STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

Similar documents
STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES. Lake Okeechobee & EAA Vol 3 A-i December 2005 Version 1 Draft 4

CLAIBORNE LOCK AND DAM PERTINENT DATA

CHAPTER 5 CULVERT DESIGN

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

Components of a Barrage

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Plan B Dam Breach Assessment

Response of a Newly Created Marsh-Wetland Affected by Tidal Forcing, Upland Discharge, and Groundwater Interaction

Section 5: Pond Outlets

General Information for Culvert Design

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Broadly speaking, there are four different types of structures, each with its own particular function:

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA,

APPENDIX H LAKE OKEECHOBEE FLOOD ROUTINES

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

Exercise (3): Open Channel Flow Rapidly Varied Flow

Annex C Temporary Fish Passage Plan

ALL TERRAIN CRANE AR-1200M-1

If you have comments on this or suggestions for other terms that should be added to this glossary, please send an to

HERBERT HOOVER DIKE REHABILITATION PROJECT

Total Dissolved Gas Properties and Processes. by Mike Schneider US Army Corps of Engineers Engineer Research and Development Center

Technical Report Culvert A Hydraulic Analysis

HYDRAULIC JUMP AND WEIR FLOW

Greenup Lock Filling and Emptying System Study

APPENDIX J HYDROLOGY AND WATER QUALITY

The Basics of Culvert and Inlet Design

TECHNICAL MEMORANDUM 002 EMORANNO. 001

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

Water budgets of the two Olentangy River experimental wetlands in 2001

STRUCTURAL STABILITY ASSESSMENT

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

OPERATION OF SPILLWAY GATES HOW TO AVOID THE PROBLEMS AND PITFALLS. Peter Allen. DERM Qld

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California

Pumping Systems for Landscaping Pumps, Controls and Accessories. Mark Snyder, PE

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

Evaluating Surge Potential in CSO Tunnels

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam

Project 184 Preferred Canal Drainage Structure and Release Point Plan

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER

Storm Damage Floating Culverts & Other Inlet Issues

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

APPLYING VARIABLE SPEED PRESSURE LIMITING CONTROL DRIVER FIRE PUMPS. SEC Project No

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018

Scott Dam Spillway Comparing Physical Model Study Results

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

FSOC Upstream Fish Passage Guidance Document

SUBMERGED VENTURI FLUME. Tom Gill 1 Robert Einhellig 2 ABSTRACT

Product Guide. Crawler Crane

CSO/STORMWATER MANAGEMENT. HYDROVEX HHV-E Vortex Driven Regulator

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

FALL PROTECTION LADDERS ACCESSWAYS

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

J.A. and Kathryn Albertson Family Foundation Boise Whitewater Park Ph II User Group Meeting 01/23/2018 Presented by: John Tensen P.E.

JAP Additional Information Sheet

Fremont Weir Fish Passage Proof of Concept. Final Engineering Report

Course Teacher: Prof. Dr. M. R. Kabir SPILLWAY & IRRIGATION PUMPS. Spillway:

HISTORY OF CONSTRUCTION

GROVE MODEL RT58D - 20 TON CAPACITY

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

SIZING OF WATER PIPING SYSTEM

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SINGLE VALVE WITH LOW-FLOW BYPASS

Installation Instructions

SUBJECT: John Day (JDA) North Fish Ladder - Trip Report for field water velocity measurements October 18 and 19, 2012.

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM

Evaluating the Spillway Capacity of the Morning Glory Spillway at Harriman Dam

Hours / 100 Marks Seat No.

Puyuan. QUY 160 Crawler Crane Technical Manual

Lecture 10 : Sewer Appurtenances

MF ER

Modelling of Pressurised Pipes within InfoWorks ICM and CS

Session C9: Priest Rapids Fish Bypass: A Case Study from Start to Finish

TDLP INC. The Dam & Levee Professionals. Kevin Chancey Sarah Edens. Monica Murie Jason Unruh

Perched Box Caisson Overview. January 2014

Transition Submergence and Hysteresis Effects in Three-Foot Cutthroat Flumes

FITNESS, SAFETY & MEDICAL SUPPLIES

ROOFING FALL PROTECTION 27.I

Physical Model Study of the San Antonio River Lock System

Float operated valve TYPE (SWDS)

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

Manual of Fisheries Survey Methods II: with periodic updates. Chapter 22: Guidelines for Sampling Warmwater Rivers with Rotenone

Water budgets of the two Olentangy River experimental wetlands in 1998

Office Use Only Fee Paid

Hydraulic Modeling to Aid TDG Abatement at Boundary and Cabinet Gorge Dams

Staying in Tune with South Florida s Water Cycle for Scientists, Managers, and Policy Makers in 5 Minutes per Week

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018

Product Catalogue DAV - P DAV - P. Air release & Vacuum Break Valves. (Plastic Air Valves) DAV - P

1 Exam Prep NSF/ANSI Tabs and Highlights


Distribution Restriction Statement Approved for public release; distribution is unlimited.

ADULT FISHWAY INSPECTIONS ON THE COLUMBIA AND SNAKE RIVERS 2012 ANNUAL REPORT

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

Experiment (13): Flow channel

Transcription:

STRUCTURE 65-B This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated vertical lift gates and a reinforced concrete lock structure with two pairs of sector gates. Operation of the spillway gates is manually controlled for all operations. The structure is located on Canal 38 about 9 miles downstream from S-65A and 23 miles downstream from Lake Kissimmee. PURPOSE This structure maintains optimum upstream water control stages in Canal 38, the Kissimmee River; it is designed to pass the design flood (30% of the Standard Project Flood) without exceeding the upstream flood design stage; and restricts downstream flood stages and channel velocities to non-damaging levels of the design flood, even if the inflow exceeds that flood; and it passes sufficient discharge during low-flow periods to maintain downstream stages and irrigation demands. SPILLWAY OPERATION This structure will be operated according to the flow chart entitled, "Operation of Kissimmee River Demonstration Project", dated November 1985, subject to hydraulic restraint, to maintain an optimum headwater elevation which varies throughout the year in accordance with the "Interim Regulation Schedule - Kissimmee River Pools", dated July 1982, between 39.0 and 42.0 feet, insofar as possible. S-65B headwater should be raised to 42 feet during high discharges (e.g., > 3000 cfs). If the headwater stage rises above the Schedule during the period May 15 to October 15, no effort will be made to return to the Schedule. Rather, the stage will be maintained until the rising Schedule is reached, whereupon the Schedule will again be followed. If the headwater stage rises above the Schedule during the remainder of the year, return to Schedule will be coordinated with the Environmental Sciences staff. The hydraulic restraint prevents damage from high velocity discharge by limiting the gate opening in accordance with the "Maximum Allowable Gate Openings" (MAGO) curve.

S-65B, Page 2 LOCK OPERATION The hydraulic system is designed to provide two gate speeds of operation. The normal speed is determined by the hydraulic pump capacity and will result in a peripheral gate speed of approximately 6.75 feet per minute which is equivalent to a full gate travel in three minutes. A manually variable slow speed is available to effect a three feet per minute peripheral gate speed. Starting and stopping of pump power unit and the direction and normal or slow speed of gate travel will be manually controlled by the operator except that the gate speed will automatically shift to slow for the last six inches of gate travel to either the full open or closed position. This six inch limit may be changed in the field as conditions dictate and the slow speed is manually variable to compensate for seasonal or other extreme variations of differential water levels. The schedule of lock operation, as established by the U.S. Corps of Engineers in accordance with the River and Harbor Act of August 8, 1917, (49 Stat. 226; 33 U.S.C. 1), is as follows: Mon. through Fri. All Year 8:00 a.m. to 5:00 p.m. Sat. and Sun. Mar. 1 thru Oct. 31 5:30 a.m. to 7:30 p.m. Sat. and Sun. Nov. 1 thru Feb. 28 5:30 a.m. to 6:30 p.m. FLOOD DISCHARGE CHARACTERISTICS Design Standard Project Flood Discharge Rate 14,000 cfs 16,700 cfs 30% SPF 100% SPF Headwater Elevation 40.0 feet 44.5 feet Tailwater Elevation 35.7 feet 39.0 feet uncontrolled uncontrolled Type Discharge submerged submerged DESCRIPTION OF SPILLWAY STRUCTURE Type reinforced concrete gated spillway Weir Crest Net Length 81.0 feet Elevation 26.3 feet

S-65B, Page 3 Service Bridge Elevation 46.5 feet Water Level which will by-pass structure 46.5 feet Gates Number 3 Size 13.8 ft. high by 27.8 ft. wide Type Vertical lift gates Bottom elevation of gates, full open 41.2 ft. Normal, 44.4 ft. Maximum Top elevation of gates, full closed 42.0 feet Control Manual Lifting Mechanism Normal power source Commercial electricity Emergency power source Gasoline motor driven generator Type Hoist Each gate operated by a hydraulic cylinder, activated by electric motor driven pump, with emergency hand pump, connected to gate by steel cables. Date of Transfer: 65B closure September 15, 1966 ACCESS: Via 4 mile access road from a point on U.S. 98 about one mile east of Lorida. HYDRAULIC AND HYDROLOGIC MEASUREMENTS Water Level Upstream recorder in lock control house, downstream recorder on lock wingwall. Remote digital headwater and tailwater recorder. Gate Position Recorder Remote digital recorder SPILLWAY DEWATERING FACILITIES Storage Okeechobee Field Station Type Steel bulkhead

S-65B, Page 4 Size and Number (per bay) The spillway gate section can be dewatered by using 11 standard bulkheads and one special bulkhead. The bulkheads shall be oriented and placed in the bulkhead recesses of S-65B spillway with the skin plate side of the bulkheads facing the spillway gate. The bulkheads can be stacked on top of each other to a maximum of six bulkheads on the upstream side and six bulkheads on the downstream side in order to dewater the spillway gate section. The one special bulkhead shall be placed first in the upstream bulkhead recess and then up to five standard bulkheads may be stacked on top of the special bulkhead. Each bulkhead is 3'-5" high, 1'-9" wide, and 28'-7" long. DESCRIPTION OF AUXILIARY STRUCTURE Additional releases may be made through culvert structure into the old channel of the Kissimmee River. This structure is located in the tie-back levee west of S-65B. Details of the structure are as follows: Distance Designation Barrels Length Diameter Invert Elev. from S-65B BX-2 1 66' 54" 29.66 3320 feet (New) S-65BX2 is used to control the water level in the Boney Marsh area, which was separated from Pool B by the Old Boney Dike, to elevation below 40. feet. S-65BX2 was rebuilt in 1994. The new S-65BX2 is controlled by flashboards to keep the headwater below 40.0. The top of the riser is 42.0. DESCRIPTION OF LOCK STRUCTURE Type reinforced concrete lock, with two pairs of gates Operating Deck Elevations 46.5 feet Lock Length 90 feet Width 30 feet Invert Elevations 25.0 & 31.0 feet

S-65B, Page 5 Gates Type Sector upper 13.5 feet Size lower 19.5 feet; 18.8 feet radius Control manual Operating Mechanism Normal Power Source commercial electricity Emergency Power Source LP engine driven generator Type double wire rope drum unit, with worm type special reducer, powered by electric motor driven hydraulic motor Dewatering Facilities Location Okeechobee Field Station Type Steel bulkheads Size and Number 5 upstream and downstream 1'-6" wide X 3'-6" high X 31'-3" long