City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Similar documents
Tonight is for you. Learn everything you can. Share all your ideas.

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Major Bike Routes 102 Avenue Workshop April 21, 2015

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Welcome to the Sellwood Bridge Project Open House!

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

PROJECT FACT SHEET March 21, 2018

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

PROJECT FACT SHEET May 25, 2018

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Please see the attached memo for additional project background and information.

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

122 Avenue: 107 Street to Fort Road

Bicycle Facilities Planning

Capital Crescent Trail Crossing at Little Falls Parkway

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

5. RUNNINGWAY GUIDELINES

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Broad Street Bicycle Boulevard Design Guidelines

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Thank you for attending

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Cincinnati Dayton Rd Widening

Comments EXECUTIVE SUMMARY

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Public Information Centre

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Transportation Planning Division

SAFE ROUTES TO SCHOOL (SR2S)

North Avenue Corridor Study

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

RED BANK CORRIDOR. Community Partners Committee Meeting Madisonville Recreation Center. May 21,

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Why invest in the 1 Street S.W. Corridor?

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

FOLSOM-HOWARD STREETSCAPE OVERVIEW

County Board Workshop

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Public Information Meeting

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Transportation Planning Division

EXECUTIVE SUMMARY. Vision

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area

Columbia Pike Implementation Team (CPIT) Meeting

C C C

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

Active Transportation Rail to River Corridor. Community Meeting - Segment A

Omaha s Complete Streets Policy

This page intentionally left blank.

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Technical Working Group November 15, 2017

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

CSAH 101 Preliminary Design

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

MASTER BICYCLE AND PEDESTRIAN PLAN

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Active Transportation Facility Glossary

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Community Task Force March 14, 2018

Org Chart. Steering. Committee. Project Advisory. Committee. Nicole Losch, PTP Senior Transportation. Bryan Davis, AICP Senior Transportation

Lawrence Loop SWOT Analysis

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Pedestrian & Bicycle Safety Innovations & Applications

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Geary Bus Rapid Transit Project

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

Committed to Service

Clay Street Bridge Replacement Project

Transcription:

Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway design Talk to project staff Share your thoughts 8:00 p.m. Event ends

Project Overview The City of Sammamish is planning to widen Issaquah-Fall City Road from 242nd Avenue SE to Project map Klahanie Park Issaquah-Beaver Lake Road. This project will: Improve safety for drivers, cyclists, and pedestrians along the roadway, and at intersections SE Klahanie Blvd Yellow Lake 247th Pl SE Klahanie Shopping Center Issaquah-Beaver Lake Rd Phase II Issaquah-Fall City Rd 256th Ave SE Duthie Hill Park Endeavour Elementary School Improve operations at intersections Phase I North Folk Issaquah Creek Klahanie Dr SE Increase capacity with additional travel lanes Pacific Cascade Middle School 242nd Ave SE Protect mature trees and environmentally sensitive areas where possible N

Project Schedule Project schedule We are here 2016 2017 2018 Phase I Design Spring Summer Fall Winter Spring Summer Fall Winter Community Meeting 1 Develop Design Options Community Meeting 2 Preliminary Design Council Selects Bridge Crossing and Reviews Design Intermediate Design Community Meeting 3 Final Design Community Meeting 4 Community Workshop Phase I Construction: Anticipated 2018-2019 Phase II Design: Planned 2018-2019 Phase II Construction: Anticipated 2021-2022 Community outreach and City Council updates will be ongoing throughout the duration of the project. The City has been working with the community and City Council as they consider options and refine the roadway design. In early 2017, Sammamish City Council reviewed the The design was developed based on feedback received through two public workshops, multiple stakeholder meetings, online comments, and City Council meetings. current design and selected the bridge option for the North Fork Issaquah Creek crossing.

What We ve Heard Over the past year, the City has gathered feedback on roadway design through two public workshops, meetings with residents, businesses and organizations along the corridor, online comments, and briefings with the Transportation Committee and full City Council. Based on this feedback, the City has identified three key priorities: Safety Future Operations Environment Intersections should be safe for pedestrians, particularly where children cross Issaquah- Fall City Road Improve safety for all users throughout the corridor Adding capacity to the roadway is a must Reduce congestion and improve operations at intersections The new roadway should provide environmental benefits for the area, particularly the North Fork Issaquah Creek and wildlife Protecting and maintaining access to the Klahanie Trail is a priority in Phase I and Phase II

City of Sammamish SE Pl 24 7t h 24 2n d Av e SE Klahanie Dr SE Roadway Design N Design shown is preliminary. Exact roadway details, such as width and roundabout locations within the intersection, are still being developed. The design consists of: Two travel lanes in each direction Two-lane roundabouts at each intersection (242nd Avenue SE, 247th Place SE, and Klahanie Drive SE) Bridge crossing where Issaquah-Fall City Road crosses the North Fork Issaquah Creek Separated sidewalks on both sides of the road between 242nd Avenue SE and 247th Place SE Sidewalk on the north side of the road between 247th Place SE and Klahanie Drive SE Regrading to improve sight lines Raised center median High-intensity Activated crosswalk (HAWK) beacon at Pacific Cascade Middle School Buffered bike lane Green infrastructure to help protect water quality

Design Benefits 242nd Avenue SE Based on feedback received 242nd Ave SE from the community and City Council, the roadway design includes: Safety Eliminate left turn vehicle conflicts; use ISSAQUAH-FALL CITY RD roundabout as a U-turn Buffered bike lanes Pedestrian refuge islands at crosswalks Operations Two-lane roundabout to keep traffic moving through intersection EASTRIDGE CHURCH Design shown is preliminary. Exact roadway details, such as width and roundabout locations within the intersection, are still being developed. Potential property impact Sidewalk Buffered bike lane Landscape area N Environment Minimal widening of roadway to reduce impervious pavement while adding capacity Minimize mature tree removal, where possible

Design Benefits 247th Place SE SE 46TH TERRACE 247TH PL SE Based on feedback received from the community and City Council, the roadway design includes: SE 46TH Pl Safety HAWK signal for safe ISSAQUAH-FALL CITY RD pedestrian crossing at school entrance Buffered bike lanes Pedestrian refuge islands at crosswalks PACIFIC CASCADE MIDDLE SCHOOL Design shown is preliminary. Exact roadway details, such as width and roundabout locations within the intersection, are still being developed. Potential property impact Sidewalk Buffered bike lane Landscape area N Operations Two-lane roundabout to keep traffic moving through intersection Right-turn slip lanes out of Hunter s Ridge Environment Minimal widening of roadway to reduce impervious pavement while adding capacity Minimize mature tree removal, where possible

Design Benefits 242nd Avenue SE to 247th Place SE - Rendering Design shown is preliminary. Exact roadway details, such as width and roundabout locations within the intersection, are still being developed.

Design Benefits Klahanie Drive SE Based on feedback received from the community and City Council, the QFC SHOPPING CENTER roadway design includes: Safety Eliminate left turn vehicle conflicts; use roundabout as a U-turn Buffered bike lanes Pedestrian refuge islands at crosswalks ISSAQUAH-FALL CITY RD Operations Two-lane roundabout to keep traffic moving through intersection 252ND AVE SE Design shown is preliminary. Exact roadway details, such as width and roundabout locations within the intersection, are still being developed. Potential property impact Sidewalk Buffered bike lane Landscape area N Right-turn slip lane out of Klahanie Environment Minimal widening of roadway to reduce impervious pavement while adding capacity Minimize mature tree removal, where possible No impacts to Klahanie Trail

Design Benefits 242nd Avenue SE to 247th Place SE 245th LN SE ISSAQUAH-FALL CITY RD PACIFIC CASCADE MIDDLE SCHOOL Potential property impact Sidewalk Buffered bike lane Landscape area N Design shown is preliminary. Exact roadway details, such as width and roundabout locations within the intersection, are still being developed. Based on feedback received from the community and City Council, the roadway design includes: Safety Buffered bike lanes Separated sidewalks on both sides Raised median to reduce vehicle conflicts Operations Two-lane roadway in each direction Environment Green space along roadway Minimal widening of roadway to reduce impervious pavement while adding capacity Green infrastructure to help control stormwater

Design Benefits 247th Place SE to Klahanie Drive SE NORTH FORK SHEPERD OF THE HILLS ISSAQUAH CREEK LUTHERAN CHURCH APPROXIMATE 460-FT BRIDGE LIMITS ISSAQUAH-FALL CITY RD Potential property impact Sidewalk Buffered bike lane Landscape area N Design shown is preliminary. Exact roadway details, such as width and roundabout locations within the intersection, are still being developed. Based on feedback received from the community and City Council, the roadway design includes: Safety Buffered bike lanes Separated sidewalks on north side Raised median to eliminate vehicle conflicts Operations Two-lane roadway in each direction Environment Bridge minimizes impacts to wetlands Minimal widening of roadway to reduce impervious pavement while adding capacity

Roundabout Safety Reduce injury crashes by 75% compared with intersections using stop control or traffic signals Lower speeds mean shorter braking distances and longer decision-making time Fewer conflict points 8 at a roundabout 32 at a four-way intersection Reduce average delay time by 50% for vehicles passing through the intersection WHY ROUNDABOUTS? Shorter wait time and crossing distances for pedestrians because of refuge islands Improve capacity and shorter wait times for vehicles through intersections Higher visibility of pedestrians in crosswalks Improve safety for all users, including pedestrians and bicyclists Data sources: Insurance Institute for Highway Safety, WSDOT Roundabout Benefits, FHWA/Safe Routes to School

Roundabout Safety: Pedestrians To keep pedestrians safe at roundabouts the City is: Installing a HAWK (High-intensity Activated crosswalk) beacon away from the 247th Place SE intersection to align with the school entrance. HAWK signals: -- Provide a highly-visible, signalized crossing for pedestrians -- Are activated by pedestrians not signal timing, reducing delays to car traffic Providing roundabout safety education, including a potential safety course at schools Including refuge islands at all crossings; pedestrians only focus on one direction of traffic at a time Installing improved lighting for night-time visibility

City of Sammamish Corridor Design Features We love to hear your thoughts. What would you like to see? The City is starting to think about design features for the corridor, including: Landscaping and plantings Lighting Bridge railing Low-impact development

Culvert Replacement: Bridge The culvert that supports Issaquah-Fall City Road where it crosses the North Fork Issaquah Creek will be replaced as part of the roadway improvements. After discussion and review by the Transportation Committee and the full City The bridge: Minimizes impacts to wetlands Improves wildlife habitat Adds visual design details with a longer railing Council, a bridge was selected as the preferred alternative for the culvert crossing. Improves safety by raising the roadway profile creating improved sight lines Can be constructed while leaving one lane of traffic open in each direction

Detour Route and Construction Planning Working with you to reduce impacts Construction of the new roadway will likely result in partial closures, traffic shifts, and detours. It is the City s goal to work with residents affected by construction, as well as residents along the detour route, during the planning process to identify and mitigate potential concerns and issues. Opportunities to identify solutions Over the next several months, the City will engage community members to identify solutions which may lessen impacts during construction and mitigate impacts when possible.

Thank You for Participating Tonight! What s next: Detour route and construction planning workshop Please stay tuned for details of a detour route and construction planning workshop to be held in fall 2017. This will be an opportunity to share concerns about potential construction impacts and give input on possible road closure and detour options during construction.