Eastern PA Trail Summit October 1, 2018

Similar documents
RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Bicycle Master Plan Goals, Strategies, and Policies

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Plant City Walk-Bike Plan

Chapter 5 Future Transportation

Bicycle and Pedestrian Plans and Improvements

ACTIVE TRANSPORTATION

Executive Summary Route 30 Corridor Master Plan

Transportation Master Plan Advisory Task Force

Living Streets Policy

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

EXECUTIVE SUMMARY. Vision

Environment and Public Works Committee Presentation

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Section 9. Implementation

WELCOME. City of Greater Sudbury. Transportation Demand Management Plan

City of Waterloo Complete Streets Policy

Perryville TOD and Greenway Plan

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

CITY OF CAMBRIDGE 2015 BICYCLE PLAN TOWARDS A BIKABLE FUTURE

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

PEDESTRIAN ACTION PLAN

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Chapter 5. Complete Streets and Walkable Communities.

Washington County, Oregon

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

Develop a Multi-Modal Transportation Strategy (Theme 6)

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

North Coast Corridor:

Tonight is for you. Learn everything you can. Share all your ideas.

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Performance Criteria for 2035 Long Range Transportation Plan

WELCOME TO OPEN HOUSE # 1 June 14, 2017

City of Novi Non-Motorized Master Plan 2011 Executive Summary


AMATS Complete Streets Policy

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Welcome. Background. Goals. Vision

Safe Routes to School Grant Application Phase I March 2014

Goals, Objectives, and Policies

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

We believe the following comments and suggestions can help the department meet those goals.

Speed Limits Study and Proposal. Public Input Session: 8/14/13

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Complete Streets Successes, Opportunities, and Challenges

Ann Arbor Downtown Street Plan

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

BID Strategy Group and Stakeholders Meeting. April 17, 2018

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

Bicycle and Pedestrian Connectivity Study Phase 2

Borough of Danville, PA Traffic Calming Program Guidelines

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

San Jose Transportation Policy

Bicycle and Pedestrian Planning in a Historically Car-Centric Culture: A Focus on Connectivity, Safety, & Accessibility

This page intentionally left blank.

CHAPTER 3: Vision Statement and Goals

Transportation Assessment

STONY PLAIN ROAD STREETSCAPE

Active Transportation Infrastructure Investment A Business Case

Land Use Patterns. Traditional Modern

T1-A - Service Reduction (Re-sizing)

MASTER BICYCLE AND PEDESTRIAN PLAN

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH

East Burke Transportation, Safety and Capacity Improvements

Transportation Action Plan. Transportation & Planning Committee March 14, 2016

Linking Transportation and Health in Nashville & Middle Tennessee

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

Appendix C 3. Bicycle / Pedestrian Planning

2. Context. Existing framework. The context. The challenge. Transport Strategy

TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031

BIKE PLAN CONTENTS GATEWAY

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

5. Pedestrian System. Accomplishments Over the Past Five Years

Prioritizing Transportation Policy and Funding for Active Transportation, Safety, Equity and Health

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009

Transportation Element

Welcome and Introductions Overview of the Study to Date Community Involvement Intersection Improvement Concepts Bike-Ped Recommendations ITS

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

The Role of MPOs in Advancing Safe Routes to School through the Transportation Alternatives Program

Providing an Efficient and Multi-modal Transportation System

Vision to Action Community Coalition February 14, 2014 Briefing

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

NEWMARKET UPHAM S CORNER

Transcription:

Eastern PA Trail Summit October 1, 2018

WHO WE ARE + WHY + WE RE * HERE * * * * * *

Session Goals: Discuss how to coordinate planning and design in small, urbanized towns Consider how to develop alternative transportation networks with interconnectivity and context in mind Establish methods for prioritizing potential solutions Develop questions to bring forward to stakeholders to increase collaboration

What is Connect the DOTS? (Design of the Street) LVPC program offered to a select community (undergoing rapid change), combining urban design with strategic planning and community development to Better facilitate sustainable economic opportunities Revitalize Improve connectivity Improve transportation safety

Catasauqua Front Street Study (2015) Goals Widen primary intersection to relieve peak hour congestion and improve overall traffic flow. Support Borough s revitalization goals by increasing connectivity to the business district. - Slow traffic down - Improve safety - Reinforce traditional neighborhood character

The case study: Bath Borough

STUDY AREA

STUDY AREA Nearest trailhead (Nor-Bath Trail) Proximity to D&L Trail (general route)

STUDY AREA

STUDY AREA Nor-Bath trail head

What were our goals?

Project Goals SAFETY FOR ALL USERS INTEGRATE TRANSPORTATION NETWORKS ANALYZE PARKING + CONNECTIVITY PREPARATION FOR BOROUGH S GROWTH

Trail Benefits Establishing a community as a viable trail destination mandates that businesses take entrepreneurial risks while working together with other businesses to build critical mass. Trail planning in urban areas requires cooperation and coordination from different political jurisdictions, and public and private entities. Trails are one element of a larger visitor experience. Providing other opportunities (including non- recreational) draws a more diverse group of visitors and a greater variety of businesses. americantrails.org, Implementing Trail-Based Economic Development Programs: A Handbook for Iowa Communities $795 million spent annually on Lehigh Valley recreation

Key questions when considering reality of goals

Who needs to be involved in initial planning discussions? Municipal manager (provide data) Trail stakeholders (information on connections) County representatives (policy experts) PennDOT (funding, long-range opportunities) LVPC (planning support and expertise) Residents (local knowledge)

Who needs to be involved in implementation later? Municipality Schools Business owners Neighboring communities Local bike + pedestrian advocacy groups Police Who else?

Setting the stage What exactly are we dealing with?

Timeline Data + site visits + analysis + surveys + stakeholder meetings Mgr. Flynn + LVPC meeting LVPC visit Borough council LVPC external meetings LVPC visit Borough council Final project to community Fall 2016 Define issues Public survey Winter / Spring 2017 Collect data + Site Visits PennDOT/Engineers Northampton County Summer/Fall 2017 Winter 2017 Develop recommendations Progress update Spring 2018 Phase I project begins Phase II project begins LVPC prepares final report

We learned there are plans to connect the D&L Trail into Bath in the near future and more than half of project survey respondents said they own a bicycle. There is currently an estimated 150 miles of cycle-friendly trails in our region.

We learned that in the next 20 years there will be more than 30% more vehicles on the Borough s roads than today.

We learned At certain points on Bath s roads nearly 12,000 vehicles pass through daily and 16% of them are estimated to be tractor trailers. DAILY TOTAL VEHICLES AT SELECT LOCATIONS

Did We learned you know that when Bath residents identified their primary method of transportation in 2015, 970 people said they drove a vehicle alone, 47 rode in a carpool, and no one used a bicycle. The data below is from a 2017 survey of 82 Bath residents and reinforces that the majority of people s lifestyles and values prioritize vehicle ownership.

Did We learned you know that of the 31 reportable crashes in 2016, only 1 was involving a tractor trailer. -PennDOT data

Did you know We learned That the borough recently adopted an ordinance to allow for mixed use zoning in a selection of parcels in the historic district. A second ordinance lifts the requirement of these potential new uses from needing to provide more off-street parking than what existed as of 2013.

New mixed uses = Economic growth Increased foot and bike traffic Increased vitality Opportunity to build on borough s identity Potential new traffic, but Potential to re-frame idea of parking as a paid service

Did you know We learned about an opportunity. The weight-restricted bridge on Mill Street (currently a problem area for tractor-trailers) recently changed ownership and is currently being upgraded to safely accommodate heavier loads. It also happens to be immediately adjacent to the proposed Bath trailhead of Nor-Bath Trail.

Did you know We learned that local school children were being bused where possible (even for short distances) because crossing guard service had been removed due to safety concerns.

We learned that there are 255 on-street parking spaces in the Borough study area and 919 off-street parking spaces in or adjacent to the study area. What about bike parking?

We learned that of 255 available on-street parking spaces in the study area, only a maximum of 59% of spaces were occupied when counted at 4 different times on two random days

We learned that there are 12.8 miles of sidewalks in the entire borough and where there are gaps.

We learned that PennDOT has road projects planned in Bath totaling $17.8 million as part of the Transportation Improvement Program (TIP) in the next 7 years. 1, 3, 4, 5, 6 Resurfacing project 2 Realignment project

Re-calibrate to make a plan

What are the most critical issues? Safety, particularly for children Traffic congestion at certain spots Concerns about parking capacity Struggle to accommodate alternative modes What is holding the borough back from being better connected? Street markings don t encourage bicycle use or help pedestrians cross safely Incomplete or badly maintained sidewalk infrastructure Lack of funding (competition for grants) No room to accommodate expansion of roads Outdated policy Lack of cross-municipal collaboration

What are the opportunities? New mixed use zoning overlay to encourage revitalization of historic core Pending land-swap with Keystone Cement for development of trail connection Scheduled PennDOT works Policy updates (comp. plan) Size of borough is very walkable Pride of place through existing programming (Spuds + Suds, parades, farmers market)

Informed recommendations + potential outcomes

Analysis Recommendations + Recommendations POLICY PHYSICAL BEHAVIOR

Short-term (up to 1 year) Delineate all existing on-street parking spaces Form a transportation steering committee Design and adopt a Complete Streets Policy Introduce more paid parking Generate discussions around the amendment + addition of multimodal policies to Bath Comprehensive Plan Utilize a tech-assist

Complete Streets streets for everyone Enable safe access for all users through strategic design Planting strip Active sidewalks Dedicated bike lanes Active roadway Safe crosswalks Green spaces Think about context!

Existing S. Chestnut Street (987) looking north

Proposed S. Chestnut Street (987) looking north

Mid-term (1-5 years) Install urban design and speed-reduction treatments Evaluate impact of the new borough building parking lot Evaluate impact of police department changes on annual tickets + collisions Monitor changes in traffic demand in relation to current signal timings Support the completion and connection of the Nor- Bath Trail

Existing Intersection of W. Main Street and S. Chestnut Street (987)

Proposed Intersection of W. Main Street and S. Chestnut Street (987)

Long-term (5-10 years) Convert Mill Street to truck route alternative with Bridge 115 improvements (currently in engineering stage) to increase vehicle weight limits and the incorporation of pedestrian + cycling improvements Monitor Bridge 248 re-routing effects following PennDOT work (to commence in 2019)

Existing - Mill Street looking east towards S. Walnut Street (512)

Proposed - Mill Street looking east towards S. Walnut Street (512)

Placemaking opportunity Tiny Stage

Placemaking opportunity Community Garden

Placemaking opportunity Tiny Library

Potential Outcomes Stronger borough identity Toolkit of safety strategies Spatial and programmatic connectivity Changed perception of parking + vehicle travel Flexibility + adaptability to future

Contact Whitney Burdge Urban Design Planner wburdge@lvpc.org 610-264-4544 Brian Hite Senior Planning Technician bhite@lvpc.org 610-264-4544

Coming Up Future LV Landing 2019