Casing and Cementing Requirements

Similar documents
Reclassification and Recompletion

The Alberta Energy Regulator (AER) has approved this directive on January 31, Introduction Purpose of This Directive...

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

Oil, Gas and Salt Resources of Ontario

Casing Design. Casing Design. By Dr. Khaled El-shreef

Directive 059: Well Drilling and Completion Data Filing Requirements

Texas Administrative Code

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

Float Equipment TYPE 925/926

Off-Target Well Requirements

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS

1 Introduction Purpose of the Directive AER Requirements What s New in This Edition Overview...

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

OREGON HEALTH. Systems Public Water Supply Systems Community Water Supply Systems Source Water Protection

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

W I L D W E L L C O N T R O L FLUIDS

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Petroleum Development

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

Perforating Center of Excellence TESTING SERVICES OVERVIEW

Testing Services Overview

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES

Drilling Efficiency Utilizing Coriolis Flow Technology

DB Bridge Plug. Features. Benefits. Applications

Dynamic Underbalance (DUB)

APPENDIX A1 - Drilling and completion work programme

Colorado Oil and Gas Conservation Commission

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

FAQs about Directive PNG017: Measurement Requirements for Oil and Gas Operations

Disposal/Injection Well Pressure Test Report (H-5)

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS OIL AND GAS OPERATIONS

1. The well has been shut in on a kick and the kill operation has not started.

Coal and Water Protection. PADEP: Well Plugging & Subsurface Activities Division Bureau of Oil and Gas Planning & Program Management

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE

Industry Code: Alberta Small Employer OHS Legislated Requirements

Deepwater Horizon Incident Internal Investigation

OCEAN DRILLING PROGRAM

Balmoral Offshore Engineering

Why Do Not Disturb Is a Safety Message for Well Integrity

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

SITE INSPECTION PROCEDURE FORM

VortexFlow DX (Downhole) Tool Installation Instructions

WSC Performance Standard and Recommended Installation Procedures for Sanitary Water Well. Pitless Adapters, Pitless Units, And Well Caps

Is my well safe? Terje Løkke-Sørensen, CTO, add energy

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

ENDEAVOR ENERGY RESOURCES

DIRECTIONAL DRILLING

E NGINEERED C EMENTING S OLUTIONS

Hydro-Mech Bridge Plug

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

Mechanical Integrity Assessment Training

Abandonment Program for Paramount Fort Liard F 36

OIL AND GAS DOCKET NO

Air and Gas Drilling

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion

IWCF Equipment Sample Questions (Surface Stack)

OIL AND GAS CONSERVATION RULES

WILD WELL CONTROL WARNING SIGNS OF KICKS

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

Sucker Rod Pumping Workshop Technology in a Mature Industry. September 2017 John C. Patterson Consultant Retired from ConocoPhillips (2015)

August 21, Deepwater MPD / PMCD

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

SPE Copyright 2004, Society of Petroleum Engineers Inc.

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

Instruction Manual Model Borehole Pressure Cell

OIL AND GAS CONSERVATION RULES

North Dakota Petroleum Council Re-stimulation Initiative

Representing EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

HYDROSTATIC LEAK TEST PROCEDURE

SPE MS. Copyright 2015, Society of Petroleum Engineers

Chapter 5 Drilling and Well Testing Practices

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Kerry A. Pollard Texstar Midstream Utility, LP Gallon E. Gray Phillip Zamzow EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

Abstract Objective Scope of Study Introduction Procedures

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Next Generation Quartz Pressure Gauges

Subsea Safety Systems

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

Part 1 Interpretation and Application

Frequently Asked Questions Directive 056 Facilities Technical

TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

1.0 PURPOSE 2.0 SCOPE 3.0 DEFINITIONS. ANSI: American National Standards Institute. CCC: Chemical Control Centre

How HSE regulates onshore oil and gas

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

GEOTHERMAL WELL COMPLETION TESTS

TARPON A Minimal Facilities Platform

Transcription:

Directive PNG005 May 2018 Revision 2.0 Governing Legislation: Act: The Oil and Gas Conservation Act Regulation: The Oil and Gas Conservation Regulations, 2012 Order: 148/18

Record of Change Revision Date Description 0.0 September, 2015 Draft 1.0 November, 2015 Final version, updated directive number, updated appendix format. 2.0 May, 2018 Changes to pre-set casing May 2018 Page 2 of 10

Contents 1. Introduction... 4 2. Definitions... 4 3. Governing Legislation... 4 4. Surface Casing Requirements... 4 5. Presetting Surface Casing Requirements... 5 6. Production Casing and Adequate Equipment Requirements... 6 Appendix 1: Areas with Additional Obligations... 8 1.1 Minimum Surface Casing Requirements... 8 1.2 Potable Water Sands Requirements... 8 1.3 Ground Water Precaution Areas... 8 1.4 Perched Aquifer Area... 9 May 2018 Page 3 of 10

1. Introduction This Directive outlines the requirement regarding cementing and casing requirements for oil and gas wells in Saskatchewan. Questions concerning the requirements set out in this document should be directed to the Ministry of Energy and Resources (ER) Service Desk at ER.servicedesk@gov.sk.ca or 1-855-219-9373. 2. Definitions IRIS means the Integrated Resources Information System, through which industry performs business activities and regulatory tasks. 3. Governing Legislation The requirements set out in this Directive are based on regulations in The Oil and Gas Conservation Regulations, 2012 (OGCR). It is the responsibility of all operators, as specified in the legislation, to be aware of and to ensure compliance with these requirements. If a licensee is aware of any cementing or casing requirements set out in this Directive or in the OGCR that are not being met in one or more of their wells, they must inform ER as soon as the non-compliance is identified. ER will then consider the most appropriate action to take to address the non-compliance. 4. Surface Casing Requirements Current surface casing requirements are listed below with the exception of those areas described in Appendix 1 where additional requirements must be followed. The minimum requirements for surface casing are as follows: Surface casing meeting American Petroleum Institute (API) specifications must be used in all wells; In every well drilled, sufficient surface casing must be run to reach a minimum depth that is equal to the deepest of: 20 metres below the base of the glacial drift; 10% of the projected total depth of the well; and 75 metres; Surface casing must be cemented in place by the pump and plug method or by the displacement method, with sufficient cement to circulate to the top of the hole; and Cement must be allowed to set under pressure for at least eight hours before the plug is drilled. If a float collar or guide shoe is used in setting surface casing, pressure at the surface may be released immediately on completion of the cement job but only if there is no bleed-back. May 2018 Page 4 of 10

No surface casing shall be removed from any well. The operator of a well that is completed to produce oil or gas or to inject fluid shall leave the annulus between the second casing string and the surface casing open to the atmosphere. The annulus vent line must: Have a minimum diameter of five centimetres; Extend at least 50 centimetres above ground level; Terminate so that any flow is directed either in a downward direction or parallel to the ground; Contain an open valve; and Have a working pressure rating for all parts of at least 23 kilopascals for every metre of depth of the surface casing. An operator may apply to the minister through IRIS for approval of any variation to the requirements above. 5. Presetting Surface Casing Requirements ER allows for presetting surface casing without prior approval. In these cases, the main hole may be drilled with a subsequent rig. Presetting surface casing must be done in accordance with the following requirements: The well licence application must indicate the use of preset surface casing. Casing centralizers must be run 3 metres off bottom, on top of second joint, and every third joint thereafter. The surface hole must be drilled to a minimum depth as determined in section 2 above and casing cemented in place at one location prior to moving the rig to another location. A third-party (rather than surface-casing rig) must conduct cementing operations unless the following conditions can be met: Equipment with the capability to batch mix and agitate a minimum volume of 50% excess cement (and additives if necessary) required to cement the depth and diameter of surface casing to surface. Returns of the surface casing cement must be recorded for documentation of casing details in IRIS; Obtain and retain a laboratory analysis that indicates the thickening time and compressive strength of the cement to be utilized in the surface casing. Cement used must be of oil well blend, designed specifically for oil well operations i.e.: Class G. This laboratory analysis must be available upon ER request; Obtain and document samples of wet and dry cement mix prior to and during the cementing procedures. This documentation must be available upon ER request; A plug-loading head must be utilized to minimize the introduction of air into the casing while cementing; Monitor wellbore obligations to determine if a surface casing cement bond log is required to ensure surface casing cement integrity; and The well is not intended to be used in project wells, (e.g. Enhanced oil recovery operations, Thermal, ASP, THAI, CO 2, etc.) May 2018 Page 5 of 10

Loss of circulation during drilling or primary cementing of surface hole must immediately be reported to appropriate field office, and may be subject to additional logging requirements, remedial cementing or required to be abandoned, at the discretion of ER. A designated company representative must be present during pre-set operations including drilling, landing of surface casing and cementing operations, and that representative must attach the preset casing details in IRIS or as required by ER. Drilling to the licensed total depth of the well must be completed within one year of the issued date of the licence. Otherwise, the well must be abandoned at the discretion of ER. If the one year from licence issue date has expired, application to abandon must be completed and submitted through IRIS for approval to abandon the preset surface casing within 90 days. 6. Production Casing and Adequate Equipment Requirements No equipment shall be used in drilling or completing a well unless it is in good condition, and production casing must meet API specifications and must comply in all respects with the specifications set out in the licence issued for the well and with any further specifications of the minister. Production casing is required to be cemented by the pump and plug method, the displacement method or any other approved method, and the cement must be set for at least 24 hours and properly tested by the pressure method before the plug is drilled out or the well perforated. If production casing is run through a porous stratigraphic unit or a stratigraphic unit containing fresh potable water not protected from invasion by other fluids, the stratigraphic unit must be cemented off by an approved method. In completing a well, the operator shall adopt methods and install equipment that the minister may specify. If it appears to the minister that any equipment or casing used in drilling or producing a well is inadequate, defective or hazardous, the minister may require the replacement or reconditioning of that equipment or casing and may order the suspension of operations until the required action is taken. The minister may, on application, approve the use of production casing that does not meet API specifications. Well-head equipment must be: Maintained in good working order; and Installed in a manner in which the tubing, casing and static bottom hole pressures may be obtained at any time by the minister. For all areas of Saskatchewan, production or intermediate casing must be cemented into the next string of casing. May 2018 Page 6 of 10

Licensees must document that any use of non-api casing meets well-design requirements, and a licensee may be required to supply documentation to ER supporting this fact. Otherwise, licenses may be cancelled or the well may be suspended. Wellbore and casing integrity must be suitable for the purpose for which the well is being used, independent of the intended use at the time of drilling. Non-API casing (I-55) may not be used in wells penetrating the top of the Second White Specks Formation. In this case, the production casing must meet or exceed current API-QI specifications and must be cemented to surface. May 2018 Page 7 of 10

1.1 Minimum Surface Casing Requirements Appendix 1: Areas with Additional Obligations Within the listed below, if the ground elevation is less than 564.0 m, a well must have surface casing set 137 m below surface; if the ground elevation is greater than 564.0 m, a well must have surface casing set 107 m below surface. Portion Section Township Range Meridian 1.2 Potable Water Sands Requirements All All 50 22 3 All All 50 23 3 All All 50 24 3 All All 50 25 3 All All 50 26 3 All All 51 22 3 All All 51 23 3 All All 51 24 3 All All 51 25 3 All All 51 26 3 All All 52 22 3 All All 52 23 3 All All 52 24 3 All All 52 25 3 All All 52 26 3 Within the lands listed below, a minimum 9.0 m length of conductor pipe must be set to protect the potable water sands. 1.3 Ground Water Precaution Areas Portion Section Township Range Meridian SW 30 5 33 1 Within the lands listed below, conductor pipe must be used. The use of sump equipment is not permitted, nor is land spraying while drilling. Portion Section Township Range Meridian ALL 34, 35 6 15 2 May 2018 Page 8 of 10

1.4 Perched Aquifer Area Within the lands listed below, perched aquifers occur above the regional water table and necessary precautions must be made to prevent contamination. As a minimum, conductor pipe must be used. The use of sump equipment is not permitted, nor is land spraying while drilling. Portion Section Township Range Meridian NE 35 7 5 2 NW 36 7 5 2 SE, SW, LSD 11, LSD 12 2 8 5 2 NE, NW, LSD 7, LSD 8 3 8 5 2 NE, NW, LSD 5, LSD 6 4 8 5 2 NE, NW, SE, LSD 5, LSD 6 5 8 5 2 NE, NW 6 8 5 2 NE, SE, SW 7 8 5 2 ALL 8 8 5 2 ALL 9 8 5 2 NW, SW LSD 2, LSD 7 10 8 5 2 ALL 16 8 5 2 ALL 17 8 5 2 SE 19 8 5 2 SE, SW 20 8 5 2 NE, NW 1 8 6 2 NE, NW 10 8 6 2 ALL 11 8 6 2 ALL 12 8 6 2 SE, SW 13 8 6 2 NE, SE, SW LSD 11, LSD 12 14 8 6 2 NW, SE, SW, LSD 9, LSD 10 15 8 6 2 NE, NW, LSD 7, LSD 8 16 8 6 2 LSD 15, LSD 16 17 8 6 2 LSD 1, LSD 8, LSD 9, LSD 16 19 8 6 2 ALL 20 8 6 2 ALL 21 8 6 2 NW, SW 22 8 6 2 SE, LSD 3, LSD 4 27 8 6 2 May 2018 Page 9 of 10

Portion Section Township Range Meridian SE, SW LSD 9, LSD 10, LSD 11, LSD 12 28 8 6 2 All 29 8 6 2 SE, LSD 3, LSD 4 30 8 6 2 SW, LSD 11, LSD 12, LSD 13 32 8 6 2 NE, LSD 1, LSD 8 31 8 6 2 NW, SW 5 9 6 2 NW, SE, LSD 3, LSD 6 6 9 6 2 May 2018 Page 10 of 10