An Overview: 5000 MW Ultramega Solar Park at Dholera. For the positive response to Expression of Interest (EoI)

Similar documents
Recommended Alternatives

Geometric Style Die Head Chasers

Premium Report 27/07/2017

windpro WP A15-Lingewaard WTGs Shadow receptor-input

PEM-EX-C. Figure: PEM-EX-C*A*G. ka054000en; Rev. 2.7 J

ERIE COUNTY, NEW YORK (ALL JURISDICTIONS)

Are We There Yet? IPv6 as Related to GDP per Capita. By Alain Durand November 28 th,` 2016

Goodyear Polyglas Tire Date Coding

PLEASE NOTE THAT ILLUSTRATIONS ARE NOT TO SCALE! Commentary gives size in mm s

Information. Additional Requested Information: Attachments: MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD. Tender for Operations and maintenance

Held by Held by Held by Secondary. Total Primary Secondary Special/ Federation

Supersedes: RP1(495) Form RP1 (1102)

Type S-10, S-11 General Purpose Pressure Transmitters

NORFOLK COUNTY, MASSACHUSETTS (ALL JURISDICTIONS)

To consider the introduction of a revised UEA timetable slotting matrix for use commencing in 2019/20.

Compressed OEM. Nr WiRE MAKE NTK AIRTEX BOSCH DENSO WALKER

Walk Description. Directions

TYPE APPROVAL CERTIFICATE

Details and Cost Analysis of a Five Stall Engine House

Girls U11 Flight - Premier Purple Rank Team Name Girls U11 Flight - Premier Orange Rank Team Name

SHOWCARD 1. I m fluent in Welsh. I can speak a fair amount of Welsh. I can only speak a little Welsh. I can say just a few words

Barbecue Stainless 4000

SIGNUM 3SB3 Pushbutton Units and Indicator Lights

Contract # W91QUZ-09-D-0043 AIT IVProject Progress Review (PPR) Lowry. June 5, 2012 Presented by: Joan Rayford, Russ Sanchez Lowry Computer Products

Sport statistics: how to assemble your team elivian.nl high quality, poorly written update history current(v2.1):7-oct-16, original(v1):13-sep-14

2 Overview. SITRANS P measuring instruments for pressure. Transmitters for gage and absolute pressure. Z series for gage pressure

Pressure Measurement Single-range transmitters for general applications

TABLE OF PUBLIC STATUTES

CHANNEL & SUPPORT SYSTEMS

BOWRAP BOWLING LEAGUE FIXTURE GENERATION

SITRANS P measuring instruments for pressure

1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT U 1 3

Appendix B-2: General Population Codebook

Cooper B-Line Replacements for Discontinued TOLCO Figure Numbers. Pipe Hangers/Pipe Supports...1. TOLCO Figure Numbers with Continued Availability...

SERVICE INSTRUCTION.

JAM_CATALOGUE_2015_new models

YAMALUBE OIL CHANGE KITS

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/16 Siemens FI US Edition

Recent Minima of 161 Eclipsing Binary Stars

1 Overview. Pressure Measurement Transmitters for basic requirements. 1/16 Siemens FI SITRANS P220 for gauge pressure

Trading Application Form

Fast Switching Valves

USEF NATIONAL (A) RATED HUNTER DIVISIONS AND CLASSES DIVISION SECTION CLASS DIVISION FEE CLASS FEE PRIZE MONEY

CENTRIFUGAL COMPRESSORS

Inkling Fan Language Character Encoding Version 0.3


Co(III)-Catalyzed C H Activation: A Site-Selective Conjugate Addition of Maleimide to Indole at the C-2 Position

WIKA TRONIC Catalog. Electronic Pressure Measurement

TEACHER. Days: 200 Days: 200. Placement Full Time Part Time

RESOLUTION NO

8 Scale Foot Guards Regiment Figurines

Reservoir Fluid Fundamentals COPYRIGHT. Dry Gas Fluid Basic Workflow Exercise Review

Radiation-based. 166 Overview PROTRAC 170 FIBERTRAC SOLITRAC POINTRAC MINITRAC WEIGHTRAC VEGASOURCE 31, 35

Type N-10, N-11 Hazardous Area Non-incendive Transmitters

JR SERIES DEDICATED OUTSIDE AIR SYSTEM ENGINEERING GUIDE Up to 100% Outside Air Design

PIAB VGS TM Low energy Fast response Complete mounting flexibility High performance at MPa.

NORTH DEVON DISTRICT COUNCIL REVIEW OF POLLING DISTRICTS & POLLING PLACES/STATIONS Information Sheet

REPAIRS OF THE 1841 ONE PENNY PLATES Revised

Cassette Sprocket. Dealer's Manual CS-M9000 CS-M9001 CS-M8000 CS-HG CS-HG400-9 CS-HG300-9 CS-HG200-9 CS-HG200-8 CS-HG50-9 CS-HG50-8 DM-CS

RULES OF THE FOOTBALL PREDICTIONS ASSOCIATION version /2018

Opening Angle 76º 30º [337] 45º 76º 30º [213] 45º 76º 30º [169] 45º 76º 30º [337] 45º 76º 30º [337] 45º 76º 30º [128] 45º 76º 30º [404] 45º 76º 30º

DIVE ADMINISTRATION (5AD) Checklist

Sept 23, 2014 LAB MANUAL

CDR File Information. User Case Number EDR Data Imaging Date Crash Date

POKER ADVERTISING (GAMBLING) PZ-A? thru PZ-AW. *** Variations. PZ-A? A.B Casino Supply T Mold / v: PZ-A? Burt Company Plain Mold / v:

&! - ( &+) &% # &%!,!)!&%

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Expenditure Category. Goods. Works

7 th Grade Math Name

Girls 07 (11U) Age Group Flight Rank Team Name Team ID Girls 11 Under (07) Girls 11U Premier Orange 1 Wasatch SC '07G - ZB XG Girls 11

CHAPTER 8 APPLICATION AND INTERPRETATION OF CONGESTION MEASURES

Lightweight Roof Tiles Designed for Life. unique high performance shingles. Product Guide & Price List

SOLUTIONS TO TUTORIAL EXAMPLES CHAPTER 13

WY Black Hills Northwest Wyoming Gas Utility Company, LLC

Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.) March 22, 2013 Tokyo Electric Power Company

AIT-IV Project Progress Review (PPR)

2014 golf academy BAKER NATIONAL, MEDINA CLEARY LAKE, PRIOR LAKE EAGLE LAKE, PLYMOUTH GLEN LAKE, MINNETONKA

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

.//0 & (!" # $ % & ' ( & ) & * + # $ (, -

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

Category Works: Activities ShowHide

Improved Packaging Material for Certain Bourns Precision Potentiometers

1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT U 1 4

1987 TURFGRASS SOIL RESEARCH REPORT. P. E. Rieke, M. T. McElroy and Douglas Lee Crop and Soil Sciences Department, M.S.U.

HARDWARE SPECIFICATIONS

SPORTS REGULATIONS OF. CERN Open Table Tennis Challenge 2017

Western Tack & Saddlery

Safety When Using Liquid Coatings

UCR AUDIT PROCESS: Downloading and Saving the UCR Audit Report: 1. Log-in to UCR Website at: 2. Select Reports feature

General Board Meeting Sand Creek Middle School Cafeteria Thursday, January 10, :00 PM

DETAILED IMPACT ANALYSIS OF MARMOT BASIN LONG RANGE PLAN

Schedule of Day Classes Fall 2016

Damao Range. Single & Double Line Pressure Regulator - 4 or 8 bar

DIVE DIVING BOAT (5DB) Checklist

Mortal Kombat: Tournament Edition Krypt Guide Versoion 1.1, released

2005 Spa Pre-Delivery Guide

Marine Mammals of the Southeast Atlantic

NAVY AND MARINE CORPS PUBLICH HEALTH CENTER ENVIRONMENTAL PROGRAMS DIRECTORATE. Site-Specific Health and Safety Plan Review Checklist

INDUSTRIAL THERMOMETER

4.0 TRANSPORTATION SYSTEMS

1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT U 1 2

Transcription:

An Overview: 5000 MW Ultramega Solar Park at Dholera For the positive response to Expression of Interest (EoI)

Outline Location Plant Capacity. Status of the project Modalities of implementation of Solar projects with-in solar Park Studies completed by DSIR/GPCL Issues and Challenges Site photographs. 2

Geographical Location of the Proposed Solar Park 3

Geographical Location of the Proposed Solar Park Location : Village Mahadevpura- Bhangad Total Land Approx. 9800 Category under GCZMA CRZ 1(B) Type of land : Waste Land Ownership : 100% Dholera SIR Estimated capacity : 4500 MW Total Plots : 27 plot 4

Geographical Location of the Proposed Solar Park 5

Layout of Solar Park Project Phase I1 Project Phase 1 6

Solar Park Plot Capacity Phase 1 Phase 2 Plot No Area (acre) MW Capacity Plot No 14 900.89022 200 Plot No 15 901.84281 200 Plot No 16 900.562559 200 Plot No 17 458.811715 100 Plot No 18 491.485914 100 Plot No 19 722.574063 160 Plot No 20 900.450126 200 Total 5276.62 1160 Assumption : 4.5 Acre/MW Plot No Area (acre) MW Capacity Plot No 1 720.86286 160 Plot No 2 706.724501 160 Plot No 3 740.342642 160 Plot No 4 721.191757 160 Plot No 5 721.514229 160 Plot No 6 720.248805 160 Plot No 7 900.336952 200 Plot No 8 896.262437 200 Plot No 9 886.75186 200 Plot No 10 884.300331 200 Plot No 11 A 270.648917 Plot No 11 B 447.748824 160 Plot No 12 899.848425 200 Plot No 13 358.58222 80 Plot No 21 900.48645 200 Plot No 22 438.35488 100 Plot No 23 720.16553 160 Plot No 24 720.290565 160 Plot No 25 715.483385 160 Plot No 26 781.142643 160 Plot No 27 1013.09764 200 TOTAL 15164.40 3340 7

Plot Coordinates (1/2) PLOT NO. 1, 2 & 3 Label Latitude Longitude A 22 18' 53.311" N 72 17' 17.227" E B 22 18' 31.280" N 72 18' 2.539" E C 22 18' 48.102" N 72 18' 41.546" E D 22 18' 30.076" N 72 18' 53.952" E E 22 18' 20.819" N 72 19' 18.374" E F 22 18' 6.529" N 72 19' 8.917" E G 22 17' 51.455" N 72 19' 22.964" E H 22 17' 45.300" N 72 19' 57.257" E I 22 17' 22.605" N 72 19' 40.640" E J 22 17' 25.544" N 72 18' 46.443" E K 22 17' 28.762" N 72 17' 4.429" E L 22 17' 56.365" N 72 17' 4.943" E PLOT NO. 4, 5, 6, 7, 8, 9, 10, 11A, 11B, 12, 13 Label Latitude Longitude M 22 15' 13.992" N 72 14' 16.878" E N 22 14' 56.343" N 72 14' 23.289" E O 22 14' 57.079" N 72 14' 57.376" E P 22 15' 8.757" N 72 15' 30.858" E Q 22 14' 59.137" N 72 16' 24.998" E R 22 15' 10.510" N 72 17' 45.283" E S 22 15' 21.173" N 72 19' 7.934" E T 22 15' 25.714" N 72 20' 20.889" E U 22 14' 26.346" N 72 19' 43.021" E V 22 13' 19.260" N 72 19' 39.217" E W 22 12' 46.062" N 72 19' 3.981" E X 22 12' 42.471" N 72 18' 12.514" E Y 22 13' 34.831" N 72 17' 48.351" E Z 22 13' 17.506" N 72 17' 17.130" E AA 22 12' 29.201" N 72 16' 19.201" E AB 22 12' 28.841" N 72 17' 32.003" E AC 22 11' 50.396" N 72 17' 40.207" E AD 22 11' 21.798" N 72 17' 38.922" E AE 22 11' 12.338" N 72 16' 30.518" E AF 22 11' 45.068" N 72 16' 49.921" E AG 22 12' 4.820" N 72 17' 15.800" E AH 22 12' 10.461" N 72 16' 22.426" E AI 22 12' 42.988" N 72 15' 31.311" E AJ 22 13' 35.802" N 72 15' 54.444" E AK 22 14' 11.840" N 72 16' 13.865" E AL 22 14' 33.972" N 72 15' 37.098" E AM 22 14' 35.923" N 72 14' 33.825" E AN 22 15' 0.212" N 72 14' 5.345" E AO 22 14' 46.472" N 72 14' 58.945" E PLOT NO. 23, 24, 25 Label Latitude Longitude BY 22 3' 33.917" N 72 12' 20.569" E BZ 22 3' 39.225" N 72 12' 50.134" E CA 22 3' 29.496" N 72 13' 26.342" E CB 22 2' 59.332" N 72 13' 45.413" E CC 22 2' 25.406" N 72 13' 42.846" E CD 22 1' 53.993" N 72 13' 2.224" E CE 22 1' 34.127" N 72 13' 11.276" E CF 22 1' 5.928" N 72 13' 6.185" E CG 22 0' 43.619" N 72 12' 52.265" E CH 22 1' 4.326" N 72 12' 23.802" E CI 22 1' 21.699" N 72 12' 17.689" E CJ 22 1' 25.813" N 72 11' 49.877" E CK 22 2' 10.758" N 72 12' 6.566" E CL 22 2' 31.624" N 72 12' 35.909" E CM 22 3' 10.555" N 72 12' 26.950" E 8

Plot Coordinates (2/2) PLOT NO. 14, 15, 16, 17, 18, 19, 20, 21, 22 Label Latitude Longitude AP 22 9' 47.107" N 72 15' 17.127" E AQ 22 9' 38.693" N 72 15' 35.705" E AR 22 9' 1.501" N 72 15' 43.511" E AS 22 8' 39.740" N 72 15' 24.939" E AT 22 8' 32.278" N 72 14' 14.980" E AU 22 7' 57.795" N 72 14' 41.710" E AV 22 8' 15.004" N 72 15' 17.452" E AW 22 8' 6.351" N 72 15' 49.805" E AX 22 7' 49.511" N 72 15' 52.264" E AY 22 7' 20.817" N 72 15' 32.782" E AZ 22 7' 16.548" N 72 15' 5.617" E BA 22 6' 50.580" N 72 15' 9.247" E BB 22 6' 40.535" N 72 15' 20.494" E BC 22 6' 17.714" N 72 15' 15.868" E BD 22 6' 35.328" N 72 15' 32.510" E BE 22 5' 44.378" N 72 15' 20.196" E BF 22 5' 0.318" N 72 15' 35.840" E BG 22 4' 12.324" N 72 15' 39.721" E BH 22 3' 56.775" N 72 15' 7.730" E BI 22 4' 2.469" N 72 14' 42.134" E BJ 22 3' 0.696" N 72 13' 46.244" E BK 22 3' 32.173" N 72 13' 28.128" E BL 22 3' 27.507" N 72 12' 53.841" E BM 22 3' 55.072" N 72 12' 46.891" E BN 22 4' 3.438" N 72 12' 38.441" E BO 22 4' 9.483" N 72 13' 27.877" E BP 22 4' 34.854" N 72 13' 34.211" E BQ 22 5' 0.423" N 72 14' 13.192" E BR 22 5' 34.569" N 72 15' 12.535" E BS 22 6' 16.681" N 72 14' 25.544" E BT 22 7' 1.393" N 72 13' 21.076" E BU 22 7' 42.306" N 72 13' 46.478" E BV 22 8' 41.635" N 72 13' 32.447" E BW 22 9' 20.013" N 72 14' 10.403" E BX 22 9' 27.508" N 72 14' 42.809" E PLOT NO. 26, 27 Label Latitude Longitude CN 22 0' 52.291" N 72 9' 56.471" E CO 22 0' 49.889" N 72 10' 27.759" E CP 22 0' 48.864" N 72 10' 58.536" E CQ 22 0' 34.410" N 72 11' 14.336" E CR 22 0' 33.770" N 72 11' 35.149" E CS 22 0' 10.804" N 72 11' 45.369" E CT 21 59' 41.308" N 72 12' 9.062" E CU 22 0' 0.833" N 72 12' 14.401" E CV 22 0' 1.106" N 72 12' 30.715" E CW 21 59' 24.488" N 72 12' 45.733" E CX 21 59' 15.677" N 72 11' 59.042" E CY 21 59' 42.547" N 72 11' 21.682" E CZ 21 59' 24.146" N 72 10' 54.725" E DA 21 59' 35.233" N 72 10' 21.271" E DB 21 59' 53.707" N 72 9' 58.479" E DC 22 0' 14.611" N 72 10' 3.377" E 9

Status of the Project CRZ- I (B) Area is earmarked Rapid EIA prepared Flood Assessment study Report prepared Soil Investigation Study completed Proposed area for Solar Park in CRZ-I (B) is earmarked GCZMA Authority has approved the proposal and will send to MoEF for approval. In-principle approval received from MNRE GoI Draft DPR for Solar Park is almost ready Area for 33kV/220 kv Substation ( Pooling statation ) is earmarked 10

Modalities of implementation of Solar projects with-in solar Park 11

Infrastructure to be provided by SPDA, i.e. GPCL GPCL will be solar Park Development agency Approach Road (Not internal road of the plot) River training works (optional) Power Evacuation - 33/220kV Sub-Station (Connecting 33 kv cables is the responsibility of the developer) Water Supply Network (Up-to plot) Solar Park Fencing Street Light Land of plots shall be provided on long term lease basis. 12

Responsibility of Solar Project Developer Project is to be develop under Guidelines of the Developer of the solar Park, issued by MNRE, GoI. As a Solar Park developer, GPCL shall provide basic facilities as mentioned in previous slide Power Generated shall be procured by GUVNL / SECI Pooling Station of 33/220 kv shall be provided by GPCL Solar Project developer shall be selected through competitive bidding process. Selected Solar project developer has to conceal, design, procure, build, Operate and maintain the solar project for the entire PPA period. 13

Schematic view of Roles Dholera UMSP Land, Approch Road, Water, Pooling S/S 220 kv Transmission Line Facilities by SPDA (GPCL) Solar 33 kv / 220 kv Site development, procurement of Solar panels, invertors, 11 KV transmission systems, cables, design, build, finance operate, maintain Solar Project within Plot. Responsibility of Solar Project Developer

Studies completed by DSIR/GPCL Final Soil Investigation Report (Annexure 1) HTL-LTL, Anna University Report (Annexure 2) Final CRZ Map (Annexure 3) Flood Impact Study (Annexure 4) EIA Report (Annexure 5) GCZ MA Application (Annexure 6) Draft DPR of Solar Park (Annexure 7) 15

Issues and Challenges The entire area of Solar Park is falling under Coastal Regulation Zone (CRZ-1B). Prior Environmental Clearance is required. Soil investigation study work indicates that Soil consists of salty clay of medium plasticity up to 10.00m depth of termination. Soil has swelling potential. Ground water table is observed at depth 1.50m to 2.50m depth below GL. Location is near seashore, there will be frequent submergence of area during high tide period, Considering all above factors, special foundation & structure would be required. Special treatment to foundations and structure would also be needed. As per the flood assessment study, entire area submerged during the three months in monsoon period. This would add further challenge to operate and maintain the solar park during such period. 16

Site Photos (Visit on 01/08/18) from GPCL (1/3) 17

Site Photos (Visit on 01/08/18) from GPCL (2/3) 18

Site Photos (Visit on 01/08/18) from GPCL (3/3) One feet deep 19

An Overview: 5000 MW Ultramega Solar Park at Dholera For the positive response to Expression of Interest (EoI)