Name of the Power Utility: Chandrapur Supher Thermal Power Station,Chandrapur Unit-3 to 7: Capacity: 2x210 MW + 3x500 MW = 1920 MW MONTH: SEPT 2018

Similar documents
FLY ASH GENERATION AND UTILIZATION DURING

Fly Ash Utilisation in Odisha

Mixing of Fly Ash in Coal Mine Overburden Dump: An Eco-friendly Method of Fly Ash Disposal

Below this line not for printing

ASIAN JOURNAL OF CIVIL ENGINEERING (BUILDING AND HOUSING) VOL. 9, NO. 5 (2008) PAGES

McIlvaine Company Hot Topic Hour. April 9, Dry Sorbent Injection Options and Issues

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Soil Stabilization using Fly Ash and Rice Husk Ash

To Enhance the Engineering Properties of Clay Bricks with use of Fly Ash

VIETNAM COAL POTENTIAL AND DEVELOPMENT ORIENTATION. Dr. Nguyen Binh VIETNAM MINING SCIENCE & TECHNOLOGY ASSOCIATION Tokyo, March 20, 2015

USE OF FLY ASH IN CONCRETE: A REVIEW

BASF s Mercury Sorbent HX A Mercury MATS Compliant Technology William Hizny, Fabien Rioult PhD, Xiaolin Yang PhD

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

EXCITING WORLD OF STEEL STRUCTURES

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES

2016 Annual Inspection Report

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

Influence of Fly Ash Content on Compaction Characteristics of Fly Ash Clay Mixture

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

March 3, 2016 Slide # 1

Potential Solutions for Mercury Control in the Cement Industry Portland Cement Association Meeting

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry

CCR Closure Plan Ash Impoundment

Curragh Curragh Mine Tour

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

2017 Annual Inspection Report

2018 Annual Inspection Report

WYDOT CONCRETE MIX DESIGN PROCEDURE

Utilization of Industrial Waste in Low Volume Roads Construction

USING ENERGY EFFICIENCY IN RESOURCE PLANS TO ARGUE FOR INCREASED ENERGY EFFICIENCY

SECTION VII ROADWAY AND SITE IMPROVEMENTS

DISASTER MANAGEMENT PLAN

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

STEEL CASTINGS. Earthmoving Equipment

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

CCR Fugitive Dust Control Plan

australian cement industry Statistics 2012

STRUCTURAL STABILITY ASSESSMENT

Amended Written Closure Plan

TURKISH CERAMIC INDUSTRY & RAW MATERIALS in TURKEY

Contractor OHS Induction. AOHS-05-GUI September 2016

Space Utilization: Building 26A Classrooom m Pilot Project November 16, 2017

AMEC010570_0001. Via . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1.

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Closure Plan for CCR Surface Impoundments

CCR Fugitive Dust Control Plan

TOPPO SHEET NO. 72P/1,72P/2

Clinker used for OPC (Tonnes)

CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION

Gas Turbine Performance Analysis

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

SMART INDUSTRIAL PARK

1 National Unit credit(s) at SCQF level 5: (1 SCQF credit points at SCQF level 5*)


CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

Draft Notification on Fly Ash Dated 6 th November 2008 from Ministry of Environment & Forests, Govt. of India

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

Mines Inspectorate Safety bulletin no. 102 (Version 1) 30 November 2010

Conservation and the use of Secondary and Recycled Materials. CC-PAV February Withdrawn

Unit 3 Trigonometry. 3.1 Use Trigonometry to Find Lengths

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

SAFETY DATA SHEET. Section 1: Identification of the substance/mixture and of the company/undertaking. Section 2: Hazards identification

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

Understanding Hydrated Lime Properties In Acid Gas Control

Kentucky Lock Project Update Inland Waterways Users Board

Understanding health and safety in gas utilisation

Frequently Asked Questions (FAQs)

Effect of Moisture Content of Wet Fly Ash on Basic Properties of Mortar and Concrete

OSHA Federal Standards October 1, 2016 September 30, 2017

FLY CASTING: FUNDAMENTALS OF A CAST OVERVIEW. Conservation / education / community

Schedule of Quantity and Rate for Annual Maintenance Rate Contract for Electrical Jobs for the year (Section-F) Cleaning Jobs.

Downloaded from Downloaded from /1

Page 1 of 5 11/18/2013 9:17 AM

Original BDS core drill from own production

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

SPECIFIC GRAVITY AND ABSORPTION OF AGGREGATE BY VOLUMETRIC IMMERSION METHOD

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Modulating liquid level regulators, direct-controlled, type SV 1 and 3 REFRIGERATION AND AIR CONDITIONING. Technical leaflet

DELHI DEVELOPMENT AUTHORITY UTTIPEC

Highway 89 Safety Enhancement and Forest Ecosystem Restoration Project

Float valves Types SV 1 and SV 3

SH&E Training Matrix (Americas, all Business Groups)

2016 Annual Inspection Report

APPENDIX P U.S. EPA WARM MODEL OUTPUT

Bruce Hinson Management Pack September 16

Different views on coal industry in Europe: SPAIN

New England Fishery Management Council

The data inputs and assumptions underlying this Reference Case are described in the Assumptions Book.

AADE-06-DF-HO-17. Cuttings boxes on North Sea drilling rig

Do upstream mining activities alter fish communities beyond a reference condition defined for the South Nahanni River and Nahanni National Park?

Management system template for operators who have a permit to discharge used or waste sheep dip to land

Transcription:

Ash Generated in Ash Design Pond Ash Ash utilized in MT during the Sept Pond ash MT during the Disposal life of Ash Availability in 218 availability in Name of Ash Disposal Area Sept 218 Area in Disposal MT up to ESP Fly Bottom Bottom MT (upto Pond Hect. Area 3.9.218 3.9.218) (1) (2) (3) (4) (5) (6) (7) (8) (9) (1) (11) 1 Chandrapur TPS Ash Bund 2668 219 6,65,73,626 1,54,48 66,21 69,52 3375 6,68,6,61 Name of the Power Utility: Chandrapur Supher Thermal Power Station,Chandrapur Unit-3 to 7: Capacity: 2x21 MW + 3x5 MW = 192 MW MONTH: SEPT 218 ASH UTILIZATION DETAILS For the Month (Sept-218) Cummulative for Year (FY 218-19) Bottom Ash Pond Ash Bottom Ash Pond ash 1 1A 1B Dry Fly Ash issued to Pond Ash issued to 568 2863 1241 1C Fly Ash issued to Bricks/Blocks/Tiles in own plant a) Dry Fly Ash used b) Pond ash issued Sub Total Total Fly Ash issued to 2 Cement Industires 568 2863 1241

For the Month (Sept-218) Cummulative for Year (FY 218-19) Bottom Ash Pond Ash Bottom Ash Pond ash 2A 2B 3 3A 3B 4 issued to Cement a) Cement 68933 296413 b) RMC c) Asbestos Sub Total 68933 296413 Pond Ash issued to Cement Total Ash issued to Cement (2A+2B) 68933 296413 Roads, Fly over/ Rail Embankment Dry Fly Ash issued for Road Pond Ash issued for Road Total Ash issued for Road 3A+3B Total Fly Ash issued for part replacement in cement in 5 Total Fly Ash supplied to 6 7 Total fly ash used for Ash dyke raising a)power Utilitu Own land b) Outside land 3375 5115

For the Month (Sept-218) Cummulative for Year (FY 218-19) Bottom Ash Pond Ash Bottom Ash Pond ash Total Fly Ash Used for 3375 5115 8 Mine Filling a) Open cast mine b) Underground Mine Total Fly Ash Useed for Mine 9 issued for 9A Pond Ash issued for 9B Total Ash issued for (9A+9B) 1 Others a) CLSM b) Cenospheres c) Bottom Ash Cover d) Any Other Total Ash issued for other purpose Grand Total 6951 3375 299276 6356

Ash Generated in Ash Design Pond Ash Ash utilized in MT during the Sept Pond ash MT during the Disposal life of Ash Availability in 218 availability in Name of Ash Disposal Area Sept 218 Area in Disposal MT up to ESP Fly Bottom Bottom MT (upto Pond Hect. Area 3.9.218 3.9.218) (1) (2) (3) (4) (5) (6) (7) (8) (9) (1) (11) 1 Chandrapur TPS Ash Bund 2668 219 6,65,73,626 82,48 35,164 861 2.11 6,68,6,61 Name of the Power Utility: Chandrapur Supher Thermal Power Station,Chandrapur Unit-8 & 9: Capacity: 2x5 MW = 1 MW Month: SEPT-218 ASH UTILIZATION DETAILS For the Month Sept-218) Cummulative for Year (FY 218-19) Bottom Ash Pond Ash Bottom Ash Pond ash 1 1A 1B Dry Fly Ash issued to Pond Ash issued to 861 2 644 53 1C Fly Ash issued to Bricks/Blocks/Tiles in own plant a) Dry Fly Ash used b) Pond ash issued Sub Total Total Fly Ash issued to 2 Cement Industires 861 2 644 53

For the Month Sept-218) Cummulative for Year (FY 218-19) Bottom Ash Pond Ash Bottom Ash Pond ash 2A 2B 3 3A 3B 4 issued to Cement a) Cement 327 b) RMC c) Asbestos Sub Total 327 Pond Ash issued to Cement Total Ash issued to Cement (2A+2B) 327 Roads, Fly over/ Rail Embankment Dry Fly Ash issued for Road Pond Ash issued for Road Total Ash issued for Road 3A+3B Total Fly Ash issued for part replacement in cement in 5 Total Fly Ash supplied to 6 7 Total fly ash used for Ash dyke raising a)power Utilitu Own land b) Outside land

For the Month Sept-218) Cummulative for Year (FY 218-19) Bottom Ash Pond Ash Bottom Ash Pond ash Total Fly Ash Used for 8 Mine Filling a) Open cast mine b) Underground Mine Total Fly Ash Useed for Mine 9 issued for 9A Pond Ash issued for 9B Total Ash issued for (9A+9B) 1 Others a) CLSM b) Cenospheres c) Bottom Ash Cover d) Any Other Total Ash issued for other purpose Grand Total 861 2 36251 53