additional analysis was performed by VAI on the slough system at the east end of JNU. This analysis included: Establishing the order and channel classification for major channels in the East Runway Slough and Sunny Slough systems, Developing channel profiles using HDR/Carson-Dorn survey data, Making discharge measurements in key channels associated with East Runway Slough to establish likely flow distribution. Fieldwork for this analysis was performed by VAI staff November 7-9, 2005. Under existing conditions, due to the relative elevation and slope of the existing channels, much of the water that drains from the tide gates on Miller- Honsinger Pond flows around the end of runway 26 in East Runway Slough where it drains to the west. The area south of Miller-Honsinger Pond receives tidal flow from both the Gastineau Channel and Fritz Cove depending on the tide height. Tides greater than about 4.7 ft-msl can pass over the tipping point in the primary flow path while those greater than about 5.7 ft-msl can pass over the tipping point in the secondary flow path. Higher flows move across the marshplain directly as well as in these tidal channels. If East Runway Slough at the end of runway 26 was filled, as proposed for the East Runway RSA alternatives, drainage from Miller-Honsinger Pond would be hampered. Tidewater and stormwater that currently drain through the Slough would back up in the existing channels (~4 ft-msl) between the proposed runway fill (~20 ft-msl) and the existing high marshplain (~16 to 20 ft-msl). Figure 7 shows RSA 5C superimposed on an air photo. The area south of Miller-Honsinger Pond would only drain when the water surface elevation exceeded the tipping point on the secondary flow path (~5.7 ft-msl). It is likely that the secondary flow path channel would eventually enlarge and deepen, though it is difficult to predict the length of time that this would take. The affect of the proposed fill on drainage is less for RSA 6A and 6B. In these alternatives, low elevation areas including marshplain and tidal channels, are not filled preserving part of the existing tidal channel network. Figure 8 shows RSA 6A which extends slightly farther into the marsh than RSA 6B. Tidal flow reaching Dredge and Miller-Honsinger Sloughs would also be limited by the RSA fills. As with drainage this effect would be the greatest for RSA 5C and would be less for RSAs 1 and 6C and RSAs 6A and 6B respectively. In Figure 8 the marshplain is colored to show how frequently it is inundated by tidal flow. The yellow areas are inundated by peak tides and therefore do not provide frequent flow into the marsh. For tidal flow to access this area using the secondary flow path, tidal elevations would need to be greater than the defined tipping point along the secondary flow path, about 5.7 ft-msl or the existing high marshplain, between 16 and 20 ft-msl. As mentioned earlier, the tipping point on the secondary flow path is a foot higher than the tipping point on the primary flow path. Therefore, the overall effect of the proposed fill would be a decrease in the frequency of tidal channel scouring and of tidal inundation of the marshplain north of the proposed RSA fill. RSA 5C proposes fill that extends to an upland area in the marsh on which trees are growing. This effectively cuts off most tidal flow between the airport and this upland. RSA 1 and RSA 6C extend a shorter distance into the marsh. Some of the area inundated by peak tides is preserved in these alternatives. The proposed RSA fill at the end of runway 26 would also affect the tidal channels south of the proposed RSA. These channels would adjust by decreasing in size and complexity as a result of the decrease in the volume of water and sediment moving through the system on the ebb tide. Key changes are that Sunny Slough will be the only 3 rd order tidal channel system, as the East Runway Slough will downsize and become a 2 nd order system. Flow in the East Runway Slough channel below Jordan Creek could decrease to approximately half to two-thirds existing flow as a result. The simplification of the tidal channel system in this area would decrease access to both high and low marsh from the tidal channel system. Loss of access to marsh fringe in the slough associated with Jordan Creek is difficult to assess in terms of how aquatic species will respond and, in turn, how salmonids in the Jordan Creek system may be impacted. L-6 Page 5

References Coats, R.N., P.B. Williams and C.K. Cuffe, 1995. Design guidelines for tidal channels in coastal wetlands. Prepared for the U.S. Army Corps of Engineers Waterways Experiment Station. HDR/Carson-Dorn, Inc. 2005. Survey data for tidal channels east of Juneau International Airport. Rantz. S.E. et al. 1982. Measurement and Computation of Streamflow: Volume 1, Measurement of Stage and Discharge. Water Supply Paper 2175. U.S. Geological Survey. 284 pp. Simenstad, Charles 2001. Restoration of juvenile salmon rearing habitat in the Salmon River estuary. Society of Ecological Restoration, 2001 Northwest chapter conference workshop. Bellevue, Washington. Wienmann, Fred, Marc Boule, Ken Brunner, John Malek, and Vic Yoshino, 1984. Wetland Plants of the Pacific Northwest. U.S. Army Corps of Engineers, Seattle District. Williams, P.B., M.K. Orr and M.S. Lighthiser, 2000. Hydraulic Geometry: A geomorphic design tool for tidal marsh evolution in wetland restoration projects. Philip Williams & Associates, Ltd. Corte Madera, California. L-7 Page 6

Chapter L: Detailed Analysis of East and Lateral Runway Safety Area Alternatives on Tidal Channel Geomorphology Figure 1. Slough Channels with Channel Order (RSA 5C old) L-8

Figure 2. Slough Channel Flow Paths and Vegetation (RSA 5C old) L-9

Chapter L: Detailed Analysis of East and Lateral Runway Safety Area Alternatives on Tidal Channel Geomorphology Figure 3. Slough Channel Profile Comparison Slough Channel Elevations 6 5 4 Elevation in feet (MSL) 3 2 1 0 0 1000 2000 3000 4000 5000 6000 7000 8000 9000-1 -2 Distance along channel west to east (feet) Minor Slough Channel Major Slough Channel Poly. (Minor Slough Channel) Poly. (Major Slough Channel) L-10

Figure 4. Slough Channels with Field Assessment Locations (RSA 5C old) L-11

Chapter L: Detailed Analysis of East and Lateral Runway Safety Area Alternatives on Tidal Channel Geomorphology Figure 5. Photo and High Tide about 4.5 feet MSL (~ 6:30 AM November 8, 2005) Figure 6. Photo and Low Tide about -2.0 feet MSL (~11: 30 AM November 8, 2005) L-12

Figure 7. Predicted Slough Channels with Channel Order (RSA 5C old) L-13

Figure 8. Comparison of East RSA extents (RSA 6A, RSA 1 or 6C and RSA 5C new) L-14

Appendix A Individual channel elevation plots generated from HDR/Carson-Dorn survey data L-15

Slough Channel Locator Map Slough Side-Channel #2 (west) 6 Elevation (feet MSL) 5 4 3 2 1 0-1 0 2000 4000 6000 8000 Distance Along Channel South to North (feet) L-16

Slough Side-Channel #3 6 Elevation (feet MSL) 5 4 3 2 1 0-1 0 100 200 300 400 500 600 700 800 900 100 0 Distance Along Channel West to East (feet) Slough Side-channel #4 Elevation (feet MSL) 6 5 4 3 2 1 0-1 0 200 400 600 800 1000 Distance Along Channel South to North (feet) Slough Side-channel #5 Elevation (feet MSL) 6 5 4 3 2 1 0-1 0 100 200 300 400 500 600 700 800 900 100 0 Distance Along Channel South to North (feet) L-17

Slough Side-channel #7-6 Elevation (feet MSL) 6 5 4 3 2 1 0-1 0 1000 2000 3000 4000-2 Distance Along Channel South to North (feet) Slough Side-Channel #6 Elevation (feet MSL) 7 6 5 4 3 2 1 0-1 0 500 1000 1500 2000 2500 3000 Distance Along Channel West to East (feet) Slough Side-Channel #7 6 Elevation (feet MSL) 5 4 3 2 1 0-1 0 500 1000 1500 2000 2500 Distance Along Channel North to South (feet) L-18

Slough Side-Channel #8 9 Elevation (feet MSL) 7 5 3 1-1 0 500 1000 1500 2000 2500 Distance Along Channel North to South (feet) Slough Side-Channel #9 9 Elevation (feet MSL) 7 5 3 1-1 0 500 1000 1500 2000 2500 Distance Along Channel North to South (feet) L-19

THIS PAGE INTENTIONALLY LEFT BLANK L-20